Loading...
PFI2019-00115 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12019-00115 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/03/2019 T f t;AI'Dg Parcel: SEG1334 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job M2693461 Project Description: SEG1334, associated with 10470 SW Park Street. Remove down guy on pole 1872 install span guy between poles 1872 and 1873. PGE Job M2693461 Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX: Applicant: WAYNE BRABHAM 10800 SW AVERY STREET TUALATIN, OR 97062 PHONE: 503-612-2918 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: ---�— Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00115 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OUCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED City ofTigard APR 0 3 2019 CITY OF TIGARD " PUBLIC WORKS —ENGINEERING PLANNING/ENGINEERING a II Public FacilityImprovement PFI Permit • TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) TYPE 1—Franchise Utility Work Check one: VUtilities ❑ Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE Detailed description: REMOVE DOWN GUY ON POLE 1872 and/or utility agency. INSTALL SPAN GUY BETWEEN POLES 1872 & 1873 ❑ TYPE 2—Sidewalk/Driveway/Sewer PGE Job M2693461 Work performed for the purpose of: • Sidewalk installation or repair. 10470 SW PARK ST • Driveway approach installation Property address/location(s): and/or repair Tigard, OR 97223 • Sanitary sewer lateral installation and/or main line tap Portland General Electric(submitted byNance Stone) ❑ TYPE 3—Full scale Development Applicant: Work performed with Land use Address: 10800 SW Avery Street approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-612-2918 Email: Preregcoord@pgn.com • Subdivisions or Partitions Contact name: Wayne Brabham Phone: 503-672-5440 • Street widening • Mainline installation for Sanitary Contractor: sewer, Storm sewer, Tigard water and/or Tigard Water Service Area CCB#: Expiration: Address: SUBMIT COMPLETED APPLICATION TO: City/state: Zip: City of Tigard Planning/Engineering Phone: Email: 13125 SW Hall Blvd. Contact name: Phone: Tigard,OR 97223 Applications for"minor work in right-of-way" only may be emailed to: Engineer: rowpermits@tigard-or.gov Address: FOR STAFF l SF ONI.l City/state: Zip: Phone: Email: _ Case No.: PF-no161-00115 Contact name: Application submittal fee(.007%of Engineer's Estimate) $ Estimated value of work is required(if over$5,000):$ Additional fees: $_ 'e"" (within the public right-of-way) Application accepted: r , By: ��� Date: `1 3_t Is work related to a LAND-USE DECISION? ❑ Yes 1No If so,please specify (MLP,SDR,SUB, etc.) case #: Application reviewed: N( By: EE Date: L( — 3-�9 Is work related to a BUILDING PERMIT? ❑ Yes L�f No , Applica t no ' ed: � If so,please specify(BUILDINCT PERMIT)case#: By: Date:Li , I:\ENG\PermitAppiications\pfi_application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page I of APPLICANTS NOTE: Person specified as'Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. -e77C7 637/ Steve Hursh 4/2/2019 Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONL\ Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL REQUIREMENTS APPLICATION FEE Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch (including information below) Engineer's estimate X 2%Plan Review ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance may be ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of4 SAMPLE SKETCH: Yi SI 11- •• , _ I• Edge of Pavement /1Ditch 1 , Streetlight �,1n�It 1 . ...1.2...—, .-■-■-■-■-■—........,—r-■- I • yRant Drain • rrri. A i�.. i ! if. D s,it 1 ' .t • _ I=1 ( �i I I T–' rrwriM ge 'ne" 1 I y'rap'ostiI I a.) a; , I r›, IExisting House I AI Existing 1 >r • Driveway 1?--i 01 I 0 a_, 7' 1 o1 V 161 i • a l Cfa �� 1 t ya.. I 1 o. Existing Shop I _= 'z- \ Powerpole I I = 1cpI 111 ! 