Loading...
LB2003_60 GITVHAL \ OTIS: 1. FOR INTERIOR ELEVATIONS SEE DWGS. A5.X - A5.X. 2. FOR MILLWORK DETAILS SEE DWG. A9.8. .- :.. CHERRY VENEERED PANEL. U.O.N. ...*,.., SEE ELEVATION A5.03 FOR VERTICAL REVEALS / MIRROR CEILING AFF ....:••• MITER & CONT. WELD SEE CLG. PLAN .. . ._ ,,. . PLAM. COUNTER, NOSING PLAM SCHEDULE 5i" & BACKSPLASH 1'-3" U.O.N. PLAM ROOM NOS. -/ .".• / / PL-1 102, 119, 130, 147, 148, •.•'1... SOLID HARDWOOD A9.9 / 215, 217 ... ... • e 1 . ,. WD-1 4.- GYP. BD. SOFFIT, SCRIBE- -x. PLASTIC LAMINATE 1" li" CEILING OR WALL FINISH SAME AS d t--- -------' 74 Lc) 10 PL-2 118,120, 209 :.- - r•,,,cr COUNTER TOP -#--/ /-- SOLID HARDWOOD CABINET DOOR w A9.9 __,..ss,,,. IPL-8 132, 224 . '1/4. WOOD BLOCKING NOSING + ......-.... ' .___/} 8" MIN. 4, STEEL ANGLE CANTILEVER BRACKET I I I '' ....--------------1------- ....di SOLID HARDWOOD WD-1 FLANGE AT FACE OF - , — . . , . s _ ... . ... .. . . .... .. / • .. , 2- VERT. 01,,, DIM. PT.11 _1 LAV. SEE MECH. (NOT AT SIM.) PLAM. ,.....m..------- 1 CASEWORK in FIRE PI ACE I_NIERT,. \\ \ •i. \ + INSULATED DRAIN & H.W. ...„„..,_,L.s... VP" 'fr" ATTACH THROUGH GYP /-7 • • is gi---------------------__________L__*:.? SUPPLY - SEE PLUMB. b ,9.1• N MINIMUM CLEARANCE ADJUSTABLE SHELF _ _I • \\\-- 4 2 -LAYERS 543" TYPE X ---:'R( =1 B" ( 3 ) BOLTED CONNECTIONS GYP BD. CONT. 1x3 WOOD / ,, ,, CABINET DOOR- PLAM. OR HARDWD. TO STUD .9 g — _ SOLID HARDWOOD HARDWOOD VENEER CABINET BLOCKING VENEER W/ HARWD. EDGE BAND, SEE 11 FO FIREPLACE INSERT 1" i" 2" 1X2 DOOR STOP DOOR W/ SOLID HARDWOOD INT. ELEVS. d -0)- A9.9 ,--- - / / LIMESTONE FACE TO SIDE (NOT AT SIM) EDGE BAND CABINET TOP w N----44 - 't. FLOOR IN 1" (NOT AT SIM.) OR SIDE 6" END PANEL @ EXPOSED ENDS WHERE OCCURS, SEE MAX. / FACE OF WALL - ELEVATION A5.03 FOR EXTENT OF STONE PANELS 5 COL \ T": © LAVS. ak ,..:DDR CABI \ 7 17 V A \ ILE © R --= LAC: 13 - ARDWOOD \ OS \ G 9 RV- AL A9.9 SCALE: l' =-1'-0- A9.9 SCALE: 1" = V-0" A9.9 SCALE: 1/2 F.S. is•:::.' CHERRY VENEERED PANEL A9.9 SCALE: 1/2 FS. A9.9 SCALE: -1/2 FS. PLAM SCHEDULE .-... . ,. SEE ELEVATION A5.03 FOR V-3" U.O.N. / PLAM ROOM NOS. CEILING AFF ......'..,. VERTICAL REVEALS PL-1 102, 119, 130, 147, 148, SEE CLG. PLAN 215, 217 -... •,•-• e i..., \ PLAM SCHEDULE ..., 2" •. '• 1 0 PLAM ROOM NOS. ..., PL-2 118,120, 209 ,..-.:- SCRIBE TO WALL z TOP OF UPPER CABINET A9.9 1'-3" U.O.N. / PL-1 102, 119, 130, 147, 148, WHERE TOP IS ., .. %. I' 215, 217 ...- SOLID HARDWOOD POTENTIALLY ' : / PL-8 132, 224 e 1 ' WD-1 --•- . PLASTIC LAMINATE VISIBLE •-•.:Y.- 10 - PL-2 118,120, 209 '51* Arr. COUNTER TOP & NOSING ::. .\ / 1 A9.9 < ... 1/4 , FOR BACKING - NO. 12 FH. WD. SCREWS W/ PL-8 132, 224 __ SOLID HARDWOOD -. .... PLATE DETAIL / :••:.: SEE 6/A9.2 ' •• ' ---]" - '-- / ' • / CS. FINISHING GROMMETS @ 1'-0" O.C. MAX. EQUALLY SPACED PLAM. CASEWORK PLAM. ADJUSTABLE SHELVES CASEWORK MIIIMMIIIIIMININIIMIN. ( * / e-- -% _ CONT. 1X3 (2) NO. 10 FH. SHEET METAL .