Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
IN CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2019-00107 TtGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04/24/2019 Parcel: 2S112DA01400 Jurisdiction: Tigard Site address: 15350 SW SEQUOIA PKWY 150 Project: Financial Investments Subdivision: 1996-048 PARTITION PLAT Lot: 2 Project Description: TI for new tenant: New walls,suspended ceilings,and doors. Contractor: MATTHEW OLSON CONSTRUCTION Owner: PACIFIC REALTY ASSOCIATES 5320 SW DOVER LN ATTN: N PIVEN PORTLAND, OR 97225 15350 SW SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-892-0066 PHONE: FAX: 503-892-0067 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB DC Provision Review,COM TI-Ping 04/24/2019 $98.00 Occupancy Grp: B Occupancy Load: 24 Permit Fee-Additions,Alterations, 04/24/2019 $744.51 Demolition Dwelling Units: 0 12%State Surcharge-Building 04/24/2019 $89.34 Stories: 0 Height: 0 ft Plan Review 04/24/2019 $483.93 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 04/24/2019 $297.80 Value: $51,793 Info Process/Archiving-Lg$2.00(over 04/24/2019 $4.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,717.58 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Perei+Etee Signature: 1� all 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial FOR OFFICE USE OVI.I' ' y Citof Ti and Received `.1 g DateB : �� Permit No.: A IA c.y t , ~ 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review ( ' (� I ■` Phone: 503.718.2439 Fax: 503.598.1960 .II Date/ e: i i 7 — Other Permit 1. _ Inspection Line: 503.639.4175 RECEIVEEDate Ready/By: 'IPage 2 for 1.1G A k2 D ;� See Internet: www.tigard-or.gov APR O Notified/Method: I Supplemental Information ,' t\` �w,. u. ;,;.�•<,f . �i X11 1 �> ...... .,A,-;',': ...:': N�" .at' ...,. 0, ; . ,�., , ❑New construction 0 De`mo t ton, :7 'y' Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the -__ work indicated on this application. . -. CATgGf)� t t3F 1,ONSTIII< 7`JcTIONt, Valuation: $ ❑ 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: Sl1NF0 11:9NL-\tAND (}LATIoN St Total number of floors: Job site address:15350 SW Sequoia Parkway New dwelling area: square feet City/State/ZIP:Portland,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.:Ste.150 Project name:Finanical Investment Team Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet H* I I #, c)/zi4MI , CIL-TJS ` C i Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials, labor,overhead,and theprofit for the EIA fla DSCIIIIUN p -.WOW work indicated on thisapplication Project consists of remodel work of 2,379 SF usable and 2,781 SF rentable of Valuation: $$51,793.00 existing vacant office space.Work shall include but not be limited to drywall/ Existing building area: 2,379 square feet metal studs,suspended ceilings,doors/frames and painting. New building area: 2,379 square feet ►moi PI(OWRTY=1) ,i T NANT'. f4. Number of stories: 3 Name:Pacific Realty Associates,LP. Type of construction: II-B Address:15350 SW Sequoia Parkway,Suite 300 Occupancy groups: City/State/ZIP:Portland,OR 97224 Existing: B Phone:(503)624-6300 Fax:(503)624-7755 New: B 0 $ i .Q.,,..ONTAOT r t $i)ITaI)TNGV , I ¢' '. Business name:Pacific Realty Associates,LP (Please ' W .••• • -- Structural plan review fee(or deposit): Contact name:Ryan McGuire FLS plan review fee(if applicable): Address:15350 SW Sequoia Parkway,Suite 300 Total fees due upon application: City/State/ZIP:Portland,OR 97224 Amount received: Phone:(503)624-6300 Fax::(503)624-7755 E-mail:permits@pactrust.com/ryanm@pactrust.com O" OV©LT s LAR PAI FaL l'S ° BS* Y l i - Commercial and residential prescriptive installation of C �,4,, { OR • • ;.. ;t, * It' l.a . roof-top mounted PhotoVoltaic Solar Panel System. Business name:Matthew Olson Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:5320 SW Dover Lane Solar Installation Specialty Code checklist. City/State/ZIP:Portland,OR 97224-1025 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)892-0066 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.: 198796 Total fee due upon application: $201.60 -7"Ctt 'c. tRCK'i. ACLOC.fc-r'Y`T, L.,>. Authorized signature: t�j�f_ i‘ L_ This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Richard J.Krippaehne Date:4/23/19 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) P City of Tigard • BUILDING DIVISION ■ Over-The-Counter (OTC) Building & Fire Protection System Permit -r A I.F) Appointment Checklist Permit Record#: j/q 0D lv'-7 Contact Name: Ct _ /O z , Phone #: .5 03 (Z/;t/ Business Name: Ae, Appt. Date/Time: _`/ l _ ; Site Address: S-3 O St ti Sc y r r of Gj Bldg/Suite #: f Project Name: out 1,1 G _y vrst-Fhj-t1 IdlNew Tenant? 