Loading...
PFI2019-00086 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12019-00086 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 03/19/2019 TIGARD Parcel: SEG677 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: SEG 677/11600 SW 98th Ave. UG Service to 8 Lot subdivision. PGE Job M2485267 Owner: FEES Description Date Amount PHONE: Contractor: REVCON INC 21420 NW NICHOLAS CT HILLSBORO, OR 97124 PHONE: 503-848-7300 FAX: 503-356-5599 Applicant: JOSE MARQUEZ 10800 SW AVERY STREET TUALATIN, OR 97062 PHONE: 503-612-2918 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: f.{.( L� Issued By: tiA/f) Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00086 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED MAR 14 2019 City ofTigard CITY OF TIGARD IIM PUBLIC WORKS —ENGINEERING PLANNING/ENGINEERING s Public FacilityImprovement PFI Permit TIGARD TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) ❑ TYPE 1—Franchise Utility Work Check one: 1Utilities ❑ Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE Detailed description: UG SERVICE TO 8 LOT SUBDIVISION and/or utility agency. LI TYPE 2—Sidewalk/Driveway/Sewer PGE Job M2485267 Work performed for the purpose of: • Sidewalk installation or repair. 11600 SW 98TH AVE Property address/location(s): • Driveway approach installation and/or repair CP-11 TIGARD, OR 97223 • Sanitary sewer lateral installation � and/or main line tap Applicant: PGE (Submitted by Nance Stone) TYPE 3—Full scale Development 10800 SW Street Work performed with Land use Address: Avery approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-612-2918 Email: preregcoord@pgn.com • Subdivisions or Partitions Contact name: Jose Marquez Phone: 503-672-5452 • Street widening • Mainline installation for Sanitary Contractor: Revcon sewer, Storm sewer, Tigard water and/or Tigard Water Service Area CCB#: 160417 Expiration: Address: 16655 SW Ivy Glenn St SUBMIT COMPLETED APPLICATION TO: City/state: Beaverton, OR Zip: 97007 City of Tigard Planning/Engineering Phone: Email: 13125 SW Hall Blvd. Contact name: Troy Sandstrom Phone: 503-936-6300 Tigard,OR 97223 Applications for"minor work in right-of-way" only may be emailed to: Engineer: rowpermits@tigard-or.gov Address: FOR STAFF t SI: O\I.1 City/state: Zip: Phone: Email: Case No.: Pi 2- -0WeLP Contact name: Application submittal fee(.007%of Engineer's Estimate) $ -k Estimated value of work is required(if over$5,000):$ Additional fees: $ (within the public right-of-way) Application accepted: u By: Date: 31(9 I 11 Is work related to a LAND-USE DECISION. ❑ Yes V No If so,please specify (MLP,SDR,SUB, etc.) case #: Applicati leveed: VNo By: Date: 4� / Is work related to a BUILDING PERMIT? El Yes App cant otified: If so,please specify(BUILDING PERMIT)case#: By: Date: 0.1..ltr I:\ENG\PermitApplications\pfi_application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. Steve Hursh 3/13/2019 Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property,if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City 0/Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of DEVELOPMENT ENGINEERING FEES F O R STAFF U S L ONLY Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL REQUIREMENTS APPLICATION FEE Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch Engineer's estimate X 2%Plan Review (including information below) ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance may be 0 Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of SAMPLE SKETCH: f) 5;w 4_ '• s l Edge of P avement 1:6100 I Ditch �w Streetlight _ {�-.—.—.—.—.—•—.r I —r—.— Iii, .'f • Rsai Drain lr"W 1... ' T'i7rr iUreccl''S�nnre rTing-- 1 I 61 1 Existing House i � Existing I aI 1 g 1 y. >r . Driveway �1 r 1 CI , r 1 ' of /ibi �I -� 1 a. o_I vie 1 ill Cla A I I '1 �. 0 1 Existing Shop i'r I L ,- .' \ 1 Powerpole 1 I I ; 1 95' 1 I R----------7.1)-ay7053--------"2"""""""" I I I i 0 Fire Hydrant(FH) o I 1 I Scale: 1-=30' I I I ! I 1 I ■ ' 1 MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable): North arrow Property lines &dimension Slope of property Street &street name(s) Existing building, structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) i.'SL..=.:y_ wa.:::w.., .,..r,,,.... 'i. '::'•, ,-,-".;M.i r :.::::� x.' -- .:.- .... �P-,"-_... ...;:A39Pv8..: ..�- _ _+�" .- -. .yIINSY!6' ai�.E�=!ilii.-:. s:: PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of SUBDIVISION LEGEND INSTALL 2'POLE CONDUIT UNIT ON EXISTING BRACKETS WITH NEW PGE FACILITIES TO BE INSTALLED v SHUT DOWN REQUIRED t42 GO 40 T (UNLESS OTHERWISE SPECIFIED) ON POLE 4604 TO CHANGE K EXISTING CUTOUT TO °46' POLYMER B!• INSTALL FACILITIES 169 O 1 �� 644-PGE PADMOUNT VAULT.WITH 64-332P-2125 PGE TOP B 26 1141'1\4142 40 T ED PROVIDED 8 INSTALLED BY CUSTOMER �l• -'TNDUIT (3 FAULT INDICATOR •` maik, pL-4604 % INSTALL CUTOUT SIZE FUSING AS NOTED O PF 300 SECONDARY PEDESTAL. PROVIDED BY PGE A INSTALLED BY CUSTOMER 1 2 120240V 3 4 ____ __.INSTALL 1-02 AL-EPR JKT PRIMARY IN 1-2"PVC CONDUIT 200AMP 6 6 T B PROVIDED A INSTALLED BY CUSTOMER 3.44%VD I.93%FLKR -INSTALL 141350 AL-TX SECONDARY IN 1.3"PVC CONDUIT 7,560AFC PROVIDED A INSTALLED BY CUSTOMER 120240V B 50 200AMP CUSTOMER TO INSTALL 3"PVC CONDUIT&STUB-UP 557 3.44%VD FOR FUTURE 1-410 AL-TX SERVICE VI 147 PO O I.03%FLKR • 5i5' --�5- 90 VT 148 7,905A AFC �� 190 V149 260' VT 154 DO WITH SLCST WO#M2485273 T., N17E' 3 Ln METERED CONSTRUCTION NOTES: RSDEV v LIGHTING CONTROLLER PR/VA TE ROAD EXISTING PGE OH B PHASE C1I35C m i 7,200 VOLT 1.CUSTOMER TO PROVIDE ALL TRENCHING AND BACKFILLING.JOINT USE TRENCH WITH GAS,TRENCH TO BE 48 INCHES DEEP AND 301NCHES WIDE,MEASURED FROM FINAL GRADE. 2.A POE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED POE VAULTS OFJCONDUIITSTION BOXES ANDULL STRINGS.CALLIUTIES INCLUDING$ERVICE COORDINATION ACONNECTION 50-3-323-88700 ATION TO SCHEDULE A PGE STANDBY CREW. 3.ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY.SCHEDULE 40,ELECTRICAL GRADE,PVC CONDUIT WITH NYLON PULL STRINGS I MIN.500 LBS.TEST). PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED, MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN GAS AND OTHER CTALL _AL SMALLER RADIUS.DIU3. ALL BENDS MUST E FACORY MADEEL OWS LARGER THAN 4 INCH TO 60 INCH 6661 FOR RUNS OF RADIGID IUS. OR LONGER,OR FOROR PGE OANYY LENGTH RUNS BENDS OARRE T REQUIRED 4014 180 DEGREES IN BENDS.PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF 2001 150 FEET OR LESS.THE MAXIMUM TOTAL ENDS IN ANY CONDUIT RUN IS 270 DEGREES B 26 74441 1 4.CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS.ALL CROSSINGS MUST EXTEND FROM PROPERTY LINE TO PROPERTY LINE.USE ONLY GRAY SCHEDULE 40, 14870 .a ELECTRICAL GRADE,PVC CONDUIT.CROSSINGS TO BE 48 INCHES DEEP.MEASURED 142 25 T 40..3 FROM FINAL GRADE. 2006 5.DIRECTIONAL BAtaNGvc REQUIREMENTSI SLACK HDPE I HIGH DENSITY POLYETHYLENE) DUCT S SCOT CT 14871 CO OR PVC WITH A AN MECHANICAL CONNECTION HO ON(CT.HOPE LIKE MECHANICAL US-I CONNECTIONEQIREMES OF PGE ASIALTERNATIVE 5 HOPE ABLE.HDPE SHALL MOOT THE F REQUIREMENTS OF PGE SPECIFICATION LC2051 S I AVAILABLE ON REQUEST FROM PGE PROJEC 1976 MANAGER.FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE EXTRUDED RED STRIPES f WHICH IS A SPECIFICATION REQUIREMENT) MANDREL TEST OF Q SwLRlTMAyE HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPFC TOR PRESENT F. RFL 2 ACSR S.CUSTOMER TO PROVIDE AND INSTALLPOE VAULT WITH e84-332P"2125 COVER, FOR UTILRY VAULT MODEL OR EQUIVALENT FOR POE PAD MOUNT TRANSFORMERS. PADNAULT TOE SET AT FINAL GRADE(SEE DETAIL ON SKETCH). 7.ALL PGE TRANSFORMERS TONE INSTALLED a FEET an FROM ANY COMBUSTIBLE BUILDING,WALL OR OVERHANG AND 4 FEET(MIM ANL FIRE AYDRANT. PGE TRANSFORMERS MUST BE WITHIN ANC 15 FEET OF A DRIVEABLE TFU AREM ALWAYS MAINTNN 70 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. 8.STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED 70 VEHICLES. 9.ALL SWITCH IGNE S TO E$ETH FINAL GRADE WITH 8 INCH GRAVEL 711r4-AATUCTS1 CONDOR$ALIGNED TO ENTERTHE VAULTENDLOWER KNOCKOUTS( (SEE DETNI ON SKETCIO 10.FRONT LOT PUBLIC UTILITY EASEMENT(P.U.E) TO BE 8 FEET(MRO 10 FEET!PREFRRED) 11.ESTIMATED AMPS MOTOR STARTING CURRENT FOR FLICKER CALCULATION$. TRANSFORMER LOADING AND VOLTAGE DROP CALCUUTIONS BASED ON KW pD-57 B PHASE PER RESIDENCE. 12.CONSUL]WITH PGE REPRESENTATIVE 2 WEEK$BEFORE STARTING MAIN POWER WILL BE EXCAVATOR. VA A R.PGO.TELCO,CATV,ANFERENCE.INCLUDED IN TNI$CONFERENCE INSTALL. WILL BE EXCAVATOR,PGE, CAN,ANO GAS. O 13.DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT NONSTANDARD 1P 7.2 2401120 PM 50 KVA NTLB UNDERGROUND ERUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST ON 644-PGE PAD MOUNT VAULT 8 CUSTOMERS LOAD 30 KW RE..Mtr t. l°- Fl.1104 ANY DEVIATION FROM THIS DESIGN MUST RIGHT-OF-WAY PERMIT NOTICE: BE APPROVED BY PGE PROJECT MANAGER ap.il LEGEND 11,1441A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY r / T�.H1a 0 Gag UM.. WORK IN THE RIGHT-OF-wAY MAY BE PERFORMED. ONLY PGE APPROVED PGE FACILITIES NOT DRAWN TO SCALE •" TYAIR4Rr, CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL j TMiwmR =am, Wilde 000O+'' AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER POE'S PERMIT. THIS DRAWING IS A GRAPHICAL REPRESENTATION OF PORTLAND GENERAL THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS ELECTRIC FACILITIES IN THE FIELD.THIS MAP ILLUSTRATES ELECTRICAL e Tek,CAT( RM..... THE WORK IS TO BEGIN.A COPY Of THE PERMIT MUST BE ON SITE. CONNECTIVITY,TYPES AND NUMBERS OF CONDUCTORS AND PLACEMENT OF 6x4x4 VAULT WITH 3"TERM)-DUCTS �RB�% WRRANSFORMEREQUIPMENT WITHIN THE DISTRIBUTION SYSTEM.IT IS RECOMMENDED THAT OPENING N TRANSFORMER PAD MUST FACE C. I 1 NNn R..MM THE USER NOT RELY ON THIS DIAGRAM FOR GEOGRAPHICAL LOCATIONS STREET SIDE OR PARRMG AREA17 el0110,Z,Z:',, ERBUCT M cIER PRO FROM ANY BACH sFMLE r� R_ 1t sa' I VM" POE CONSTRUCTION DRAWING STRI/CJVRE IS 8'FROM SIDES AND eACR OFYAULT WITH Kt'CLEAR SPACE IN FROM J•IN Ll.e MWies Tn..AOF VAULT AS—BUILT VERIFICATION & NESC VIOLATIONS CORRECTED NNAL GRADE WHEN CLOSER THINK This document Dcw R Ip represents FIELD eDnst ECI Dn. THAN 2'TO A HARD SURFACE PF300 SECONDARY SPUCE PEDESTAL _ �.m" SAFETY Farcman: : FINAL GRADE WHEN INR T .?�K� .railreonnrrFIRST! General Foreman: Date: / IANoscAPE ARIA (- ..`,`. `��� safeLl l r_\I (Signature only required for field construction changes.) i,�..... ` SDPMENG REVIEW: IASBUILT BY DESIGNER: "i DA E. STAN AccoLJN7: Awo. oe No p° CONTACT SERVICE COORDINATOR 2/11,2019 NTS I 1070001 I 1000004596 N M2465267 PROW/ �, �e M,‘7.,":7.4 AD \ fORORe KEILL ENCH 0 C011WNOir T INSTALL WIPEVION PE O r LE DIRCIS BIorN ltOfl A I" 'k �I�F :anl-•eo!,m1.ueRF1uE0 q` SAGE BUILT HOMES UC/CANYON COURT Net, O0 8C. xnne.w ."iLZ.— )5 SERVICE COORDINATOR I./ \- CIRCUIT SIZE SIDE Cr ` IB ', 503 323 6700 OR 800-542-RRI6(SALEM) PROGRESS-GREENBURG 17x22 U f�_,.MOW iia l 1kSoCALL 811 BEFORE YOU DIG PGE /I LOCATION — /�eO0 � - ` O 11600 SW 98TH AVE TIGARD OR 97223 (PRIMARY-FIELD SIDE ON!t ATTENTION: �x - — L, _ OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED \% BY THE OREGON UTILITY NOTIF/CATION CENTER. DESCRIPTION FL"MINUS CRUSHED ROLE" �' e1O I ¢ 0-Y' THOSE RULES ARE SET FORTH IN OAR 952-001-0010 SHUTDOWN REGD.INST UG SERVICE TO 8 LOT SUBDIVISION 6"DEEP(MINI TAS. 4, 5..E • - SO THROUGH 9S2-00I-0090,YOU MAY OBTAIN COPIES OF ROCK WITH SHEET / THE RULES BY CALLING THE OREGON LITRJTY Y0'� 1FAVERTON WASHINGTON SECTION(S) C(SJ M2485273 1 of I 0)540 Ka3114.ID,,ez,g.me.us 11 SRI s-20)01 1Z NOTIFICATKN)CENTER ADMINISTRATION Q 1503-232-19671 UNE CREW GENIE! pESIGN e1, PHONE 15031 Mom e1, RiNortDNortD ON OW DOWN COST FOE IMC RROCOIO4S 1*NMTN:NTS OF RIDOAO WILL TO REQUEST UTILITY LOCATES CALL THE OREGON ::n sW nim De DINA WALLACE 672-5478 SU)ATHA NARAYANAN 3"CONt11 T UNAID ICO Ill a 18410 0.0 n OS NS u.TSGRAM ANIWO D scsrssn rem.u se oe010N* UTILITY NOTIFICATION CENTER,810 AT LEAST Knew*hers below. N, ,OR,� ,,COFLDARY-STREET SOF ONLY De Ne AMEN 2 BUSINESS DAYS PRIOR TO EXCAVATION. CQII Were you dig. O PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control N both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4)should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 September 2016 2011 Edition Page 85 N Stationary Lane Closure with Flagging Diagram 320 SDN \ v \OO6 \ C 0 w a) c 9 Q a) o o2 0 m Chm rn as w a\0 * 1 T al /— i" °3 m d O * i I— • m03 1. A •11' :c R,- CL O • 44* -11A 4 t o4ATl EE l a a§A f- 3 I .. IF • >a • i CO o-E • II • I% • L O. 0g. •• H \-7. ;1=T /4. /0 i v.d / / w,r a , LLI< �' 4 1 � CO iLrb U) 1� �CC a Y _ 4 , fm Sign Spacing and Buffer Lengths(feet) M • i,,,,_, /.,._..„u, _-a Posted Spacing Between Signs "Buffer” U —\\ p C Speed A B C Space Q O el 20 50 Z2 /O 25 100 100 100 75 O , � 30 100 .\ 35 125 350 350 350 40 150 Q 2 45 180 Q 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 September 2016 Chapter 5