Report Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing Inc. Eugene Office Salem Office (541)345-0289 (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER Date: April 17, 2019 Job#: T1905963 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: Compass Oncology—Tigard Westside Cancer Center Address: 12123 SW 69th Ave.—Tigard, OR Permit#: BUP2018-00242 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only: Reinforced Concrete Adhesive Anchors& Expansion Anchors Structural Steel Fireproofing Pile Grout Any non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the"As-Built Condition"or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. If CTI did not provide additional review or re-inspection of those items beyond the inspections that initially generated each of the non-compliance items, then the engineer of record has provided acceptance of the non-compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. P:1Projects\Genera1120191T1905963104-17-19 Final Letter.doc Updated 11/30/11 Date: April 17, 2019 Job#: T1905963 Page 2 of 2 CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC, Steven W. Leach Project Manager SWL/jng cc: McKesson Specialty Health—Rodney Villafranca RODNEY.VILLAFRANCA@MCKESSON.COM City of Tigard Building Division—Walter'Chip' Barnett EMAILED Corgan Associates—Steven Castaneda STEVEN.CASTANEDA@CORGAN.COM Turner Construction Co—Bruce Reid BREID@TCCO.COM Corgan Associates—Dennis Escobar DENNIS.ESCOBAR@CORGAN.COM VLMK—Brian Dubai BRIAND@VLMK.COM VLMK—Trent Nagele TRENT@VLMK.COM Carlson Testing, Inc. • Incompleted Items List (NCL) Apr 17,20I9 T1905963. Project Name: COMPASS ONCOLOGY - TIGARD WESTSIDE CANCER CENTER Project Address: 12123 SW 69TH AVE TIGARD OR Permit No: BUP2018-00242 P.O.No: 47722-0000000436 Project Manager: STEVEN W. LEACH Item# Insp. Date Item Description Compliance CTI Sign-Off Date Corrected 1 Al 01/24/2019 NO WELDING PROCEDURE RECEIVED AND REVIEWED KEITH R. GAUVIN 04/17/2019 DURING 01/30/19 INSPECTION BY CTI REPRESENTATIVE C. DEPUY. 2 DEL 02/27/2019 APPROVED FIREPROOFING SUBMITTAL WAS NOT ON HAND APPROVED FIREPROOFING KEITH R. GAUVIN 04/17/2019 FOR REVIEW AND USE DURING INSPECTION. SUBMITTAL RECEIVED AND REVIEWED. 3 DEL 02/27/2019 FP APPLIED W/O REQUIRED SUBSTRATE VERIFICATION ACCEPTABLE PER LOAD KEITH R. GAUVIN 04/17/2019 INSPECTION. REQUIRES ARCHITECT'S REVIEW. TESTING. CC:MCKESSON SPECIALTY HEALTH - RODNEY VILLAFRANCA CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT CORGAN ASSOCIATES - STEVEN CASTANEDA TURNER CONSTRUCTION CO - BRUCE REID CORGAN ASSOCIATES - DENNIS ESCOBAR Page: 1