0 Yes 0 No Project Description: 5& S Terme .� (°rel' 1 G�ts�/Z J lT�itGe' kee• -/rS✓ er i u ( ' e:'Kv a tea et!‘,14$.144.1 ei2-64.4 Existing Use: New Use: MMD Required: 0 Yes 0 No Related Record#: APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION Class of Work: Q Occupancy Group: Type of Construction: Q Type of Use: - Occupancy Load: Oregon Specialty Code: 1(`71 SPECIFICS Number of Stories: Building Height Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback-Left Sideyard Setback Front Sideyard Setback-Right Sideyard Setback-Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: � t� Fire Alarms: Smoke Detectors: Sprinkler Type: Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: Hazard Group: Battery Calcs Provided: Density: Cut Sheets Provided: Design Area: K Factor: Total Project Valuation: $ 5-7) 7, 3 . 00 $ '4."L- DC Prov Rvw,COM TI-Ping 7419• S'1 Permit Fee-Add,Alt,Demo DC Provision Review Fee for COM TT( �7/1/2U1 effect ve T , .314- 12"/e 5tateuxc?iage Project Valuation $ 31: . •_ PIan Review,Structural Up to$4,999 $0.00 $ - ' . ;O Plan Review,Fire Life Safety $5,000-$74,999 $98.00 $ -- Info Proc/Arch,Lg(over 11x17$2.00) $75,000-$149,999 $243.00 $ Info Proc/Arch,Sm(up to 11x17$0.50) $150,000 and over $388.00 $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Misc.Admin Fee $ Other: Building Staff: $ Other: Date/Time: al 1 E I TOTAL FEES DUE I:\Building\Forms\OTC_BUP FPS_07011&dacx Julie Drinkwater From: Casey Heaney <CaseyH@PacTrust.com> Sent: Wednesday, April 24, 2019 10:22 AM To: Branden Taggart Cc: #Building Permit Technicians Subject: RE:OTC Request - Financial Investment Team Yes!! You are wonderful! Thank you so much Branden! I will be there!! Casey Heaney(Dolliver) Construction Administrative Assistant PacTrust 15350 SW Sequoia Parkway Suite 300 Portland OR 97224 Main 503.624.6300 Direct 503.603.5434 caseyh(apactrust.com www.pactrust.com From: Branden Taggart<brandent@tigard-or.gov> Sent:Wednesday,April 24, 2019 10:16 AM To:Casey Heaney<CaseyH@PacTrust.com> Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Dick Krippaehne<DickK@PacTrust.com> Subject: RE: OTC Request- Financial Investment Team Casey, I spoke with Tom, and we can fit you in at 2:00 this afternoon for an OTC. Will this work for you? Thanks, 1 City of Tigard INCOMMUNITY DEVELOPMENT DEPARTMENT ■ T l c a x o Building Permit Review — Commercial - No Land U s e Building Permit #: �a> �� � , 7 Site Address: I t/'1)�Q ��1�/ e Vflt \),1 Suite/Bldg#: D Project Name: .'►IflAYI0 d t l\fQO1'-011t TeMl 11`i` (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: T1 . -Pt i .6(t, \1V1J ACP Existing Business Activity: AU Proposed Business Activity: o1.K.Q Verify site address/suite# exists and active in permit system. iqRiver Terrace Neighborhood: CIYes VI No Zoning: I- P sq Permitted Use: ❑ Yes ❑ No ❑ Spec Space Confirm no land use required. Business License: Exists: .-Yes El No,applicant notified to obtain business license Notes: Approved by Planning: g %tJA ` Date: LI 2-`7 Revisions (after Building Submittal'Ply) Reviewer Date Revision 1: El Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved Cl Not Approved Building Permit Submittal Original Submittal Date: Site Plans: # /14/4.. Building Plans: # 3 Building Permit#: I 'nt`er building permit#above. Workflow Routing: �f'nning ❑ Permit Coordinator ±ding Workflow Sign-off: RJ 'ign-off for Planning(include notes from planning review) Route Application Documents: ul ding: original permit application, site plans,building plans, engineer and /./)7"? }� beam calculations and trust details,if applicable,etc. Notes: �:✓.o" C By Permit Technician: Date: ���, I:\Building\Forms\BldgPermitRvw_COM NoLandUse_060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\BldgPermitRvw_COM NolandUse_070915.docx City of Tigard Tel: 503.718.2439 Location: Inspection Date: 15350 SW SEQUOIA PKWY 150, TIGARD, June 18, 2019 at 7:40:55 AM OR, 97224 Record Type: Record ID: Commercial - Building BUP2019-00107 Inspection Type: Inspector: 299 Final inspection Chip Barnett Result: PASS - CofO Comments: Violation Summary: Inspector Contractor