Specifications (26) GREEN MOUNThIN 1r
structural engineeringiA/vi , ,
NOV 1 4 2018
CITA T �4S'# F
'"'` " til.RG tII 7
BIT �I V ISMO:{;
STRUCTURAL CALCULATIONS
Plan 2885
Elderberry Ridge, Lot 36
Tigard, Oregon
Contractor:
Riverside Homes
P R open
dq 78PE
,, OREGON q
"f,y T �qc1 ��'
°g� ►a •0413141-
[EXPIRES 12. 31 •2,02
Project Number: 17485
November 8, 2018
Index
Structural Information
Lateral Analysis L-1 thru L-15
eh
greenmountainse corn-info@greenmountainse corn-4857 NW Lake Rd.,Suite 260.Camas,WA 98607
•
GREEN MOUNTAIN
1%V. structural engineering
STRUCTURAL DESIGN INFORMATION
GOVERNING CODE: 2015 International Residential Code(IRC)
2015 International Building Code(IBC)
This engineering pertains to the design of the Lateral Force Resisting System and a review of
the home designer's framing and foundation plans. The home designer is responsible for
making any necessary changes as required by these calculations to their framing and
foundation plans.
1. Dead Load:
A. Roof 15 psf
B. Floor 10 psf
C. Exterior walls 10 psf
D. Exterior walls with veneer 50 psf
E. Interior walls with gypboard each side 5 psf
2. Live load:
A. Floor 40 psf
B. Decks&Balconies 60 psf
3. Snow load:
A. Uniformly distributed snow load on roof 25 psf
4. Wind load—based on ASCE 7-10 CH 27 MWFRS Directional Procedure:
A. 3 Second Gust Wind Speed V=126 mph
B. Exposure B
C. Importance factor I=1.0
D. Topographical Factor Kzt=1.0
E. Wind Directional Factor Kd=0.85
F. Structure classified as enclosed
5. Seismic load—based on ASCE 7-10 Section 12.14:
A. Mapped Spectral Acceleration for short periods Ss=1.0
B. Mapped Spectral Acceleration for 1 second period S13.34
C. Soil Site Class D
D. Ductility coefficient .....R=6.5
E. Seismic Design Category D
6. Foundation Soil Properties:
A. Undisturbed sandy silt per IBC 2015 Table 1806.2 Soil Class#5
B. Maximum vertical bearing pressure 1500 psf
7. Retaining wall lateral loads:
A. Walls free to displace laterally at top 40 pcf
B. Walls restrained against lateral displacement at top 45 pcf
8. Concrete:
A. 28 day design strength F'c 3000 psi
B. Reinforcing bars pi ASTM A615,Grade 60
greenmountainse.com- info®greenmountainse.com-4857 NW Lake Rd., Suite 260,Camas,WA 98607
GREEN MOUNTIIIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-1
LATE RAL
SEISMIC DESIGN BASED ON ASCE-7-10
1617.5 Simplified analysis procedure for seismic design of buildings
1.2•SDs
SEISMIC BASE SHEAR V:= •W (EQ.12.14-11 with F=12)
R
SS mapped spectral acceleration for S := 1.00
short periods(Se c.11.4.1) from USGS web site
S, mapped spectral acceleration for := 0.34
1 second period(Sec.11.4.1)
Fa Site coefficient(Table 11.4-1) Fa' 1.1 Based on Soil
F„ Site coefficient(Table 11.4-2)
F := 1.8 Site Class D
SMS:= Fa•Ss SMS= 1.1 (Eq.11.4-1)
SM1:= F„•S1 SM1= 0.61 (E q.11.42)
11.4.43 Design spectrum response acceleration parameters
2
SDS 3 SMS SDs = 0.73 > 0.50g
SEISMIC
2 CATEGORY
SD1•= 3•SM1 SDI = 0.41 > 0.20g D per Table 11.6-1
1.2 SDs WOOD SHEAR PANELS
V W R:= 6.5 Table 9.52.2
