Covered Patio Structure
ORE
Project Information
Job Number: 19-014
Date:April 12, 2019
Client: Chad Bunger
Covered Patio Structure_Beam Hanger
Chad,
Per your request we have checked to see if the beam hanger can be removed. We
found that the load on the beam was minimal and could easily be supported by the wall
built underneath it.The attached shows the specific hanger than is no longer required.
Please don't hesitate to contact us with any questions.
Allan Tompkins, PE
Principal
Core StructuresEp PROp&_
0�`� GINEF >O
kr R 7
83021PE r
,C mrit L1 2
,1FQ OREGON �1
I°9`W rFM6ER� stS'
4''AMES TOM"
EXPIRES:6/30/2020
2988 NE ROCK CHUCK DR,BEND OR 97701
T(541)408-1580 U WWW.CORSTRUC.COM
• r
6X6 VERTICAL TO SUPPORT RIDGE
2X6 COLLAR TIES AT 16" O.C.
WI(5)16d COMMON NAILS AT RAFTER
\TO COLLAR TIE CONNECTION
2X6 RAFTERS 0 16" O.C.
COMPOSITION ROOFING OVER 7/16"
OSB SHEETING 24/0 IN/ 8D AT 6"
O.C. EDGES AND 2' O.C. FIELD.
SIMPSON BC6 POST
CAP,TYP
_ I
J .4 MA
DF #1 BEAM1 _: AMT0
6 POST
HUC610 HANGER
NOT REQUIRED ON
THIS SIDE. SHEAR WALL
I
-.• 11117
PB66 BASE
"I 7
4" THICK CONCRETE SLAB
7
11
Z_
60
SECTION