95' II —D-------wpertyLni e----------- I I i 0 Fire Hydrant(FH) I I • I i Scale: 1"=30' II ! I I ; MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable): North arrow Property lines&dimension Slope of property Street &street name(s) Existing building, structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance(see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs "Buffer" Speed A B C Space 20 50 25 100 100 100 75 30 100 35 125 350 350 350 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 _ 70 365 Chapter 5 September 2016 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 ROAD WORK A A (0010114 ROADcl A 1 t AHEAD BE B TO STOP B jt' A (Optimal) 41. . LANE RDAD 100 • BE . 1.Max. ' P ..,, ROAD • TO STOP WORK AHEAD I A B B C I Buffer • : • ® CD ..4 • 11i -► •K . K K 4 ®. 1001.PAWL H C B B A TROAD BE WORK PF1EP -:_. . AHEAD TO STOP • 100 R Mex 'ROAD . MEAD • (owloneQ tA B BE PREPARED TO STOP B cam 1 t C AHEADO ROAD WORK NERD September 2016 Chapter 5 Page 54 2011 Edition Pedestrian Accommodation Diagrams See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work zones. Pedestrian Accommodation Principles: 1. If the work impacts the sidewalk or pedestrian facility, provide a safe, accessible path, where practical, in accordance with the requirements of the ADA. 2. If not practical to match the width of the existing pedestrian facilities, maintain a 4-ft minimum width. 3. Unless a reasonably safe route can be provided through the work space, pedestrians should be appropriately directed with advance signing to cross the road. Do not divert pedestrians into travel lanes. 4. Install pedestrian closure or detour signing on Type II barricades. Make every practical effort to satisfy the following: • If work closes a sidewalk or sidewalk ramp, close sidewalks at a point where an alternate crossing point or route can be provided. Minimize the amount of out-of-direction travel for pedestrians. • Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE" (R9-11 a) signing to direct pedestrians to an alternate facility. • Where there are business destinations between the nearest crosswalk and the work area, close the sidewalk at the business access nearest the work area, where practical using the SIDEWALK CLOSED sign. Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the nearest crosswalk prior to the closure. C) U_ a Chapter 5 September 2016 Page 56 2011 Edition Pedestrian Accommodation, Intersection Diagram 5-8 For work near an intersection, close crosswalks and/or sidewalks as necessary when safe passage cannot be maintained. SIDEWALK CLOSED USE OTHER SIDE 24x12 Type'W1" (Mount on B(II)LR) ROAD WORK AHEAD / ! ,,,,,,, (Optional) I' / • SIDEWALK CLOSED SIDEWALK CLOSED CROSS HERE 41111 USE OTHER SIDE /. SIDEWALK 24x12 • •24x12 �� CLOSED Tnt on B( Type"W1" • 24x12 (Mount on B(II)LR) (Mount on B(II)LR) Type"W1' (Mount on B(II)LR) . SIDEWALK CLOSED N AHEAD Q CROSS HERE a 24x18 L.) Type"W1' by (Mount on BOOR) I ROAD WORK AHEAD / (Optional) Chapter 5 September 2016 Page 52 2011 Edition Bicycle and Pedestrian Accommodation Diagrams The following practices and details address the accommodation of bicycles and pedestrians within work zones. The following detail drawings should be incorporated, where appropriate, into the traffic control plan for any short term work. 1. See Section 1.6— Bicycle and Pedestrian Considerations for additional guidance. 2. Stay alert for pedestrians and bicycle traffic and accommodate safe passage for them, as needed. 3. The work space should be protected from bicycle and pedestrian intrusion by using barricades or closely-spaced channelizing devices. 4. Maintain access to transit stops or clearly close a transit stop using barricades or channelizing devices. Bicycle Accommodation Diagram 5-6 Bicycle Accommodation Principles: 1. If a significant volume of bicycles can be expected and work closes a marked bicycle facility, or requires bicycles to share a travel lane, install a"(Bicycle) ON ROADWAY" sign (CW11-1) or the Bicycle symbol (W11-1) sign with an "ON ROADWAY" (OBW1-5) rider, in advance of the work area. 2. Install temporary signing off the paved shoulder, within the planter (buffer) strip, or share the width needed between the shoulder and the sidewalk, as available. 