Loading...
LB2003_51 STUD WALL - SEE WALL TYPES CMU WALL ASSEMBLY - SEE METAL STUD WALL FRAMING @ 1G" O.C. WALL TYPES CMU WALL ASSEMBLY - -‘41Pir 1 /-// /// //, BOND BEAM HEADER (REFER TO / -- \ STRUCT.) / I METAL STUD SOFFIT FRAMING EXT. BRICK VENEER WALL // EXT. BRICK VENEER WALL @ 16" O.C. W/ BATT INSULATION Q I ASSEMBLY. �` / ASSEMBLY. a / � / / / STL. SHELF ANGLE, FINISH TO / I \.// \ GALVANIZED STL. SHELF ANGLE, ---- MATCH MTh. PANEL WHERE FINISH TO MATCH MTL. PANEL \ EXPOSED, TYP. I WHERE EXPOSED, TYP. )i... _ / MEMBRANE FLASHING /1:.. MEMBRANE FLASHING a % _ WEEPS @ 36" O.C., TYP./ ____ /( WEEPS © 36 O.C., TYP.// // ,/ / / '� BOTTOM OF BRICK i i /; // �\ BOTTOM OF BRICK i a �t X ( • +10-3 1/2 h( X c ,,. +10'-3 1/2 o Q w a o o a SOFFIT - • _:;,- -\ +9'-6' BACKER ROD/SEALANT, TYP. -`C - I BACKER ROD/SEALANT, TYP. EXT. GYP. SHEATHING © SOFFIT > _ ti t BUILT UP STUD HEADER TO SPAN PAINTED STICK-PIN ASSEMBLY W/ BATT (,- \ :i/7 OPENING. T6 \ \\\\\\\\\\\\\\\ WATERPROOF MEMBRANE CONT. SEALANT JOINT INSULr. . AND VAPOR BARRIER. - il \\\ap v\\\\ �' % FORMED ALUM. PANEL W/ FINISH FORMED ALUM. PANEL W/ FINISH �\ *1/2'' BRICK VENEER BRICK VENEER - BEYOND I ( TO MATCH CURTAIN WALL SYSTEM. ,/� TO MATCH CURTAIN WALL SYSTEM. � CUT BRICK AS REQ'D PREFINISHED METAL PANEL SYSTEM - 1( \ L - - ALUM. BREAK METAL TRIM C t 6" MTL. STUD SOFFIT FRAMING W/ ;, it „ \<<,\ i 7 6 MTL. STUD SOFFIT FRAMING W/ JAMBS, METAL PANEL OVER BUILDING WRAP OVER GYP. SHEATHING BATT INSUL. �� BATT INSUL. " OVER METAL STUDS W/ BATT INSULATION " BOTTOM OF MTL. PANEL SYSTEM @ HEAD BOTTOM OF MTL. PANEL i �` +9'-6 1/2 1'-3g" ---..„,,,,,..... 1 +9'-6" EXTERIOR GYP. BD. SOFFIT. EXTERIOR GYP. BD. SOFFIT. HLW. MTL. FRAME AND DOOF 1" 11" 2" PROVIDE TAPING BEAD @ ALL 1" 11" 2" PROVIDE TAPING BEAD © ALL CL ASSEMBLY ' EDGES. FINISH TO MATCH P-3 2 // 4f 4r EDGES. FINISH TO MATCH P-3 0 - - TYP. -T - - TYP. - - 17 SOF': T 3 :TAL © 3 . 2 c \i. ---TAL � A \ -1� - AD @ XTER OR 9 AL � A\ =� - -A � XTR OR o - W T�. DOOR JAS B D -TA1L -10 A8.8 SCALE: 3" = 1T0" .8 SCALE: 3" = 1'-0" A8.8 SCALE: 3" = 1'-0" A8.8 SCALE: 1-1/2" = 1'-0" INTERIOR STUD WALL STEEL COLUMN BEYOND, FRAMING - SEE WALL PAINT. TYPES VERTICAL MULL. STOPS HLW. MTL. FRAME AND DOOF AT DOOR HEADER AT • aASSEMBLY X.5/X.F ONLY. /// ALUM. BREAK METAL TRIM C 1" INSULATED GLASS CONTINUOUS L5X5 SHELF ANGLE. JAMBS, M TAL PANEL / n % SYTEM HEAD GLAZING ASSEMBLY I BRICK VENEER SHOWN BEYOND. \ FINISH TO MATH MTI PANFI a BA KER OD/SEALANT GLAZING ADAPTOR \ a WHERE EXPOSED, TYP. Q // / \ ,7 CUT BRI K AS REVD -, T.O. ALUM. SUSPENDED GYP. BD. CEILING / Lon I �� / L i SEE SECTIONS -� \ 4 Ai ERIC VENEER ASSEMBLY - - 1 r / CONTINUOUS L5X5 SHELF ANGLE / 1/2" SHAPE �/// \ ter- 1 F.O.B. U0 Co C , i WELDED TO STUD FRAME. FINISH A8.8 r TO MATCH MTL. PANEL WHERE d EXPOSED TYP. V HVAC PLENUM, REFER TO ' \ \\ \ MECHANICAL DWGS. 6 X 6 SHARP CORNER E • EXTRUDED ALUM. TUBE W/ 43 - �/ ,�/ ��� ;�, BOTTOM OF BRICK � - � � - -] V � �:,�° L_____ � FINISH TO MATCH CURTAIN =-�� +10'-0 1 2" '"" Q o T T C r / % / 1 r z WALL. > ! 