LB2003_79 TOTAL SOU . C= LOAD SUM \AAY
LOAD DESCRIPTION UNITS CONNECTED DEMAND DESIGN
TYPE LOAD LOAD LOAD
Copiers KW 3.1 3.1 3.1
KVAR 2.3 2.3 2.3
KVA 3.9 5.9 3.9
EEquipment KW 1.2 1.2 1.2
KVAR 0.9 0.9 0.9
KVA 1.4 1.4 1.4
FAULT ANALYSIS SU V NARY
ELighting KW 10.7 10.7 13.4
BUS NAME VOLTAGE AVAILABLE FAULT CURRENT KVAR 3.5 3.5 4.4
L-L 3 PHASE LINE/GRND KVA 11.3 11.3 14.1
AHU-1 BUS 480. 14559.8 12383.41 EReceptacles KW 3.4 3.4 3.4
AHU-2 BUS 480. 14968.5 12731.41 KVAR 2.1 2.1 2.1
AHU-3 BUS 480. 8410.4 6076.80 KVA 4.0 4.0 4.0
ATS EM 480. 199.0 198.07 HVAC Systems KW 276.7 276.7 276.7
ATS LOAD 480. 17533.3 15363.17 Y KVAR 207.5 207.57.
20 5
SYMBOL EQUIPMENT DESCRIPTION ELECTRICAL CHARACTERISTICS 1-POINT STARTER DISCONNECT POWER SOURCE ATS NORM 480. 17533.3 15363.17 KVA 345.8 345.8 345.8
HP KW MOCP MCA VOLTS/PH CONNECT BY DIV 15 OR 16 BY DIV 15 OR 16 COMMENTS CC BUS 480. 8838.8 6479.77
EL BUS 480. 14910.1 11563.34 Kitchen Eqp KW 0.2 0.1 0.1
PLUMBING ELEV 1 BUS 480. 4395.4 2665.58 KVAR 0.1 0.1 0.1
ELEV 2 480. 13541.3 10232.88 KVA 0.2 0.1 0.1
EWH-1 ELECTRIC WATER HEATER 9 277/1 YES N/A N/A L1
EWH-2 ELECTRIC WATER HEATER 4.5 277/1 YES N/A WA CC EP BUS 208. 1386.2 1385.01 NEquipment KW 10.4 10.4 10.4
EWH-3 ELECTRIC WATER HEATER 10 277/1 YES N/A N/A L1 GEN BUS 480. 200.2 200.22 KVAR 7.8 7.8 7.8
EWH-4 ELECTRIC WATER HEATER 9 27 /1 YES N/A N/A L1 L1 BUS 480. 14119.5 11845.36 KVA 13.0 13.0 13.0
RHWP-1 RECIRC. HOT WATER PUMP 1/25 120/1 16 16 P1A L2 BUS 480. 19646.3 19201.54
MCC-A BUS 480. 18923.6 18163.11 NLighting KW 65.1 65.1 81.3
KVAR 21.4 21.4 26.7
SP-1 SUMP PUMP 1/2 120/1 15 16 EP KVA 68.5 68.5 85.6
SP-2 SUMP PUMP 1/2 120/1 15 16 EP MDP-A BUS 480. 20271.9 20141.24
MDP-B BUS 480. 19725.6 19318.44
MECHANICAL P1A BUS 208. 3305.2 3377.16 NReceptacles KW 70.0 39.2 39.2
P1BA BUS 208. 2691.1 2922.40 KVAR 43.4 24.3 24.3
AHU-1 MODULAR AIR HANDLING UNIT 225 189.1 480/3 YES 15 VFD 15 VFD MCC-A P1 BB BUS 208. 2656.9 2856.36 KVA 82.3 46.2 46.2
AHU-2 MODULAR AIR HANDLING UNIT 175 143.75 480/3 YES 15 VFD 15 VFD MCC-A
AHU-3 MODULAR AIR HANDLING UNIT 100 84.4 480/3 YES 15 VFD 15 VFD CC P1 C BUS 208. 4582.7 4934.77 Water Heater KW 32.5 32.5 32.5
EF-1 P2A BUS 208. 3430.4 3472.49 KVAR 6.6 6.6 6.6
EXHAUST FAN 1/2 480/3 16 16 MCC-A P2B BUS 208. 3384.3 3395.59 KVA 33.2 33.2 33.2
EF-2 EXHAUST FAN .217 120/1 16 16 P1BA PCR BUS 208. 1749.0 1777.1 fi
EF-3 EXHAUST FAN 1/4 120/1 16 16 PCR KVA TYPE MTR KW 20.5 20.5 20.5
EF-4 EXHAUST FAN 1/4 120/1 16 16 P1BA XFMR EP PRI 480. 12060.5 8467.73
EF-5 EXHAUST FAN 1/4 120/1 16 16 P2A KVAR 15.4 15.4 15.4
EF-6 EXHAUST FAN .048 120/1 16 16 P1 BA XFMR EP SEC 208. 1421.7 1446.37 KVA 25.6 25.6 25.6
EF-7 EXHAUST FAN 1/6 120/1 16 16 P2A XFMR P1A PRI 480. 13494.9 11008.97
XFMR P1A SEC 208, 3357.4 3468.36 LARGEST KVA MTR KW 18.6 18.6 23.3
HWP-1 HEATING WATER PUMP 1 480/3 16 16 MCC-A XFMR P1BA PRI 480. 4375.8 2680.53 KVAR 14.0 14.0 17.5
HWP-2 HEATING WATER PUMP 3/4 480/3 16 16 MCC-A XFMR P1 BA SEC 208. 2726.1 2991.54 KVA 23,3 23.3 29,1
HWP-3 HEA:ING WATER PUMP 3 480/3 15 (VFD) 15 (VFD) MCC-A
HWP-4 HEA ING WATER PUMP 3 480/3 15 (VFD) 15 (VFD) MCC-A XFMR P1 C PF 480. 7452.4 4943.41
B-1 BOILER 4 120/1- YES N/A N/A-- P1A CONTROL POWER ONLY XFMR P 1 C SEC 208. 4716.1 5190.46 TOTAL LOADS KW 512.3 481.5 505.1
B-2 BOILER 4 120 1 YES N A N A P1A CONTROL POWER ONLY
XFMR P2A PR1 480. 18816.7 17815.29 A 324.9 305.8 315.6
XFMR P2A SEC 208. 3477.7 3552.92 KVA 606.6 570.4 595.6
CUH-1 CABINET UNIT HEATER 0 12011 YES N/A N/A P1A XFMR PCR PI 480. 8164.9 5792.91
CUH-2 CABINET UNIT HEATER 0 12071 YES N/A N/A P1A
XFMR PCR SEC 208. 1781.4 1834.78
1 MECHANICAL EQUIPMENT SCHEDULE 2 BUILDING FAULT SUMMARY 3
BUILDING LOAD SUMMARY
E7.4 SCALE: NONE
E7.4 SCALE: NONE E7,4 SCALE: NONE
C7:7
0
0
0
0
v
L
U)
N
0 Li-
tr)
CJU)OW
N
pc,
c70
W
›.
X xi
C
i.,‹
01
N
F9 COO
Na
-F, Revisions' o Date Drawing Title
c1/21/04 RECORD DRAWINGS 19 May 2003
W C) EQUIPMENT SCHEDULES
S R G PARTNERSHIP 1 N C • RECORD DRAWING Projec
t oo ELECTRICAL
NeveTiaard
N NOTE: ���have boon corr�ted�per data
808 S.W. 3rd Avenue
s� supplied }�.,� / Consultant Project No
on
Order Draw .Ttey do not rresrt shCJM!all Portl 97204-2426
7�2
. N ARCHITECTURE PLANNING INTERIORS ' ` expng and oayy not bm Ga R 503.228.2921 Construction Documents Drawing No
\ v o u s.Mold verify Ming/hidden PAE Consulting Engineers Inc. FAX 503.226.2930 Drawn by
o v 621 SW Morrison Street,Suite 200 Portland,Oregon 97205III LI to
of" "",ark TCN
o Z D'4` Checked by
Tigard, Oregon DMB E7 . 4
D, T:503.222.1917 F:503.294.0272 www.srgpartnership.com
o
*s
E
Q7 L