3. Signs are to remain in place until the surface is restored and the width made available for bicycle use. See Diagram 5-6 for typical bicycle Q signing placement. TO Sign Spacing and Buffer Lengths(feet) >Q Posted Spacing Between Signs "Buffer" Speed A B C Space 20 50 _ 25 100 100 100 75 30 100 35 125 350 350 350 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 53 Bicycle Accommodation Diagram 5-6 NOTES: • Bicycles on Roadway(CW11-1)sign should not \ interrupt standard sequences. For example: BE PREPARED TO STOP/Flagger Symbol \ o LANE CLOSED AHEAD/Lane Ends Symbol • Bicycles on Roadway sign typically follows ROAD WORK AHEAD sign and used as general warning. TirA A A tll B [D t ON ROADWAY /ROAD \ WORK AHEAD September 2016 Chapter 5 0,, OVERHEAD LEGEND o O Q m< ma REMOVE FACILITIES=I INSTALL FT N m 2284 45'-4 1952 11 INSTALL 3/8 SPAN GUY B2 AL pL-1873 3-B 6 Cu '2 I-1/' iIINSTALL 3/8 SPAN GUY 3-B 4 CU II 143 6 T #2730 Open B 15 48521 �"1 SW PARK ST BBCU C2 1.03D O 235' x X z 4185743.4 • - ANCHORS ww i m 1952 - - • • - 41872 = ± Qa w c �1 C 45.4 y n N g a ,, O` 1994 K 4 O tV F A y p1.1872 ANCHOR CODE mmmmm 3129 c INSTALL: 45'-4 3 1955 3 G4 INST0LL3/8SPAN GUY GUYING ±d = u REMOVE: 10470 . d o 0 0 0 • mr� to REMOVEDOWNGUY e. H e, G16 AND ANCHOR AT PL 1872 1 GUY m1:1m"e=3:1 2 GUYS EImMIZZeIZIeE 3 GUYS mmmNZI E ANY DEVIATION FROM THIS DESIGN MUST BE APPROVED BY PGE PROJECT MANAGER 10474 13473 • -INTACT SERVICE COORDINATOR THINK ':TION PRIOR -ALL WIRE uLLED. SAFETY 1 SERVICE p �ry 503 323-700 OR 900-542-8818 RDINATOR FIRST! 1 RIGHT-OF-WAY PERMIT NOTICE: A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY WORK IN THE RIGHT-OF-WAY MAY BE PERFORMED. ONLY PGE APPROVED PGE CONSTRUCTION DRAWING CONSTRUCTION NOTES: OH CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL DATE:3/20/2019 SCALE:NTS (ACCOUNT:1070001 IAWO. 1000004545 N0°'p•M2693461 AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT. TITLE 1. SEE THE PGE ELECTRIC SERVICE REQUIREMENTS (ESR) BOOK FOR THE FULL SET THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS AL SHAMARI OF REQUIREMENTS.THE ESR BOOK CAN BE FOUND AT hrtpn://www.poreandgeneral.com BEFORE WORK IS TO BEGIN.A COPY OF THE PERMIT MUST BE ON SITE. CIRCUIT SIZE 2. CUSTOMER IS RESPONSIBLE FOR OBTAINING ALL BUILDING AND ELECTRICAL PERMITS FOR TIGARD-TIGARD 13 I 11 X 17 THE APPROPRIATE MUNICIPALITY.CUSTOMER IS ALSO RESPONSIBLE FOR OBATINING ALL EASEMENTS AND TREE-TRIMMING PERMITS,AS REQUIRED. CALL 811 BEFORE YOU DIG PGE LOCATION ATTENTION: 10470 SW PARK ST TIGARD 3. ALL TREE TRIMMING IS REQUIRED TO BE COMPLETED PRIOR TO PGE INSTALLING SERVICE. OREGON LAW REWIRES YOU TO FOLLOW RULES ADOPTED 4. CONTACT PGE SERVICE COORDINATOR IN ORDER TO RECEIVE AN APPROVED METER BY THE OREGON UTILITY NOTIFICATION CENTER. DESCRIPTION SPOT AND CONFIRM THAT THE SERVICE WILL MEET ALL APPLICABLE CODE CLEARANCE THOSE RULES ARE SET FORTH IN OAR 952-001-0010 8tN REMOVE DG ON POLE 1872-INSTALL SPAN GUY BETWEEN PL 1872 8 1873 REQUIREMENTS OVER GOUND,STREETS,PARKING LOTS,ROOFS,DECKS AND BALCONIES, THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF ACROSS OR BESIDE OTHER OVERHEAD UTILITY WIRES,AND ADJACENT TO WINDOWS. THE RULES BY CALLING THE OREGON UTILITY `` ' COUNTY SECTION(S) WORK WITH SHEET 5. AFTER PASSING THE APPROPRIATE MUNICIPAL ELECTRICAL INSPECTION, NOTIFICATION CENTER ADMINISTRATION (703-232-1987) BEAVERTON WASHINGTON 021020 1 of 1 CUSTOMER TO REQUEST AN INSPECTION BY PGE BY CONTACTING A SERVICE COORDINATOR LINE CREW CENTER DESIGN BY PHONE(503) DRAWN BY ATE 800-54245818 -542-818 OR 503-ALL 23-6 00 INITHE INSPECTIONS HAVE PORTLAND AND AREA. PGE GED.WILL NOT ENERGIZE TO REQUEST UTILITY LOCA ILS CALL THE OREGOI. Know what's below. 2211 SW 153RD OR Wayne Brabham 672-5440 SUJATHA NARAYANAN UTILITY NOTIFICATION CENTER,811 ATL FAST fall BEAVERTON,OR 97006 2 BUSINESS DAYS PRIOR TO EXCAV"' ' before Tou dl9• 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED