PFI2019-00094 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PFI2019-00094
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 03/25/2019
Parcel: SEG3419
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE Job M2657533
Project Description: SEG3419, associated with 7805 SW Dartmouth. Provide UG service to storage facility. PGE Job
M2657533
Owner: FEES
Description Date Amount
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
TRAVIS SMALLWOOD
10800 SW AVERY ST.
TUALATIN, OR 97062
PHONE: 503-612-2918
Total $0.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: CIt pp Lt Cc1
Issued By: tior\A--/
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00094
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
Cal Ken fisher at 503 816 6146 or Kenny@tigard-or.gov
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
RECEIVED
City of Tigard MAR 2 0 2019
w PUBLIC WORKS —ENGINEERING a CITY OF TIGARD
Public FacilityIm rovement PFI P �IGIENGINEERING
TIGARD
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way) TYPE 1—Franchise Utility Work
Check one: 'Utilities ❑ Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE
Detailed description: PROVIDE UG SERVICE TO STORAGE FACILITY and/or utility agency.
❑ TYPE 2—Sidewalk/Driveway/Sewer
PGE Job M2657533 Work performed for the purpose of:
• Sidewalk installation or repair.
ABT 7805 SW Dartmouth St. • Driveway approach installation
Property address/location(s): and/or repair
SS . 39I q Tigard, OR 97223 • Sanitary sewer lateral installation
and/or main line tap
Applicant: PGE (Submitted by Nance Stone) LI TYPE 3—Full scale Development
Work performed with Land use
Address: 10800 SW Avery Street
approval which includes any of
City/state: Tualatin, OR Zip: 97062 the following:
Phone: 503-612-2918 Email: preregcoord@pgn.com • Subdivisions or Partitions
Travis Smallwood 503-672-5428 • Street widening
Contact name: Phone:
• Mainline installation for Sanitary
Contractor: Moore Excavation sewer, Storm sewer, Tigard water
and/or Tigard Water Service Area
CCB#: 28397 Expiration: 10/10/20
Address: PO Box 789 SUBMIT COMPLETED APPLICATION TO:
City/state: Fairview, OR Zip: 97024 City of Tigard
Planning/EngineeringPhone: 503-674-0900 Email:iWilhelm.Egloff@themeigroup.com
13125 SW Hall Blvd.
Contact name: Wilhelm Egloff Phone: (503) 674-0900 Tigard,OR 97223
Applications for"minor work in right-of-way"
only may be emailed to:
Engineer: rowpermits@tigard-or.gov
Address:
I.OIt S'1 \I-I- l SI: 0\1.1
City/state: Zip:
eFIL011-000111
Phone: Email: Case No.:
Contact name: Application submittal fee(.007%of
Engineer's Estimate) $
Estimated value of work is required(if over$5,000):$ Additional fees: $
(within the public right-of-way) Application accepted: s�
By: ,.SC Date: 3-al Q
Is work related to a LAND-USE DECISION? ❑ Yes 11No
Application reviewed:
If so,please specify (MLP,SDR,SUB,etc.) case #: 44tL—By:AaDate: 3"Z�')�
Is work related to a BUILDING PERMIT? ❑ Yes 12/No Applicant notified:
If so,please specify(BUILDING PERMIT)case#: By: Date:3 I2Sl 1`k
I:\ENG\PermitApplications\pfi_application Rev.10/16/2017
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if
required by the city pursuant to TMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owner's signature on the application
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
property.
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
3-�ePn e3 Steve Hursh 3/19/2019
Applicant/Authorized Agent's signature Print name Date
SIGNATURES of each owner of the subject property, if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of
DEVELOPMENT ENGINEERING FEES r:o It STAFF USE ONE\
Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL
APPLICATION FEE REQUIREMENTS
Part 1: Required submittal fee$300.00(minimum) FRANCHISE UTILITY AND SIDEWALK/
DRIVEWAY AND UTILITY
PERMIT FEE CONNECTIONS,ETC.
Part 2: All non-water system improvements (work in the right of way)
Engineer's estimate X 5%(less$300.00 minimum
submittal fee) Sketch
(including information below)
Engineer's estimate X 2%Plan Review
❑ Dimensions
WATER SYSTEM FEE ❑ Street Name
Part 3: All public water system improvements ❑ Site Address
Engineer's estimate X 12%
FULL SCALE DEVELOPMENT
PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements)
There will be no permit fee charged,or assurance required
for the following types of work: Design Plans
• Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34)
• Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend
• Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.)
• Weep hole repair ❑ Street(Plan,Profile)
• Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile)
• Lawn sprinkler system installation or repair ❑ Water Quality Facilities
• Street tree pruning or planting ❑ Grading
• Planter strip landscape maintenance ❑ Landscaping/Tree Plan
• Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas,
Storm,Sanitary,Water,Signage,Street Lights,etc)
❑ Details
Note: A cash/bond assurance may be ❑ Traffic Sight Distance
required per TMC 15.04.140. ❑ Signing and Striping
(customer deposit) ❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design(if applicable)
❑ Water Department Approval
❑ Engineer's Construction Estimate
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of4
SAMPLE SKETCH:
f) \y " 1 " sI
Edge of Pavement
' " —t\SeetIi9ht
.i■.•■!r—■i
. Rain Drain
r .41
r_
,/
�o
Ai/
i�:
' p r'e
' .� i
I •
Tl 173774rir5ev7 iTne"
I rev. I
n
I } 1 o 1 Existing House
I A I Existing
• Driveway
i- n1
�I op
C I R I • ■
a_,
4(11"1-1.. I %—il
o�
1 ii
t
a• I I
'I
� 0,
IExisting Shop I
I J I
Powerpole u I - I I
I 95' I
• -157opeityLine
I 0 I IN
Fire Hydrant(FH)
I
I I
I ■
Scale: 'I"=30'
I I
I I
I I
I ■
I
MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable):
North arrow Property lines & dimension Slope of property
Street &street name(s) Existing building, structures Utility&street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of
www.invarion.com
a -,
C,
r-m
R' Provide spotter(s)to VT-803 Cl)D PD-31
r` assist pedestrian traffic v
safely around work area. L-—=
IIII-------\---- ____---------____.______------
t1
SW Atlanta St t ►
1100'+I- ►
VT-30
ir o
0
000
►
III A Doi
aa
VT-803
\..--100'+I
AN
► ► ► A SW Atlanta St
• Use flagger to hold traffic for
vehicles trying to make a right
turn off of SW Atlanta on to
SW Dartmouth.
1 4)0 I
�► ODOT PERMIT# .
► OWNER: PROJECT/JOB NUMBER
► n PGE(Wilsonville ICC) M2657533
A PROJECT NUMBER/LOCATION: CITY/STATE:
I A ABT 7805 SW Dartmouth St Tigard,OR
,___
► PRIME CONTRACTOR:\I
Be
PREPARED PGE'
I TO STOP CONTACT NAME/NUMBER EMAIL
1 i
Travis Smallwood/503-672-5428 travissmallwood@pgn.com
Z cp -- PREPARED BY: TRAFFIC CONTROL CONTRACTOR
H v I
C Borden Potelco Inc.
o I—
G I POT'ELC0 INC
; 40,
IU- I
m
20
s
+.,O 1 +
o
E
I 0
8
C 1
O to
V !_
J C
J _ 1 'CLOS pE
Q AHEAD
II
0
ai 1
v w
ai
.. td I .
N
c4- O I
cc
6i_ N 1 DEVICE SPACING:
C .O 1 ON
CD w Z ROADWAY
.r 113 C ROAD TAPER: 20'
woRK
a a A"EA TANGENT:20'
35�
.�.._,...-' -- NEW PGE FACILITIES TO BE INSTALLED
A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE AN'.' 9 Np (UNLESS OTHERWISE SPECIFIED)
WORK IN THE RIGHT-OF-WAY MAY BE PERFORMED. ONLY PGE APPROVED `^
CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHERSPECIAL 7C3 1\ =Ill& A.,ILi I IL,,'N,,,, .,.'/L•0 BE REMOVES;'
AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT.
THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS 799 p Tt ■ 6'x6'TRANSFORMER PAD,
BEFORE WORK IS TO BEGIN.A COPY OF THE PERMIT MUST BE ON SITE 45'-0 y PROVIDED&INSTALLED BY CUSTOMER
.. -T--- 1992 I,a
3-142 25 T NT 50• 11487 577-PGE VAULT,WITH 57-T-2-332P-PGE TOP
O PROVIDED&INSTALLED BY CUSTOMER
50 11500 p0-31 PGE TO INSTALL 3-4 WAY LATERAL TAPS
r
INSTALL: O FAULT INDICATOR
12130 ABC 0 150KVA
50'-4 PAD MT PROVIDED&INSTALLED BY INSTALL 1-1/0 AL-JKT TX IMARY IN 1-4"CUSTOMER PVC CONDUIT
1971 7200V,120/208V,3 0,4W
INSTALL 1-42 AL-TX JKT PRIMARY IN 1-4"PVC
- - ---- CONDUIT,PROVIDED&INSTALLED BY CUSTOMER
GEAR WALL -
.,_. ---- INSTALL 1-8350 AL-OX SECONDARY IN 3 OF 3-3"PVC CONDUIT
(o - PROVIDED&INSTALLED BY CUSTOMER
aaN L 0
v EXISTING 4"PVC CONDUIT
m VT-803
rx -{9--, FRONT - CONSTRUCTION NOTES: CMDEV
T
TR 12D/208V I.CUSTOMER IS RESPONSIBLE FOR ALL TRENCH,CONDUIT.VAULTS.PADS AND
\. ROAD CROSSINGS.
2. A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS,
9-57- �, i 800AMP OF CONDUITS BOXES AND ESTRING.CALLILITIES,INCLUDING CONNECTION OR INSTALLATION
4 2.94%VD @ 344A TO CEEANPSEUSTANDBY CREW LBERVICE COORDINATION AT SOY3236T00
16,274A AFC 3.ALL CONDUIT TO BE INSTALLED WITH 30 INCHES(MIM COVER AT TOP OF CONDUIT
FROM FINAL GRADE.
4.ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY.SCHEDULE 40,ELECTRICAL GRADE.
A('. PVCCONUUITWITHNVLONPULLSTRINGS MIN.SOOLBS.TESI).PGEYODETERMINE
24 HO ONTAL BNCH S CLEARANI CES ETWE�EN GAS AND OTHER UTILITIES ALL ELBOWS
N
SWgTLANTq S7 41NCA B SINAL ER TO BE SR INCH RADIUS.ALL BENDS MUST BE FACTORY MADE.
ALL ELBOWS LARGER THAN 4INCH TO BE BO INCH RADIUS.RIGID STEEL OR POE
---- APPROVED.FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF 151 FEET OR LONGER,
T _ 35_ PD-3' OR FOR AN LENGTH RUN WITH MORE THAN 180 DEGREES IN SENDS.PVC SCHEDULE
- __ _ 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR LESS.THE MAXIMUM TOTAL
----- _
AC 1�1 AL'TX TENS -- �- BENDS IN ANY CONDUIT RUN IS 270 DEGREES.
....
-_ ......
ION�32x��X ftECT10NAL BORING REQUIREMENTS:BLACK HDPE(HIGH OENSITV:KIELTHYLENp DUCT
I -- BION: 5 OR it:io LE40,,D"vg HPME CHANICALCONNECTION(CERTA-LOIKEMECHANICAL
Y.�-- AC 10 C(). `.' 1 CONNECTION PRODUCT) AS AN ALTERNATIVE TO HDPE DUCT.HDPE MEET THE
30'-Unknown ....---g•U�'- -��—��i[t` L R n9rr N B OF PGE SPECIFICATION LC20515(AVAILABE ON REQUEST FROM PGE PROJECT
N 60' _ OR SAFETY WHICH I THE DUCT SHALL BE BLACK WITH THREE REL TES SPACE
- - ---- 4 - STRIPES(WHICHIS INSTALLATION WITH PGE .MANDREL TEST OF
,, 3O'-Unkn+Mm 4R'L F;- ------ ----- .QUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT.
CUSTOMER TO EXPOSE EXISTING 2000 ~ma'L.-........ _ s ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET OEM_FROM ANY COMBUSTIBLE
100 -- �Y�^�.- --}�-- BUILDING,WALL OR OVERHANG AND 4 FEET(NAM ROM ANY FIRE HYDRANT.
Q"PVC$SWEEP NEW DUCT --2-ABC C 300 1345 2� --- ALWAYS MAINTAIN IRO FEET CLEARANCE IN FRONT OF ALL
TOWARDS PD-828.LEAVE SPLICEAL VT-3 7.TRANSFORMER PA05 ARE TO BE SE1 90 THAT THE TOP IS 2INGHES ABOVE
C PIT OPEN&PGE TO CONNECT. FINAL GRADE.CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL
C AND TO E%TEND 1 INCH ABOVE THE PPD.
