Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PFI2019-00090
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 111 a COMMUNITY DEVELOPMENT Permit#: PF12019-00090 T[G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 03/19/2019 Parcel: SEG2400 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: SEG 2400/2398/2465/2513. Install St LT LED Leotek gray light on Alum poles. PGE Job M2587756. Owner: FEES Description Date Amount PFI Permit Fee 03/19/2019 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: RODRIGO TORRES-SOLIS 10800 SW AVERY STREET TUALATIN, OR 97062 PHONE: 503-612-2918 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See. G4 ppli all Pt-- Issued By: ATAM e1( Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00090 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED City of Tigard MAR 18 2019 II PUBLIC WORKS — ENGINEERING UPI E CITY OF TIGARD Public Facility Improvement PFI) Pe 'ir ERING TIGARD TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) TYPE i–Franchise Utility Work Check one: clUtilities ❑ Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE Detailed description: Install ST LT LED Leotek gray light on Alum poles and/or utility agency. ❑ TYPE 2–Sidewalk/Driveway/Sewer Work performed for the purpose of: PGE Job M2587756 • Sidewalk installation or repair. 9000 SW DURHAM RD,TIGARD, OR 97224 • Driveway approach installation Property address/location(s): and/or repair S 2MO0f 2381 24 1 2.513 • Sanitary sewer lateral installation and/or main line tap Portland General Electric(submitted by ❑ TYPE 3–Full scale Development Applicant: Nance Stone Work performed with Land use Address: 10800 SW Avery Street approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-612-2918 Email: prereqcoord@pgn.com • Subdivisions or Partitions Contact name: Rodrigo Torres Solis Phone: 503-672-5417 • Street widening • Mainline installation for Sanitary Contractor: Portland General Contractor sewer, Storm sewer, Tigard water and/or Tigard Water Service Area CCB#: Expiration: Address: SUBMIT COMPLETED APPLICATION TO: City/state: Zip: City of Tigard Planning/Engineering Phone: Email: 13125 SW Hall Blvd. Contact name: Phone: Tigard,OR 97223 Applications for"minor work in right-of-way" only may be emailed to: Engineer: rowpermits@tigard-or.gov Address: 1oIt S"I':11I 1 SI: O\I.\ City/state: Zip: p Phone: Email: Case No.: T F Zot i-O0o Q Contact name: Application submittal fee (.007%of Engineer's Estimate) $ Estimated value of work is required(if over$5,000):$ Additional fees: $ 300 (within the public right-of-way) Application accepted: By: Date:, f lg\1.45\ Is work related to a LAND-USE DECISION? ❑ Yes V No Application reviewed: If so,please specify (MLP,SDR, SUB, etc.) case #: Q Q By: 615 Date: I I Is work related to a BUILDING PERMIT? ❑ Yes L No Applicant notified: If so,please specify(BUILDING PERMIT)case#: By: tiL Date: 1114q ( 01 I:\ENG\PermitApplications\pfi_application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of4 APPLICANTS NOTE: Person specified as "Applicant" shall be designated "Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s) must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. ),ret4 - Aroun Xaybanha 03/15/2019 Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.figard-or.gov • 503-718-2421 • Page 2 of DEVELOPMENT ENGINEERING FEES FOR STAFF LSE ONLY Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL REQUIREMENTS APPLICATION FEE Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5% (less$300.00 minimum submittal fee) Sketch (including information below) Engineer's estimate X 2%Plan Review ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) Cl Details Note: A cash/bond assurance may be ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat Cl Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of SAMPLE SKETCH: ci) s1- • • I Edge of F avement ' '__ Ditch —II- --tb,c, Streetlight _ .------------- - —•— .*vr biX Jr-esRDrain y tir; � iii �' Pt ® >: , ~r, _ .,r-',ta>:- �i p +a II Tl roppos�d'SeWe—CTI'e" I0). Existing House • -c; 1 Existing I "' ?I • Driveway i: I I I CI '1 ' r 2 E0I ci_, ef/'T. �I 1 �I 92 I 0.." I L 1 I ' I �. I Existing Shop I I ,-L- \ ,,f PowerpoleII a 1' ri- 951 I II --------157opertpLni e----------- I 1 1 ir.IN I I Fire Hydrant(FH) i I I 1 Scale: 1"=30' I I I . I . I MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable): North arrow Property lines &dimension Slope of property Street & street name(s) Existing building, structures Utility& street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of FMR R N i.1. 1990� r ` -A 2 AL ocn l, 9( C 2 AL ABC 2/O AL 1990 LIGHTING LEGEND 2 Feeders Q AABBCC 750 AL (UNLESS OTHERWISE SPECIFIED) N 2405 m R R ♦R EI E P uSTALL TM-. ST LT CIRCUIT IN H40 PVC 45-4 CO C1 CONDUIT,MOON A INSTILLED 83 CJ'5TOMER 51000 INSTALL RP 1•CU-TX ST LT CIRCUIT IN I- SS04/10 PVC 1982 ,-,,.3-143 65 T F CONDUIT,PROVIDED 6 INSTALLED BY CUSTOMER PL-SOy�( ZII PU_SI 4., 'I' T PGE TO REPLACE 1-N6 ON ST LT CIRCUIT___�- r•y lPc, ...._..._.-......_-�_ -.. PL 52 *;I. PL-SJ 411 Tp• PL_Sd WITH I-2 OH TX Si Li CIRCUIT VT-40 O 165' - ( _ ___ TO' ♦ I60' ND' - 'Oil- Q CUSTOMER INSTALLED 1730 SECONDARY VAULT ... VT-43 VT-44 INSTALL 88W LED IEOTEK GRAY LIGHT ON 30' ALUMINUM POLE.WITH 6'MAST ARM(30'4H) • 4 SET T FP-FC,CONNECT 240 VOLTS TFC 1,r.-39 INSTALL 47W LED GREE BRONZE LIGHT ON 20' 30'TEC FG BRONZE POLE WITH 8'MAST ARM A (25'MN)SET 2'FP-FC,CONNECT 240 VOLTS '"" PD-7375. NOTE: 100' PGE TO PROVIDE BOTTOM PIECE OF POLE FOR CUSTOMER TO INSTALL AT THE SAME TIME AS THE CONDUIT. INSTALL 30AMP FUSES IN SECONDARY PEDESTALS OR SECONDARY VAULTS(WHICHEVER 0 ST LT POINT OF ATTACHMENTS FOR EACH PLJ�B,iL� STREET LIGHT PER POE TAD CONSTRUCTION STANDARD LC_H550 A 2 AL Ay:n yr-3e TOS' ANY DEVIATION FROM THIS DESIGN MUST • BE APPROVED BY PGE PROJECT MANAGER 125' ( 1 14267 6.-. , :. '3110 3n17 GS 40'-4 o RI 1969 U R Cl C21-14A z 2 co OOR 3 9(700 h 921' 20' CONSTRUCTION NOTES: SLCST I.CUSTOMER TO PROVIDE ALL TRENCHING.BACKFILLING,CONDUIT,ELBOWS.JUNCTION I 43 ELCHES DEEP AND 15INCHES DIVE.iN BUREDTFROM FINAL GRADEBE 115 APGT1111ABOD%ES RNO IEWNMMFFAC&JT 9NIMLLUDINGECONNEDCTgNV /113ALLATION 2 a CONg11T3 ANL1 PULL STRINGS.CALL SERVICE COORDINATION AT 503-J23ET00 • TO SCHEDULAPGES)'REI LREw. 1 3.ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,(SCHEDULE 40,ELECTRICAL RADE,OE TO PVC CONDUIT O EITH+ETHNYLO PULLSTRINGS OFGSNOUIN.ED LEIS TEST) 2 PIECE FIBERGLASS(COMPOSITE)POLE LAMP POLE FOOTING 1 MAINTNN I2 VERTICAL INCHE ALL ELBOWS 4INCHTAL INCHES CLEARANCE BETWEEN � GAS AND OTHER UNITIES ALL ELBOWS 4INCH 6 SMALLER TO REQUIRED. E J6INCH RADIUS. �;I IN N°' No,SCL-LB(750(6) RIGID STEEL OR POEAPPROVEDRBERGLASSSENDSAREREQUIREDFORRUNSOP nwa 151 FEET OR LONGER OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES I AL----, VT35 3"'* III T sH HEN rn"i IN BENDS PVC SCHEOULEb BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR g I ESS.TE MAXIMUM TOTAL BENDS IN AVIV CONDUIT RUN IS PO DEGREES.ALL I-45 0 �� TM KENOS MUST BE FACTORY MADE.REFER TO LETTER OF RESPONSIB LItt FOR 329 P I p.-17 II' i 1 FURTHER DETAILS. I©-4 INSTALL 3"POLE CONDUIT Naw 1,..r 1 RETEFOOTINGSNEED TO BE INSTALLED WITH TOP OF BASE -1994 'I' FLusl°io coca lsroEWALx. UNIT WITH T2'BRACKETS 5.CUSTOMERRESPON810LEFpFE OAD CROSSINGS.ALLGROBSINGSMUBTETr \\y liii� N.....- ' / FMREASUF PRRTM FINALTGRMRTV LINE.CROSSINGS TO BE dB MCIE9 DEEP -B CK HDPE(HIGH DENSITY POLVETHnENO DUCT ,J�\ ICALCONNECTON ICERTAIOKOR LIKEMECHANIGIL %L 1 ALTERNATIVE TO HDPE DUCT HDPE SHALL MEET THE 1 NI 11.1r e ON LC20515 f AVA CABLE ON REQUEST FROM PGE PROJECT .33 SEW E REASONS HE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE H eA... MMIF REDS RIDES( HIGH 5 S ECFICATONREOUIREMEry� EANDRELTESTOF TOP) RN r . _ EPIPE SREOU REO AFTER INSTALLATION WITH PGE NSPECTOR FR SENT. 1 14340 T i,f , SRM+ �V Rrr..n ..., � Sy....... .w MSHw �ve T.TRANSFORMER PADS ARE TO BE SET SD THAT THE TOP ISZIHCNES ABOVE ACts AI.. ��iH ��r oco+n'Nou e•r ew... F LORAOE ,,, RTOBEBL3TALL TMPADASINDICATEDINDETNL 2407 -- -. O.n DTO EXTELGE INCH ABOVE THE PAD. 40'_4 ¢ lDTIOM PIECE POLE INSTALLATION D,,,,�, N.... LPGETRANSFORMCES TO BE INSTALLED 6 FEET( ro COMBUSTIBLE f 1y. a BUILDING,WALL OR OVERHANG Afro 1 FEET(MM FROM ANY FIRE HYDRANT. I. :�.,LOaa N..*Ay rwP e.w,n T m GE TRANSTORMERS MUST BE WITMN IS FEET T A DOMELL'IR LE AREA 1969 U 23 n...Ia ,AF,♦,,,,I tiAr 3u.r ALWAYS MAINTAIN IO FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. N30' nkncwn �� ."' P✓nepn',F� 9. STEELBARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED _,,,_ z 9 - ovEMa£s. 0 44Y T, ,��R Re 1�}1 x I^5'I[Mor N IR.omLam - 10.v NEEOEOfROM LOT PUBLIC UTILITY EASEMENT I P.U.E) TO BE 5 FEET(MIN, sew O FEEL IPREFERREq L I 11. NICUWITHPGEREPRESTROTIOZ WEEKSENCE,INCLUDE I THIPOWER TRENCHING FOR A PRECONSTRUCTION CONFERENCE. LUDED IN THIS CONFERENCE JUNCTION BOX INSTALLATIONS WRL SE EXCAVATOR.POE.TELCO.CAN.AND OAS. GROUND ROD INSTALLATION STREET SIDE FOR STREET LIGHTING FOR METAL STREETL/GHT POLES CONTACT PGE FOR APPROVED MANUFACTURERS • TOP STREET LIGHT FOOTING OPT.A NEW `_ IMImaReRLE(PMIeO REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC REQUIREMENTS• . . PRIM MAORI "COILED AT TOP OF GROUND ROD LOCATION FNMBIAOERSOFINAFAOE THINK IS DESIGN 58ASED OIJ STANDARD UNDERGROUND EOUNMENi.NONSTMDAR0055ER- 1 FOOTING FOR PGE FICiD SIDE SROUND EQUIPMENT MAV BEAN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER. lLOTENN ,,.....,...