R
1.2.0.73
V:= 6.5 W V:= 0.135•W
12.4 Seismic Load Combinations
E:= 1.3•V (Eq.12.4-3 with redundancy factor=13 per 12.3.42)
WSD:= 0.7•E 0.7.1.3.0.135•W 0.123•W WOOD SHEAR PANELS
II
GREEN MOUNTAIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
LATERAL JOB NO: 17485 SHEET: L-2
SIMPLIFIED WIND AND SEISMIC COMPARISON
WIND
4.41
11111 11 - 7.4
psf psf
Wind ease
Shear
Length L:= 52•ft
Height Ht:= 24•ft WIND:= L•Ht.(11•psf + 7.4•psf)
SEISMIC WIND= 22963.2 lb
Fr 3 Wroof
F2 — Wfloor Seismic
Wwal I
ease Shear
Aroof:= 52•ft•40•ft Aroof= 2080ft2
Afloor:= 43 ft 40 ft Afloor= 1720 ft2
Wwalls := 4.52•ft•20•ft Wwalls = 4160 ft2
SEISMIC:_ (Aroof'15•psf+ Afloor.15.psf+ Wwalls•10•psf)•0.123 SEISMIC= 12127.8 lb
WIND GOVERNS DESIGN
11
GREEN MOUNTnIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM IIIP
JOB NO: 17485 SHEET: L-3
LATE RAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE
VELOCITY PRESSURE qz:= .00256.KZ•Krt•Kd•V2•I (Eq.6-15)
EXPOSURE 5
WIND SPEED(3 second gust) Vas:= 126 mph
IMPORTANCE FACTOR I := 1.0
TOPOGRAPHICAL FACTOR Kn:= 1.0
WIND DIRECTIONAL FACTOR Kd:= 0.85
(Table 6-4)
EXPOSURE COEFFICIENT 0'-15' := 0.57 q,:= .00256•KZ•Krt•Kd•V3,2•I qz= 19.69
KZ
(varies/height)
15-20' K,:= 0.62 qz:= .00256•KZ•Krt•Kd•V3,2.1 qz= 21.42
20'-25' K,:= 0.66 qz:= .00256•KZ•Krt•Kd•V3s2•I qZ= 22.8
25-30' KZ:= 0.70 qz:= .00256•KZ•KZt•Kd•V3,2•I qZ= 24.18
11
GREEN MOUNTMIIN PROJECT: Riverside - 2885
VP structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-4
LATE RAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
WIND PRESSURE P:= 9Z•G•Cp G:= 0.85 Gust factor
CP pressure coefficient
AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1
0'-15' WINDWARD PW:= 12.4•psf•0.85.0.8 PW= 8.43 psf
LEEWARD Pi.:= 12.4•psf•0.85.0.5 PL = 5.27 psf
16-20' WINDWARD PW:= 13.49•psf•0.85.0.8 P,v= 9.17 psf
LEEWARD PL := 13.49•psf•0.85.0.5 PL = 5.73 psf
20'-25' WINDWARD PW:= 14.36•psf•0.85.0.8 PW= 9.76psf
LEEWARD PL:= 14.36-psf•0.85.0.5 PL = 6.1 psf
AT ROOF
0'-15' WINDWARD PW:= 12.4•psf•0.85.0.3 Pw= 3.16 psf
LEEWARD PL:= 12.4•psf•0.85.0.6 PL= 6.32 psf
16-20'
WINDWARD PW:= 13.49•psf•0.85.0.3 P,,= 3.44 psf
LEEWARD PL:= 13.49•psf•0.85.0.6 PL = 6.88 psf
20'-25' WINDWARD PW:= 14.36.psf•0.85.0.3 PW= 3.66 psf
LEEWARD PL:= 14.36•psf•0.85.0.6 PL = 7.32 psf
26-30' WINDWARD PW:= 15.23•psf•0.85.0.3 PW= 3.88 psf
LEEWARD PL:= 15.23•psf•0.85.0.6 PL= 7.77 psf
11
GREEN MOUNTAIN PROJECT: Riverside - 2885
411101P structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-5
LATE RAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
;sf
.44
6.88 Assume
Cp-0.5 psf
8 := 35
441044,
9.17
POIII
6.1
PO
Mean Roof Height
18+ 22
= 20
2
Loads at Roof roof-ave
Windward 3.44•psf-5.5-ft= 18.92 plf
Leeward 6.88•psf•5.5•ft= 37.84 plf
Wall loads at upper level at main level
Windward 8.43psf•4.ft= 33.72pIf 8.43•psf.8.5.ft= 71.66 p If
Leeward 5.73.psf•4-ft= 22.92pIf 5.73•psf•8.5•ft= 48.71 plf
el
•
Nvtvw-7 1, vs Roof A U6 )
4- , n L-6
�.__._. ._._4. j
I II
II
• I I
...3 Ln ti
PRE. MFG. ES 0 24" O.C.