G CUSTOMER TO INTERCEPT EXISTING B. STEELBARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED
D 7805 4"PVC STUB AT PROPERTY CORNER. TO SWITCH V
' 9.Ali SWITCH VAULTS TO BE SET AT FINAL GRADE WITH 61NOC GRAVEL BASE PND
-'I CONDUITS DETAILS TOENTERTTVe ULTENOLOWERKNOCKWTS(WW1-DUCTSI.
9 NOTE: (SEE DETAILS ON SKETCH)
O 25'-Unknown IF EXISTING CONDUIT IS UNUSABLE 10.PGETORENOTIFIED AND INSPECT Auc3ND IT.VALJAVIAI DmSTALLATOE4S
_ - .2001 BEFORE BACKFILL '•SNS TO BE FIEIn VERIFlED
FOR ANY REASON IT IS THE
CUSTOMER'S RESPONSIBILITY TO 11.REFER TO PGE ELECTRICAL SERVICE REQUIREMENTS BOOK FOR FURTHER DETAILS
-I PROVIDE&INSTALL A REPLACEMENT. - ""
BSPECIFIC REQUIREMENTS.LINK TO,•••�•�-
12.TDGMANEOMNDAAUBNDNGOIOD ATQNADENI.OONSTOATAOR
GE WI IHELiN OF IHEn J OMI(0VJtil�W I c,H4E.-
4•TO 577-PGE SWITCH VAULT NSFORMERPAO
PD-31 iti® iiii 'T-°
IT1D ER ED 'MINUS CRUSHED ROCK % ��� THINK
SET AT LOC4710N5 6"DEEP(MIN I j ��Y PGE CONSTRUCTION DRAWING
APPROVEDSIM
ESETIl ROE - O mow: ��R� DATE:2/12/19 SCALE:NTS ACCOUNT:1070001 AWG: 1000004599 JOB NO.M2657533
/ .iiisT.TOP OF UD TQ /oPENluc mrr,o r.N..�"" / rH".'„ FIRST! TITLE
I I '
'11 / °E SET AT FINAL •ra cm
AGiin°oEVED Br PGE.
4 Y Pr w• ®°-.AR TIGARD STORAGE FACILITY/TRAILBLAZER DEVELOPMENT
'� . 3.DO NOT CROSS ON'Ri°-� CIRCUIT SIZE
EXIST 4'a �TS rWEENVAUr,, °"R O WEST PORTLAND-72ND
STUB ` CRO.GOUTS.. ,...m,,,-„wa11x17
P.�STALL500IA oEN^� � �� _ „ PGE LOCATION
4}r IMNM EEST PULL- �'. "T 7805 SW DARTMOUTH,TIGARD
STRING IN EACH ILC.
FRp.r n rAn ANY DEVIATION FROM THIS DESIGN MUST
4"TO BE APPROVED BY PGE PROJECT MANAGER ` DESCRIPTION
PD-828 O F PROVIDE 800A 120/208V 3P UG SERVICE TO STORAGE FACILITY
IIAS.SERWEES PIS FOM *r�TR01R o ;�1® s}g COUNTY SECTION(SI WORK WITH SHEET
NEAREST PRI•SEC CONDUIT ORIAFWAY 2/•SE MIES ARE SET FORD.IN O.952-00,0010Y BEAVERTON WASHINGTON C11-36C 1 of1
3-PHASE TRANSFORMER PAD- Iy Q'�� �1�°
34"MINUS 7 '' Y 411L';w�r�imRLR 1-0 ;r A. UNE CREW CENTER DESIGN BY PHONE(503) DRAWN BY
4'-B" CONDUIT CONFIGURATION mITEx 2213 SW 153RD DR TRAVIS SMALLWOOD 672-5428 CESAR DEL ROSARIO
CRUSHED ROCK (Taw ,
6"DEEP;MIN) Rw"bM1 MM. BEAVERTON.OR 97006
PD-31 ,VSPRIOR TC6ACAwIDN, CM**•••••• 0 PORTLAND GENERAL ELECTRIC CO-ALL RIGHTS RESERVED