PFI2019-00105 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT N . - , COMMUNITY DEVELOPMENT Permit#: PFI2019-00105 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/03/2019 TIGARD. Parcel: SEG573 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: OR217 Auxilary Lane& Hall Crossing Project Description: SEG 573. Geotechnical investigation conducted on behalf of ODOT. Investigation will help project team understand the surface and subsurface conditions to make improvements. Owner: FEES Description Date Amount PHONE: Contractor: HOLT SERVICES INC 10621 TODD RD E EDGEWOOD, WA 98372 PHONE: 253-604-4878 FAX: Applicant: KELLY HAWLEY 123 NW FLANDERS STREET PORTLAND, OR 97209 PHONE: 503-731-3001 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: J A- PL104TZ,Q{J LrilL Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00105 Type: Condition Name: Status: Severity: PFI_Sidewalk/[ 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Sidewalk/[ 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Sidewalk/[ 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Sidewalk/[ 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Sidewalk/[ 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Sidewalk/[ 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense PFI_Sidewalk/[ 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work with affected utility agencies. PFI_Sidewalk/[ 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Sidewalk/[ 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Sidewalk/[ 18-SEWER SYSTEM TEST Applied Notice A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval. PFI_Sidewalk/[ 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Sidewalk/[ 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Sidewalk/[ 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Sidewalk/[ 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Sidewalk/[ 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Sidewalk/[ 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Sidewalk/[ 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Sidewalk/[ 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Sidewalk/[ 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Sidewalk/[ 28-AS-BUILT DRAWING Applied Notice One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI Sidewalk/[ 31 -OTHER Applied Notice Other PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Sidewalk/[ 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Sidewalk/[ 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Sidewalk/[ 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Sidewalk/[ 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Sidewalk/[ 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Sidewalk/[ 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. RECEIVED MAR 2 7 2019 � �OD�05 City of Tigard CITY OF TIGAR PFI#: �� IIID i ENGINEERING DEPARTMENT PLANNING/ENGINEERING T I G A R D Public Facilities Improvement FI Permit PROJECT INFORMATION TYPE OF WORK Project name:01E141WE. A thaurAIL.7 taw. + 414u.bLUD O')P$4 E / 0 TYPE 1—Franchise Utility Work performed by NWN,PGE and/or Brief description of project: Ci6atit uNrtat. Syvtsisc.*uo tom)ova op utility agency StittALP OP ODet.-114t I,Jlc4rEt t;Atto0 W rut. KEI.?t vt I 'PtcarCsa T64µ gift A TYPE 2—ROW Sidewalk/Driveway/Sewer Work QoIttt 0t.+aat4114 ► at SII eE t SV 4iU4e4 UWor VD't•co Waif?utnt.goµkti. performed for the purpose of • Sidewalk installation or repair. SITE INFORMATION • Driveway approach installation and repair Location (address if available): mom acSo Sw 1Pc I ST,-Txt.Ar ,ow • Sanitary sewer lateral installation and main R-7.2.2.3 513 line tap 0 TYPE 3—Full scale Development Work performed with Land use APPLICANT INFORMATION approval which includes any of the following: Name: OREC.oU PEPArtwort of IZANSPoRMiet eN • Subdivisions or Partitions Mailing address: 12S NIA.) FL•4C* S Si • Street widening �p • Mainline installation for Sanitary City/State: T orciAND/ be. Zip: 1-0.49 sewer,Storm sewer,Tigard water and Tigard Water Service Area Phone: 503-'i 31-3 00 l o TYPE 4—Small Cell Technology Email:)(Gut,/.R. i AwLE•,Q 4P t.S'ttt*,ott,Phone: 5G3-731-3001 0 TYPE 5—Tigard Triangle VS Contact name: k.Eul Wt,61 Phone: 503-73 t-'doe i Email: ;C.Et.L.1.R.iKA why to oPort.sTAT4,ba.VS CONTRACTOR INFORMATION 0 Same as applicant Name: '401.-T 4R+lsoasiTNC. CCB Number: 1`le1(a I Mailing address: 1.5 Notaw V STR€r City/State:VAI4tsivret.1 WA Zip: q.$4(0 l Phone: 340...111.-/5640 Email: Ps th iiM C. 1ne tiStr, ct- c.t.0"06 ENGINEERINFORMATION Name: SRS( Allat4K j Sl.►ANNOPJ S tar“oNtJrJa. Mailing address:39 LO Cou.s+Js "JAS, S, I too City/State: (-Ake DSwEC,D, 012 Zip: 8-7035 Phone: SOS-210-L1171 Email: SCR 0 SWANt#lru.COtA- ADDITIONAL INFORMATION 4 Estimated value of work is required(if over$5,000):$ t'"/A (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes X No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee" and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a Iessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant, certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. ERTC. PAS w.iae.e. 3/27`tot Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No:PROM- 001,05 Permit fee: -4:30" Received by: Date: 31211')ef Approved by: Date: 4. 1 • 2011 Notified by: Date: `13-1' City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI) Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations. Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3: DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit Eli Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) El Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) in ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Mall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 (;) S«- y .S t r ,_.,._. Edge of Pavement ---6, .,,4,_._, Ditch _....�.. oStreetlight .•_._._._....._._....r_._. / �,. °» Ria►Dram y w 3 k✓ it .? `, ', 2 E '..,-71. _ _mss.1t�.,�. Q> .rim , 4 1 r�0 ' T-776 5Vi-Ei `S'i erTrne"' I � . I �,� - . Existing House •I �1 I Existing ,! f. . Driveway • iii .. I. 114.\</.41011 .51' i4 i 4,-IFA I CL i ! r—I 1 Crl .j a' 1 of � Existing Shap I a 1 � J Powerpole 1 i I z I rte. a 95' 1 1p.---—---—--70-p-J-ity-Line i {�ri : Fire Hydrant(FH) I I I Scale: 1"=30' I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines &dimensions Existing utilities locations (sewer,storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 SHANNON EMIL.SON, INC. ® GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS March 27, 2019 City of Tigard 13125 SW Hall Blvd Tigard, Oregon 97223 Attn: Brady Bullinger RE: CITY OF TIGARD PFI PERMIT APPLICATION GEOTECHNICAL INVESTIGATION FOR OR217 NORTHBOUND AUXILIARY LANE AND HALL BLVD OVERCROSSING PROJECT (KEY NO. 21179) The Oregon Department of Transportation (ODOT), on behalf of Shannon & Wilson, Inc., submits the attached City of Tigard Public Facilities Improvement (PFI) Permit Application for geotechnical drilling for review. The proposed geotechnical drilling is required prior to construction of the OR217 Northbound Auxiliary Lane and Hall Blvd Overcrossing project (Key No. 21179). ODOT is planning to improve mainline safety and operations for approximately 2.34 miles of northbound OR217 by adding auxiliary lanes between SW 72nd Ave and SW Scholls Ferry Rd (OR210). In addition to the new auxiliary lanes on OR217, a new overcrossing structure at Hall Blvd is required to accommodate the highway widening. The following boring summarized in Table 1 is located in the City of Tigard right-of-way (ROW). The boring location is shown on the attached Site and Exploration Plan, Figure 1. Table 1 summarizes the exploration, proposed traffic control requirements, and proposed working hours. TABLE 1: PROPOSED BORING SUMMARY Anticipated Boring Design Structure Depth Traffic Control Shift Hours Designation (feet) 21179-P6 Pavement I 0 Single Lane Closure 9 pm-5 am of SW Pfaffle St Boring 21179-P6 will be drilled using a truck-mounted drill rig. The boring will be initiated using mud rotary drilling techniques. A Shannon & Wilson representative will be on site throughout the exploration program to confirm that boring locations are in accordance with the 3990 COLLINS WAY. SUITE 100 LAKE OSWEGO,OREGON 97035-3480 503-210-4750 www.shannonwilson.com 100668-003 City of Tigard SHANNON aWIL.SON,INC. Attn: Brady Bullinger March 27, 2019 Page 2 of 3 bid documents, and to observe drilling, collect soil samples, and log the materials encountered. We anticipate drilling will be performed in May 2019 and will take one night. Traffic Control Traffic control will be required for drilling operations. Traffic control will consist of a lane closure of SW Pfaffle Street. Site traffic control will be subcontracted to D&H Flagging (D&H), of Portland, Oregon. D&H has prepared a traffic control plan, which is attached to this permit application. All traffic control devices will be set up and in place before any personnel or equipment enter the work area. Likewise, traffic control will be removed after all other personnel and equipment have left the right-of-way (ROW) at the end of the work period. Surface restoration will be performed at the end of each work period. Best Management Practices The Shannon & Wilson drilling subcontractor will abide by industry Best Management Practices. Plastic will be placed under all drill rigs at locations susceptible to fluid leakage. Spill kits will be present and readily available on every drill rig. When drilling near rivers or other bodies of water, silt fencing or straw bales will be used as a safeguard against drill fluids entering the water. All drill fluids and cuttings will be drummed and removed from drill sites. Moist areas will be protected from vehicle and foot traffic using landing mats. Investigation-Derived Waste Handling and Disposal IDW generated during the subsurface exploration program will include drilling mud and soil cuttings from drilling. IDW at boring locations will be handled by the drilling subcontractor. The drilling subcontractor will provide 55-gallon steel drums at drilling sites prior to the start of drilling. Our drilling subcontractor will remove the drums after the boring is completed. Additional Work in Tigard ROW We will be accessing ODOT ROW from the same location noted above to perform additional geotechnical drilling for the project. We will need to close the lane for approximately two hours to load and offload equipment onto ODOT ROW. We anticipate the loading and offloading will City of Tigard ROW Permit Application 100668-003 City of Tigard SHANNON&WILSON,INC. Attn: Brady Bullinger March 27, 2019 Page 3 of 3 be performed during the daytime between the hours of 8:00am to 5:00pm. The loading is scheduled to occur the week of April 22, 2019 and the off-loading is scheduled to occur the week of April 29, 2019. The same traffic control plan provided for the geotechnical drilling will apply. Please contact Eric Paslack at 503-210-4771, if you have any questions about this permit application. Sincerely, SHANNON & WILSON, INC. Eric Paslack, PE Senior Engineer Enc: Figure 1 —Site and Exploration Plan Attachment A—Traffic Control Plan City of Tigard ROW Permit Application 100668-003 Filename:T:\Projects\PDX1100000s1100668_ODOT R1_OR2171Avmxd\Pavement_Site_Plan_10.3.mxd Date.3/21/2019 Login.clv .ke� t t ' r D co D -0 �.-0 0 O 0 0 0 x x .,. > m 0 m 't Q cD m I— . I— C) 0 0 Ce?) v ,�.._ 44 v 3 v '.. ► o FS• a 0 0 0 0 . � r O 0 7 m :. 0 lj o 0 OH Z t m 0 ~ v o 0- SW LOMITA .r 11,0 m AVE� V n (-D t> o - • 0 CD 0 o Vl 1t7 CD Cii f .r 1 ..x,, ra .^tib F, °w?*3".f ~a�, a w'� Ms z 4 A , r �v ` x m +i' n — cn + °t 0 " d .4 ,4 Or,„.,"... t'L T .. r ( C/}�}�� ! . n 1 y. r.. x YY4u..o- 1"A Ni01 , ' y, p O s i I , . Pkg.: ' '.' ,.r, , . I.- • ^ 0 r m D 1 � g g C(D SW HALL BLVD .i —, 0C 0 0 N O� (gyp OECD AOR ` x• D c o , v •i ,,,44 ,,, o D. . Qa c'D v 8 OP m Q.) Q 0_ ,.-.- Z r/ -.0 CD ,. —I CD O o m //, 3 co / ... C7 N -" O y„ , 0 wx, x,.' CD � o t �.� r O_ 0 o (p r 30 o > . ', N f f1 1 rt iti 0 a v 0) 5 71 fir, n Ci) o O f C .‘'' 7- --,• r+M.M-v.M.ai..vmw#W"ml v,004$1.M'M'-♦ Co 0 0 m -p 4 � . , O Q A m , 5. 1c4; , y r m . . __ .,__ �.. mw+.0 yay�+.WuHwsa..Hi,wWuuxM m+M1 harq ,..�r.w:a .wayww�,>.«,y P _ v w i o �Z m =z o D Z r m w G^ 0 CO 4 .. I Y a. , ir! E e ,„,,—,, Z ` , 1>< '(;)-' , i ens ., "°' .r,. ''. . '''''- S s X 46 t . f. 1- m n _ :; � r .e3 � r-,-.'Z Z O Q may . r Z 73 R1 2 ' ^' SW 84TH AVE n `c .o mT r w _ Z CQ im, ,v r €a ,+ It "1.1 N.) baa. 1 ` GI CD D e n r s �, . Y effg 2 �. Pam ," "K 1 , S W I Notes 4.../':---!-';,. Y '/ ' It 4., t 7'" ..- t 11 1. Traffic control&work zone shall not affect access to pedestrian facilities . 2. Maintain 11'minimum lane width for auto traffic at all times 4N ��1 ��� 3. Cone spacing at<35 MPH I Taper=20'�Tangent=20'1 Corner/Access/Bike/Ped=10' 1*1 ;.: .0 4. Adjust devices so that residential and/or business entrances/exits are not affected = 5. All traffic control shall adhere to current MUTCD&OTTCH guidelines Plan Not To Scale in 6. Adjust to field conditions _ - +1 0 LA el . w e SPEED e� til CO - LIMIT ,+ + lj A ,,, -‹t,,-,:, +, ,,,t1-,-s,,.. ,:„.- <4 .. .._.... „< (...,:i';; I: Ns:To o ,:€ICES . ON �CO <-.. Aci k ROADWAY 3 iA i [i;;11 cot. lO5'SHIFT ;3i 7 CONES K E * 350'± * 350'± * _ 350'± LEFT ' •-• • • • • • • • • SW Pfaffle St t' =r 1 4111= SW Pfaffle St • 111111°*- • 100 Work Zon ._e : - • K�� ° " , ",!-,,,,..\`.%; • i o SPEED t ° -.- f— LIMIT CO . / Q 35 ,7 rg v Schoo\Pccess N a, , SPEED LIMIT 30 v ROAD Equipment List Legend D& Jesse Dickens Contractor: Shannon&Wilson.Inc. WORK Contact Person: Christina Villeneuve AHEAD V 48"x 48"Signs w/Flags FLAGGINOffice: (503) 232-2488 5 Road Work Ahead Fax (503) 234-4572 Phone. (503)210-4762 T e II Barricade "women-owned business" Email: CLV@shanwil.com 1 Shift(R) 1 Bikes On RoadwayType pansd-hflagginq.com Job Location: SW Hall Blvd&SW Pfaffle St 1 W6-3 • 28"Cones 146.8City,State: Tigard,OR of n 1 Type II Keep Left __ Work ZoneD&H PLAN #7746-1 Type of Work: Equipment Unloading/Loading f25 28"Cones Parking Lane 1`'� March 19. 2019 Job Duration: 1.5 Hours