0 ❑ AlI. ♦ 1r�•r• l ll*AAA`, —GIRD ♦llllllliil Y
i ►l�►►i►ii�►ii��66,1r.,0"®'iii ml►i'_®_ „i►iiir�'iiiiiiiiiii
n +++i�►l4;iil�!i iiiils,'. i liliiiiii0
4ii.46iii• ..."
ii+l�iijCi•l�♦♦i+l►iiiiililiiiiiliiiiiiii♦iil♦ii
o iiiii '++ V
-+t° i� 00/4�i! '10► ii, _ _' " � i• ic ' _ 1\
--
— e iit•i!�►fi+ ► er iiQGl® ,
__I� Fr ♦+ i ,l !+ + .�
u.
.l �!.i.►. .'
1 GIn
1 ❑ RIDGE
i..41.A\
prroviili .
i iii` iii•.
Igi '+► ��414k-vr. ® —
,l7► 0►lA + .l� + l► htl�►l♦+il +► i.+ I 4' " ll.ii ►l4►liUi �'♦illi.ii..10 0 ►.....ilii►l + lllllill♦ U.
,
lillllllllil�►lii1�►1!i• '�i��ilililiiilililiil+i�li�, —
lillil,.►.1.1+►41i1r�ll♦ill�l♦l♦♦'1'11.li�'ii�',1 !.,►ijljljl�:®I� iii1 �.`ri l0ll..&.0.4►ii���i�i♦i-sil l lii4iI�illliill. s ❑ _ _
,i JIL -,
ip4,,,,,Arms ; ..... , ....1„:
: 14"•
+,, � - ...S O 24" O. .
4 W 1'-6` RNSEO
•- ( AT PORCH
I®i RZ V
ROOF GUEST"BDRMT) AT
JACKS I w— W
FG.
O 24" O.C. '/'J{ ® 00' ®
PRE. MW/ 1•-6" RAISED r'�7y RI
TRUSSES HEEL
O 24' O.C.
F
,0 1'-6" RAISED 1:1 I E6" i
C
ktu' 1,0/15e.,
''- 'i..
L-7
16
."51 hent'
A-
/ r r-1 / 4 El 1r .,r44----""
. ""',III' 'S -i- 0
I I III
I I I
I 1 II
I 1 NASTLR r III
DAM
T XI;
k_Ca,
111 MASTER
1-8)
BEDROOM
BE TWO M uN
!il 0cIii N/ gi v
II ul ` 1
-S - -=ElffiliffigaiiiiiiiMi
Li I
rn
(^� [1.---_,
r11-',LAUNORY
{t 11 I 1 J�1 C E
1r- 14 I r/ o z
J j
�/
P4'S -- 2 '�- Y 11` P6eS
I I z 0 tiiL
I I Q 1
F /
//( Pegs V
• LOFT
O p 0 7
BEDROOM BEDROOM
THREE FOUR F11 2
® r--.-+
11111111.116 1.4,41044
bra w
1 ///
I 1 s , v w till
(2 f5Y5
6046 X0 SLUR. 6046 XO SLOR. 20.30 6030 PIC.
(EGRESS) (EGRESS) - -
to tv ,1044
IA atil
41)
7
U1/1 I I
,il I ;I .�9)gb2, —.
e), rr 1 N30il
iis, _f7"---—I I . 1 -1
..\--_ _ ___, ....__ _ * ..1.
:±II
a3Ao. 0
111 II
71M li
3VvavD
___
IV120 10
Qo b
i 01 cil
I I I C ��
11111 I .r — , n
11111 �� � � u
fl
N3H011H I1
SN i
�I 1 n h'130 j j,J1l Ii1
'I
nvidm. I
ft I I 1111
II t 301.1dO
ml 13>q0.1Woo2i 1.1.--==_
r J 1 ri...
1%13210woos
_ JNtNlO
T
LL
Cell Q)2? OttWd
9-111 ,3
nr tl
'V Wel aVil
GREEN MOUNTPIIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-9
LATE RAL
SHEAR WALL DESIGN
Pdl f dl
Wdl
I p ( P:= wind
V:= seismic
h
R=Holdown
Force
Based on 2012 IBC Basic Load Combinations 1605.3.1
0.6D+ W (Equation 16-11)
0.6•D+ 0.7•E (Equation 16-12)
Overturning Moment: Mot:= P•h
L2
Resisting Moment: Mr:= 0.6•(Wdi + Wwaii)•2 + 0.6 Pdi•L
Mot- Mr
Holdown Force R
L
11
GREEN MOUNThIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-10
LATE RAL
Left Elevation Exterior Walls
Second Level
Wind Force P:= 2260•lb P= 22601b
Length of wall L:= 5•ft+ 4•ft+ 19-ft L= 28ft
P
Shear v:= — v= 80.71p If A
5
Overturning Mot:= P•8•ft•28 Mot= 3228.57lb•ft
Moment
(5•ft)2
Resisting Mr:= 0.6•(15•psf•2•ft+ 10.psf•8•ft)• 2 + 0.6.600•Ib•5•ft
Moment
Mr= 2625lb•ft
Mot— Mr
Holdown = 120.71 lb
Force 5ft
Main Level
Wind Force P:= 4660-lb P= 46601b
Length of wall L:= 14•ft+ 10•ft+ 8•ft L= 32ft
P
Shear v:= — v= 145.63pIf 5
8
Overturning Mot:= P•9•ft•— Mot= 10485lb•ft
Moment 32
(8•ft)2
Resisting Mr:= 0.6 (15 psf-2-ft+ 10 psf•17 ft)• 2 + 0.6.800•lb•8•ft
Moment
Mr= 7680lb•ft
Mot— Mr
Holdown = 350.63 lb
8ft
Force
II
GREEN MOUNTMIIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-11
LATERAL
Front Elevation Exterior Walls
Second Level
Wind Force P:= 2373.1b P= 23731b
Length of wall L:= 3.5•ft+ 3•ft+ 3.5•ft+ 3.5•ft L= 13.5ft
P
Shear v:= L v= 175.78pIf S
35
Overturning Mot:= P•8•ft•— Mot= 4921.78lb•ft
Moment 13.5
(3.5•ft)2
Resisting Mr:= 0.6 (15•psf•4•ft+ 10.psf•8•ft)• 2 + 0.6.600•Ib•3.5•ft
Moment
Mr= 1774.5 lb•ft
Mot- Mr
Holdown = 899.22 lb
Force 3'S•ft MSTC4853
Main Level
Wind Force P:= 2988•1b P= 2988 lb
Length of wall L:= 2.25•ft+ 2.25•ft+ 1.5•ft+ 1.5•ft L= 7.5ft
2.25.3.5 = 7.88
P
Shear Wind v:= L v= 398.4pIf D
2.25
Overturning Mot:= P•7.88•ft•— Mot= 7063.63lb•ft
Moment 7.5
(2.25•ft)2
Resisting Mr:= 0.6•(15•psf•4•ft+ 10.psf 43•ft)• 2 + 0.6.800•Ib•2.25•ft
Moment
M
Holdown of Mr - 2564.89 lb
Mr= 1292.63Ib•ft
Force 2.25.ft
HTTS
II
•
GREEN MOUNTVIIN PROJECT: Riverside - 2885
%OF structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-12
LATE RAL
Right Elevation Exterior Walls
Second Level
Wind Force P:= 2260•lb P= 2260 lb