1 \7377...-._ 11111 CONCEALED CLOSER AND I I - a a Ico OR CONCEALED ELECTRIC/ - FORMED MTL ANCHORES Cc? 24" Rico HSS TUBE STEEL SUPPORT FOR a -L::: HVAC DIFFUSER, REFER TO _SLIDING POCKET DOOR TRACK i MECHANICAL DWGS. J aFINRTATIINOGR � '- AUTO DOOR OPERATOR. O.C. MAX. FASTEN TO BUILT UP ;_ / // !,�I SEE DOOR SCHEDULE. 1 _ _ STUD HEADER. ASSEMBLY. HSS SPANS OPENING I 1 \ \ X.1 � N AND IS ANCHORED TO CMU WALL 1 //// APPLIED ALUM. DOOR STOP ,� / �, F.O.M. I CO EACH SIDE. FACE OF HSS TO <> i/ / I TO MATCH CURTAIN WALL �, FORMED ALUM. PANEL FASCIA t- BOTTOM OF, BRICK BE FLUSH W/ CMU WALL. +9 3 1/2 \ \ \ \N\s\ \ \\ 6" X 4" SHARP CORNER AND SOFFIT W/ FINISH TO MATCH -- � STL. TUBE BRACKETED CURTAIN WALL SYSTEM. - L3X3 STL. ANGLE SUPPORT TO STL. COL. AND DOOR \ I IA N BOTTOM OF MTL. PANEL SUSPENDED GYP. BD. CEILING W/ ( I SPANNING OPENING AND 1'-3i" 2'-10/1" NI HEADER AT X.S. (PAINT). ,� -'� +97_577 CONTINUOUS TAPING BEAD AT I I I ANCHORED TO CMU WALL AT NOT REQ'D @ SIM. EDGE. EACH END. TO GRID CL 6-->\ CMU WALL ASSEMBLY - 1'-1 i" 2„ GYP. BD. WALL BEYOND. X.0 . SEE WALL TYPES OFFSET PIVOT �` FORMED ALUM. PANEL FASCIA WATERPROOF MEMBRANE STOREFRONT DOOR !-- AND SOFFIT W/ FINISH TO MATCH ir 18 DOOR - -AD -R © CRIA \ WALL 14R VIAL 'DA\ -L - -- AD @ LOBBY 1 O // CURTAIN WALL SYSTEM. 2 EXT__RIOR BR C < C0R \ R- DTA - - D . 2/X. 1 A8.8 SCALE: 3" = 1'-0" A8.8 SCALE: 3" = 1'-0" .N \ / -7-1 BRICK VENEER SHOWN BEYOND. A8.8 SCALE: 1-1/2" = 1 T 0- -IF \ / CD / / .... A ik i I \ 0.9 N l - 13 A9.2 STEEL COLUMN BEYOND _ BRICK VENEER SHOWN BEYOND. • �g N NTTO2y OF MTL. PANEL � SPWSW: ••• �"SGMYP. SHEATHING GLAZING ABOVE WINDOW SYSTEM, REFER TO - �� ♦ �► ��� / INTERIOR ELEVATIONS. GYP. BD. POCKET SI-TOWN BEYOND. ` -L,-1P-OIL11- ROOF DECK VARIES 4, 6" X 4" SHARP CORNER L3X3 STL. ANGLE SUPPORT SLIDING DOOR TRACK @HEAD. \ 4. SEE ROOF PLAN STL. TUBE BRACKETED40 SPANNING OPENING AND „ 16-441. ANCHORED TO CMU WALL AT / 4 1 -1 2 11.._Z_., -r._____11 l ' DEFLECTION HEAD TO STL. COL. AND EACH END. ` I DOOR HEADER AT X.S. BRICK VENEER (PAINT) TOP OF MULLION GYP. BD. r ° +10'-3" SLIDING WOOD DOOR, REFER TO , PAINT P2 ,. �, VERTICAL MULLION FORMED MTL ANCHORES @ 24" DOOR SCHEDULE } ABOVE. rI O.C. MAX. FASTEN TO BOTTOM n v v - / OF WINDOW MULLION. , - - - -, - - \/ / -110 u 10 V -TAS .DAV=L - - k, © V- SJ1B , L- 107 BRICK- -:; - • <- BUILT UP STUD HEADER TO SPAN OPENING. " T.O. B IC VARIES jk U BRACKET WELEDED _--I A8.8 SCALE: 3" = 1 -0 _� 4110 �� _ SEE 2-A5.4 TO COL. �� U BRACKET MECHANICALLY SUSPENDED GYP. BD. CEILING W/ a FASTENED TO ALUM. TUBE CONTINUOUS TAPING