-,-,30 WOOD CLEAT SCREWS 1 1 A9.9 MICROWAVE 2,1- -N 1" :,.... DOOR STOP ------- CABINET BACK r "r'—"-------------- ------N FACE OF WALL , E 2 LAYERS 543" TYPE X (NOT AT SIM) 1" . GYP BD. . - METAL STUD AND GYP. BD. 1 1 • / de- A9.9 _ ‘ — PARTITION- SEE WALL TYPES =______________i 1.1 CHERRY VENEERED PANEL. END PANEL @ EXPOSED ENDS ••• ::.--------- PLASTIC LAMINATE (NOT AT SIM.) .i: . _ ______.____________--------- 6 LDDR S -- :-LVI \ G CABI \ -T 2 J .D .D =R CABIN7 W/ MICROWAT---- S - ----11- _ 18 VA\ TL- © FIR --- 1 AC --- S D --- 14 LASTIC LAVI \ AT-- \ OS \ G 10 L3D -R CABIV-7 ATTAC - V =:\ T A9.9 SCALE: 1" = V-0" PLAM SCHEDULE A9.9 SCALE: Vr = A9.9 SCALE: 1 2 F.S. A9.9 SCALE: 1/2 FS. A9.9 SCALE: -1/2 FS. PLAM ROOM NOS. PLAM SCHEDULE WORK COUNTER EXTENDED AT PLAM ROOM NOS. SIDE OF BRACE FRAME ROOM PL-1 130, 119, 14-8, 215, 217 . ••- •- • ' #130. FACE OF WALL ALL THESE ROOMS TO HAVE PL PL-1 102, 119, 130, 147, 148, : s. . ... .. . .. .„.... SOLID HARDWOOD SETTING ::::•-•: --.... ....,..,..---- SECURE CASEWORK NOSING SEE DETAIL 215, 217 AND BEAD FOR DOOR 14 ••• -.; -.•••••• TO WALL WITH AL. GLASS ANGLES A9.9 14 PL-2 118,120, 209 - - .. , ....,., A9.9 •,..-• • ... ..• 2'-61" SIM r > ,—...:- ALL THESE ROOM .,-•,::"-- .... • - -- CHERRY VENEERED / PLAM. COUNTER - 14 PL-2 114, 117, 118, 120TO HAVE 1 1 . .• ... ... ,... ----• - - INTERIOR TO ALL ,•:-- - - 202, 204, 209 HARDWOOD NOSING PL-8 132, 224 • ' ''• '• BOOK CASES ...-.. A9.9 SEE DETAIL 1 2 -- . • • - -, ; SIM. , -.:.•- :...:: : .,.... -.:-.:.-.::::i,: : HINGES TO BE CONCEALED CONT. 1X3 FRT. .. - (2) NO. 10 FH. SHEET METAL -N-- \ / (....) PL 5 143, 144, 146 A9.9 FACE OF WALL WOOD CLEAT ::-....,: = t4- • ,.:.i.....:_••:-..- •i• SCREWS @ V-4" 0.C. sim /1' ' ' NOTE: FOR ROOM NOS AND SHIM BACKSPLASH. --- LOCATIONS SEE A2.1& . „.• _ :.......,:.::...::......:..:........,-:,....i.ri....-......s.::,-.-1.•...,.. \\-•• ---:- NO. 12 FH. WD. SCREWS W/ / •2 PLAM. WORK COUNTER ,..0 I .......___ 1 ADJUSTABLE SHELF ,..... ..:-.........". CHERRY DOOR VENEERED 1x3 FRT. LEDGER •-• - .• SEE SCHEDULE ABOVE INT ,.,:-..: 7--.--1- PANEL AT WALL BEYOND • • - 1 -0" 0.C. MAX. EQUALLY .--ILN up FOR LOCATION AND PLAM FINISH. . , :,, .........• WITH SOLID HARDWOOD .. FOR BACKING INI --. - - SPACED . . . LIPPINGS TO EDGES. PLATE DETAIL ..- / :::_-__ ----- BOTTOM OF UPPER __________-- PLAM. BASE CABINET SEE 6/A9.2 7 . ..*. CABINET (2) 3/4" PLY WD. SUPPORT PANELS TO BE PLAM FINISHED. t x_i I 'I: •,..: I.!.. .-. -7\ .: .....1..:: \ I ANGLE BRACKET @ 1 6 ,i 1 8 IN ' ••'• •:•• •- . - • •N •• .- • ,•--:•\ '••• •••• - - ' ••••'•'• '.., --1 32" O.C. MAX .....:.: - 0 A9.9 X A9.9 ak'--------- ALL END PANELS TO BE FULL X FLOOR ...'.. • - IL PANFI WInTH \ _ 1" " - SCRIBE TO WALL, TYP. V-4" 1i" / 2'-O" U.O.N. / RUBBER BASE / ------...