Length of wall L:= 8. t+ 5•ft+ 4-ft L= 17ft
P
Shear v:= — v= 132.94pIf A
4
Overturning Mot:= P•8-ft•— Mot= 4254.121b•ft
Moment 17
(4•ft)2
Resisting Mr:= 0.6.(15•psf•2•ft+ 10•psf•8•ft)• 2 + 0.6.600•Ib•4.ft
Moment
Mr= 1968 lb•ft
Mot- Mr
Holdown = 571.53 lb
Force Oft
Main Level
Wind Force P:= 4660•lb P=46601b
Length of wall L:= 15•ft+ 8•ft+ 3•ft L= 26ft
P
Shear v:= — v= 179.23p1f
8
Overturning Mot:= P•9•ft•26 Mot= 12904.62lb•ft
Moment
(8.ft)2
Resisting Mr:= 0.6•(15.psf•2•ft+ 10.psf.17•ft)• 2 + 0.6.800•Ib•8-ft
Moment
Mr= 7680lb•{t
Mot- Mr
Holdown = 653.08 lb
Oft
Force
11
GREEN MOUNTAIN PROJECT: Riverside - 2885
gip structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-13
LATERAL
Rear Elevation Exterior Walls
Second Level
Wind Force P:= 2373.1b P= 23731b
Length of wall L:= 7.5.ft+ 11•ft+ 4•ft L= 22.5ft
P
Shear v:= — v= 105.47p1f A
7.5
Overturning Mot:= P•8•ft•— Mot= 6328lb•ft
Moment 22'5
(7.5•ft)2
Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf•12•ft)• 2 + 0.6.600•lb•7.5•ft
Moment
Mr= 5231.25lb•ft
Mot- Mr
Holdown = 146.23 lb
Force 7.5ft
Main Level
Wind Force P:= 3813.1b P= 38131b
Length of wall L:= 6•ft+ 7•ft+4•ft L= 17ft
P
Shear Wind v:= — v= 224.29pIf B
4
Overturning Mot:= P•9•ft•17 Mot= 8074.59lb-ft
Moment
(4.ft)2
Resisting M�:= 0.6•(15•psf-4-ft+ 10•psf•8•ft)• 2 + 0.6.800•Ib•4•ft
Moment
Holdown Mot- Mr = 1370.65 lb
Mr = 2592lb•ft
Force Oft
HITS
GREEN MOUNTS IN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-1 4
LATERAL
Interior Shear Walls at back of Garage
Main Level
Wind Force P:= 4069•lb P=4069 lb
Length of wall L:= 18•ft L= 18ft
P
Shear Wind v:= — v= 226.06pIf B
Overturning Mat:= P•9•ft M°t= 36621lb.ft
Moment
(18•ft)2
Resisting M�:= 0.6.(10•psf•12.ft+ 10•psf•9•ft)• 2 + 0.6.1200•Ib•18•ft
Moment
MOt- Mr Mr= 33372 lb•ft
Holdown = 180.5lb
Force 18•ft
11
GREEN MOUNTnIN PROJECT: Riverside - 2885
411, structural engineering DATE: 12/4/2017 BY: CM
LATERAL JOB NO: 17485 SHEET: L-15
WIND ON PORCH ROOF
126 MPH,EXP B w:= 6•ft•(4.43•psf + 8.86•psf) w= 79.7 plf
// D
J
II
II
w .
Ii II
II L
liii- 7.---""%sj cj.
II
III II
il
1 UN iiiiiiimmm
DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10•ft D:= 11-ft
w•L2
M:= 2 M= 3987 lbft
support beam on post in wall at house with
M Simpson HUCQ-SDS
C:= — T:= C C= 398.7 lb
L 12 SDS 1/4x2 1/4 screws(min)x172 lbs=2064
in combined withdraw
w•L Nail top and bottom chord of first truss to wall with
v D v= 72.49 plf (2)16d nails at 16"o.c.(web to studs)
ft