Report (2) i
Attachment to Transmittal Letter-two pages RECEIVED
March 25, 2019
MAR 852019
Fountains at Summerfield CITY OF TIGARD
Deck Refurbishment Project BUILDING DIVISION
Contractor: Jon Edward Erickson CCB 162397
As part of the deck refurbishment project a mason was contracted to replace some
chipped bricks on the columns associated with several decks.
During removal of the bricks and in the course of deck repairs it was noticed that
several decks had one of the following problems:
• Beam was rotten
• Beam was previously replaced with a beam too short to make any contact with the
posts. It was only resting on the column by as little as 1.5 inches.
• Posts were rotten and not visible.
Repairs were made to correct existing rot and previously poor beam replacement with
better than"like for like" condition. The table below indicates repairs made. These
were not inspected prior to the columns being bricked up.
Deck Permit/Address Repairs Made
36 BUP2019-0030 Replaced both posts,beam.Added Simpson post/beam
brackets.
80 BUP2018-0339 Replaced rotten beam.Added one Simpson post/beam
bracket.Adding one Gabi post(external post).
88 BUP2018-0180 Replaced rotten and short beam.Added Simpson post/
beam brackets.
95 BUP2019-0031 Replaced rotten and short beam.Added Simpson post/
beam brackets.
96 BUP2019-0032 Replaced short beam.Added Simpson post/beam
brackets.
Future beam work will be inspected via a MISC. inspection.
REVISION
OFFICE COPY
City of Tigard
Approved Plans
By --J-1' Date t 3--)C1
.
Typical drawing and photos
Brick column façade
12x16 4,. , ..,
C
k4i....,-: . t',syr. .$. w..,,,,".'�..
Beam —4x12 or 4x10
,,„..i ,_,, ,
,..', I ' 4,
: Y; ,
4x4 PT post . r
litotiPatio j -
�*,v« %
, 4.f.•
rr-,-, -
T
a
4
. - --
, 1/4„ :.-t, or-..i, ,:- ._., , ,x,, , . , ;,,,,;444.7..:4..4t.:;., 4--.1;:.IT „,
K y
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard E COMMUNITY DEVELOPMENT DEPARTMENT
1111 44
=. Transmittal Letter
T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
7—,,7-7,,
TO: f G . DATE WE'VE__
DEPT: BUILDING DIVISION '-j V ED
MA2 5 2019
`]04 6�i GI SO 11 C Y OF TIGARD
FROM: 4 ILDING DIVISION
COMPANY:
PHONE: ,7r
03 ®' 750— 174/0 ,
By:,6.4
RE: Fovn fa i'14.5 At 5 merle( See 4/AA/Well
(Site Address) C (Permit Number)
r�f vb1eJ M€ it `n�n c1 " 00 c `� `,
D&k---(Project name or subdivision name and lot number) ��lV t �
ATTACHED ARE THE FOLLOWING ITEMS: )0r,4 di —C ;tl
Copies: Description: , opies: Description:
Additional set(s) of plans.
, i. Revisions:
2- X Cross section(s) and details. ,' ' 1 Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. A- Engineer's calculations.
Other(explain):
REMARKS: $e.e q? actm4eet ,,e- e.e, e tif
,/,
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: -- Initials: -1 )
Fees Due: ❑ Yes E No Fee Description: Amount Due:
$
$
$
Special
Instructs ns: _
Reprint Permit (per PE : ❑ Yes I No ❑ Done
Applicant Notified: Date: Li(i— Initials: its j
I:\Building\Forms\TransmittalLetter-Revisions 061316.doc