•••=4,111:'MPli0 SAFETY E FINAL ORME NOTES:(POE TO PROTIDE GROUND ROD R .,.r FIELD SIDE - COPPER LOIRE CUSTOMER TO INSTALL) mar PnE FIRST! A PGE CONSTRUCTION DRAWING . k RAauReeBRIRY CONTACT SERVICE COORDINATOR DTT'iL9A8 SwE:NTS IACCDDNT:1070001 IAwD:I000001600 Iroa No.M158n56 I.THE GROUND ROD 6 AEAHG BSD CU MUST RE PAM' INSTALLED DURING SI REE r LIGNTFOOTING •I ooTlrvG INSTA[urigV 1� To on ONAL ST LT voLE 'PROF c - 71GARD SCHOOL DIST 23J HIGH SCHOOL/CRY OF TIGARD r' 1.THE GROUND ROO M(JBTBERVSTALLED RV ,'C SERVICE OR 800-NAE OR OKun E B'GALVANIZED UNTHEGROUNDSOXROO MUSTB LEAST YBELDY SW 323-61(Xr 800.542 8 5(SALEIw DURHMtiSAT/LER $1 17X02 SIB'GROUND ROD CDED40 FGWL GRADE,GER NESCYLSC APPROVED BY PGE SCTI AO GREY NC FACTORY� EINM 1MDEOS ATTENTION: CALL BIT BEFORE YOU DIG PGE LWCATAN WTJB"SWEEP A • CUSTOMER TO CDL 3'OF COPPER HME OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED 9000 SW DURHAM RD AROUND TOP OF GROUPED ROD.POE 11111 ALWE BY THE OREGON SET F'NOTIFICATION 2EVILER. �� \'‘. DESCRIPTION Mshll W AL-TX ST LT Circ.,in I-3-to 5-88 LED FINAL CONNECTIONS THOSE RULES ARE SET FORT IN OAR -0010 LeoleR grey light on 30'Alum poles with 6'RAA Sir MINUS RACI,FILl X AWG BSD CU d.BW✓OMG 0 CON0MPLISF(GREEN CONDUCTOR) TROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF /. WASHINGTON COUNTY 021-14 i) WORD WITH ONIUiH� TENE(/RRAL CONDUCTOR CONDUCTOIp ARGUE/MD �X THE RULES BY CALLING THE OREGON UTHITY � rl M SC21-i/A s EET :1/171'f.°70" 'IOU TO THE GROUNDING CAVOI/CTOR NEAR T£ NOTIflGiION[EVILER AWA ® (50}232-198)) OW Clow�nnw wENTER ONION Sr 072-5417SOS) 1 of POLE GROUNDING TAR (.ARES CALL THE I`s DRAWN ay • 'CENTER 811,. Knew wives below' RODRIGO SOUS CESAR DEL ROSARIO Call before you dig- 0 PORTLAND GENERAL ELECTRIC co.-ALL RIGHTS RESERVED a Page 84 2011 Edition N Stationary Lane Closure with Flagging Diagram 320 J Diagram 320 covers total closure of one lane of a two-lane, two-way N roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4) should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the "Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 December 2011 2011 Edition Page 85 N N Stationary Lane Closure with Flagging Diagram 320 N Co C r3zdp W V a 0 oma " L c) m c co W a $4 I t ma° m 3 a0 8a ... I. oA • i 484 ' • p— .c> m m" i D. ego 41* A1 1 m • mA_ I � l;:1 dF— • C .g. (0 k _ X41 r '. • lb _i_ I y., . _ p p12 �.,.. I v w°Cd� 1 1 ,� m mcco m 4 v Sign Spacing and Buffer Lengths(feet) t w c Posted Spacing Between Signs Buffer (3 p W Speed A B C Space T 0 O� 20 50 25 100 100 100 75 30 100 125 Y 40 350 350 350 150 0 0 45 180 Q 50 500 500 500 210 55 250 December 2011 Chapter 5 Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths (feet) .15 Posted Spacing Between Signs Buffer Speed A B C Space 20 50 25 100 100 100 75 30 100 40 350 350 350 150 45 180 50 500 500 500 210_ 55 250 Chapter 5 December 2011 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 ROAD WORK AHEAD C (Opdonai) •ROAD 1 1 AHEAD B BE PREP '.• TO STOP B A (opdonal) ROAD 1001L Max. •• 10 BE . PREP .z• ROAD • • WORT( TO STOP AHEAD I A B B C I Buffer • .jam ~ • •.• ~ N -- 0.• • • j�.4 10 • co 1008 Max.-•H I C B B A • T ROAD BE 1 WORK PREP - 1 • AHEAD TO STOP • 100 ft.Max. •ROAD • AHEAD • (Opal) don AiiAil>B BE PREPARED TO STOP B (Opdonal) 0E 1 1C ROAD AHEAD ROAD WORK AHEAD December 2011 Chapter 5