Report °P-J45 WC6^N. 417173
Ghafari Project Number: 187747 RECEIVED
R I
Document Release 02 MAR 14 2019 FA
Date: 03/08/19 CITY OF TIGARD
BUILDING DIVISION
PROJECT: Altar'd State Washington OWNER Altar'd State
Square
ISSUE DESCRIPTION: IFP - Building PROJECT MGR. Meghan Frederick
INSTRUCTIONS
I. These documents are released by the Architect/Engineer for:
El Review
® Permits
❑ Bid
❑Construction
❑ Modification of Prior Document Release (Addendum I Bulletin / Revision)
Record
2. Documents: Documents included in this Release supersede and replace those of prior releases.
3. Do not proceed with Work until authorized
4. Immediately notify the folly entity Work underway by this Release.
Immediately tt�.0 to tc.ty ttv ltl�/ the following of Work presently UIIU GrVVay that is affected lJ�!this
Architect I Engineer
El Construction Manager
5. Drawing revisions are clouded.
6. Specifications, Bidding Requirements, and Contracting Conditions revisions show added text bold and deleted text
struck through. A vertical line in the page margin appears next to each revision.
7. If a bid is requested, comply with the requirements of the Bidding Requirements or follow the procedures used by the
Construction Manager, as applicable.
8. If a price quotation is requested, quote items as listed in the "Quotation Breakdown"at the end of this release form or
in accordance with the instructions of the Construction Manager, as applicable. Items are a synopsis of the work
required,not an exhaustive list; include all incidental work necessary to complete each item.
Documents listed are applicable to this Document Release:
PROJECT MANUAL
Specification Sections accompanying and forming part of this issue:
® None
❑ See Master Specification Index
DRAWINGS
Drawings accompanying and forming part of this issue:
❑ None
® See Master Drawing Index
ATTACHMENTS
Attachments accompanying and forming part of this issue:
❑ None
® As follows: Structural Calculations
Comcheck
INDEMNIFICATION:
The Contractor shall indemnify and hold Harmless the Owner,Architect.Architect's consultants,agents and employees of any for them and against claims,damages,losses
and expenses including,but not limited to attorneys'fees,arising out of or resulting from performance of the Work.
Revision Date:05.11.2018 Page 1 AE-DES-F-202
•
Ghafari Project Number: 187747 G H FAR I
Document Release 02
Date: 03/08/19
DESCRIPTION OF WORK
In general terms, the work of this package includes Building Permit Documents for the Altar'd State Washington Square
project located in Tigard, Oregon.
® THE DETAILED SCOPE OF WORK IS AS FOLLOWS: Full drawing set for building permit review. Project is an
exterior façade and interior tenant fit-out alteration.
® CHANGES TO THE WORK
CIVIL:
• Sheet#- Revision information
STRUCTURAL:
• AD2.0—Adjusted edge of slab removal dimensions modified.
ARCHITECTURAL:
• Sheet#- Revision information
MECHANICAL:
• Sheet#- Revision information
ELECTRICAL:
• Sheet#- Revision information
END OF DOCUMENT RELEASE 02
INDEMNIFICATION:
The Contractor shall indemnify and hold Harmless the Owner,Architect,Architect's consultants,agents and employees of any for them and against claims,damages,losses
and expenses including,but not limited to attorneys'fees,arising out of or resulting from performance of the Work.
Revision Date:05.11.2018 Page 2 AE-DES-F-202
Ghafari Project Number: 187747 GHAFAR I
Document Release 02
Date: 03/08/19
DISTRIBUTION LIST
Owner: Altar'd State Full.Size.._: Half Size _ Specifications Electronic
❑ ❑ ❑
Client
Ghafari Associates, LLC
Meghan Frederick, Project Manager ❑ ❑ ❑
Other:
❑ ❑ ❑ ❑
INDEMNIFICATION:
The Contractor shall indemnify and hold Harmless the Owner,Architect,Architect's consultants,agents and employees of any for them and against claims,damages,losses
and expenses including,but not limited to attorneys'fees,arising out of or resulting from performance of the Work.
Revision Date:05.11.2018 Page 3 AE-DES-F-202
• Ghafari Project Number: 187747 G H A FA I
Document Release 02
Date: 03/08/19
LIST OF DOCUMENT RELEASES
DATE DOC REL DESCRIPTION
02/27/19 01 IFP - Demolition
03/08/19 02 IFP - Building
INDEMNIFICATION:
The Contractor shall indemnify and hold Harmless the Owner,Architect,Architect's consultants,agents and employees of any for them and against claims,damages,losses
and expenses including,but not limited to attorneys'fees,arising out of or resulting from performance of the Work.
Revision Date:05.11.2018 Page 4 AE-DES-F-202