BEAD AT ///// ./�� \\ EXPOSED STEEL COLUMN I EDGE. (� BEYOND, PAINT CONTINUOUS L5X5 SHELF ANGLE. � \ FORMED ALUM. PANEL FASCIA a a �` FINISH TO MATCH MTL. PANEL , AND SOFFIT W/ FINISH TO MATCH WHERE EXPOSED, TYP. HORIZ. MULL BEYOND l l1 In CURTAIN WALL SYSTEM. a \ \ • / \ BOTTOM OF MTL. PANEL �� BOT. OF GYP. BD.3 +9 -5 / \ • " GYP. BD. WALL BEYOND. a HVAC PLENUM, REFER TO 2 V-14 \ MECHANICAL DWGS. moi_ 19 DOOR - _ADR A\ C - 0R TO COL. @ X F X. 5 15 V1 =TAL DA\ -L - - AD CLJRTAI \ WALL -\ TRY / 3 GYD . BD AT TOD 0 - BRIC < LOBBY 3" 7 71 � 7T 7T � " S! A8.8 SCALE: = 1 -0 A8.8 SCALE: 3 = 11-0 a A8.8 SCALE: 1-1/2 = l'-0 L3X3 STL. ANGLE SUPPORT - --- ' HVAC DIFFUSER, REFER TO SPANNING OPENING AND / \ MECHANICAL DWGS. SLIDING DOOR TRACK ANCHORED TO CMU WALL AT SLIDING DOOR TRACK ASSEMBLY ABOVE EACH END. .// MTh. STUD FRAMING W/ /// ASSEMBLY ABOVE �' ,>i / // / /) 4 BOTTOM OF BRICK GWB SHEATH'G SLIDING DOOR - +10'-6 1/2" SLIDING DOOR - SEE DOOR SCHEDULE = BRICK VENEER WALL SEE DOOR SCHEDULE DOOR SHOWN IN FULLY SUSPENDED GYP. BD. CEILING W/ L3X3 STL. ANGLE SUPPORT( F. SPANNING OPENING AND ASSEMBLY ''�,,, OPEN POSITION CONTINUOUS TAPING BEAD AT I = ANCHORED TO CMU WALL AT TUBE STEEL COLUMN - a EDGE. I = EACH END. SEE STRUCTURAL I t 10B I ' I ( FORMED ALUM. PANEL FASCIA As.2 I,- A8.2 _, ;'� I /1 I = AND SOFFIT W FINISH TO MATCH l, // / ,i , mr�/ 1. IN a t - v CURTAIN WALL SYSTEM. SIM DIM. PQINT SHAPE B1 -7---00 En �� ; �-,, �" BRICK VENEER SHOWN BEYOND. \� /� � 11'y, �I /7' / Ticu u ,,,, ,, SHAPE B /_. k ' , . . . / , /7 / '9 .ii , Yr ....1- )N. , ...,_. 1/ / i ' ___. ......_ • A / a a a a LI J :: // 0 ■ 4 4,/____ 1 „,„,...a, a 4 , 4 a ..... / \ N� z 10 4/ 4 V , allilliftlift AN I 1 -- t.'n _ \ Q /, 7 A9.10 i � / L . . \ao �. , , � , //'' ♦ •� .= .,� BOTTOM O F MTL. PANEL i A /, // t/ i \ /1 >/ / GYP. BD. WALL SHOWN BEYOND. i tI ' _1 , ( 7---/A //// "l V-14" 2 z '� o,aj SHAPE B1 SHAPE A (SHAPE B BELOW) / ,� o 1181 -8 m PLAN DIM (SHAPE B BELO ) SHAPE B PLAN DIM. ': \47 '`� P:" 20 SHAPE A SHAPE B1 �� .1.o- et:, '� SAE � 10A 10A ›' A8.5g:/ BRICK VENEER ABOVE A8.2 8 A8.2 ).< - - - SIM. 1/8 20 9OC < =T DOOR @ BRIC < , LOBB " 16 DOCK -T DOOR @ BRCS BOBBY 12 v -TAI � A\ -1 - - -AD =STIBL _ 108 4 BIC < COR \ -R DSA\ DITA L @ GSD 1 A8.8 SCALE: 1-1/2" = 1'-O" A8.8 SCALE: 1-1/2" = i'-0" A8.8 SCALE: 3" = 1'-0" A8.8 SCALE: 1- = 1'-0" I-r IRevisions Date Drawing Title N 25 November 2003 MISC. 80 SID Or project No DETAILS S R G PARTNERSHIP INC ��, 2216 liZill a4NewTigard Consultant Project No JON R. SCHLEUNING t' xxxx N ARCHITECTURE PLANNING INTERIORS Construction Documents Drawing No Drawn by Etna) ECW 621 SW Morrison Street,Suite 200 Portland,Oregon 97205 Tigard,Oregon �1 PORTLAND, OREGON i., .., , Checked by � T:503.222.1917 F: 503.294.0272 www.srgpartnership.com l� TCE A8 • 8 ._ 1OF Ot v