„...... ' ..,... - - ' .,,:. / 5 .''' -----1--? '--4--/-1' ALL SUPPORT PANELS TO HAVE STL. ANGLE BRACKET . ' ; IN WALL BEYOND BASE LEVELERS 7 CO ..) \ TES WO /( & &DAC 3 BAS="-- CABI \ 7T 1-9) LAN DOOR D =TAIL © BOO < CAS = A9.9 SCALE: 1/2 F.S. ( _15CO3 \ T---R SPDOT BRAC <"---T A9.9 SCALE: 1/2 -FS. SECTION ii -----R CABI \ - T ATTAC - V - \ T A9.9 SCALE: -1/2 FS. A9.9 SCALE: " = 17-0" = PLAM SCHEDULE PLAM ROOM NOS. SCRIBE LAMINATE TO ..-•,...: .. • •. '-:. '.::...; WALL PL-1 102, 119, 130, 147, 148, .. :- (2) NO. 10 FH SHT. 215, 217 MTL. SCREWS @ 1'-4" -,. .••' SOLID HARDWOOD CORNER • -: \ O.C. , 1 (WD-2) FOR BACKING 4 • PL-2 118,120, 200 -,--/ .`. NO. 12 FH. WD. SCREWS W/ .1:•.': ________„-------- 4" HIGH (UON) - ',I- PLATE DETAIL BACKSPLASH 12 N SEE 7/A9.2 7 •:': CS. FINISHING GROMMETS @ 1'-O" 0.C. MAX. EQUALLY 3" A9.9 j"-------1 t... ....---1 PL-8 132, 224 . . , . .. ... .. . ... . / --. — .- .. --- - .• •' • .....-- -: . . . .• // • - ••--.••. - . •- - - • - • - . - -. ‘.• ..•.•• SPACED .... . - - COUNTER TOP- SCRIBE BOTTOM OF . tz PLASTIC LAMINATE ......................, . / A - .--- TO WALL AT ENDS W/O CABINET CABINET DOOR 1 4 SIM. :•. :• A9.9 - ' 1 CABINET ....-- BACKSPCSH. 4 •...::- 1 BOTTOM ...• FACE OF exo WALL • - - DISHWASHER ..„ - CONT. 1x4 OR PLAM. WOOD CLEAT / .; l.: \ 7 ...____. N- REFRIGERATOR COUNTER & BACKSPLASH. CONT. 2X WOOD BLOCKING- SET :••....... FOR BACKING : -CONT. 2X WOOD IN SEALANT AT FLOOR, TYP. ALL • PLATE DETAIL RUBBER BASE CHERRY VENEERED PANEL. - . ‘••• BLOCKING AT CABINET CASEWORK : .•:. . • SEE ELEVATION A5.03 FOR BASE SEE 7/A9.2—7 ........1. r„- ______._-•------ NO. 12 FH. WD. SCREWS W/ FLOOR FINISH :., VERTICAL REVEALS • ''..-1 CS. FINISHING GROMMETS @ ;•:•.4- CONTINUOUS TO WALL ro METAL STUD AND ..--• O.C. MAX. EQUALLY SPACED / -------\ E \,,,,,,iwpyks .. ... ____.--- \ FLOOR .• .: • ' \,_-_- CABINET BACK RUBBER BASE . FLOOR > . .. 2'-0" U.O.N. FLOOR CONT. lx4 :- - »») u(«Y----,, * gl , WOOD CLEAT (2) NO. 10 FH. SHEET METAL al< - CSCREWS @ V-4" O.C. BAS7 CABI \ -_-_-T © DW OR R =TER CIRATOR DAV-1 DETA L 16 BAS ---- CAB \ ---7 ATTAC - NF\ T 12 BAS= CABIV-7 ATTAC - M ----7\ T / BACKSDLAS - 8 BAS--- AT CAB \ I-TS A9.9 SCALE: -1" = 1'-0" i A9.9 SCALE: 1/-2 F.S. A9.9 SCALE: —1/2 FS. A9.9 SCALE: —1/2 FS. A9.9 SCALE: 1/2 FS. 1.,.." CD i Revisions Date Drawing Title NI) 25 November 2003 0) 0 Alk 6-12-03 ANL FULL DRAWING REVISION Project No CASEWORK DETAILS C 0-) SRG PARTNERSHIP INCI i I I IIIII c\%%t D 11,e 2216 < co, New Tigard Library . ....„. CD Consultant Project No . JON R. SCHLEUNING '04. C.r..4 e"" xxxx CN ARCHITECTURE PLANNING INTERIORS Construction Documents r=4 .--3 Drawing No 6 (in • • Drawn BbDy E 621 SW Morrison Street,Suite 200 Portland,Oregon 97205 0 CD Ilia tp, PORTLAND, OREGON ,, .. Checked by z Tigard, • Oregon (., BB A9 • 9 crl T:503.222.1917 F:503.294.0272 www.srgpartnership.com 17z) ._ a ,_