PFI2019-00086 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12019-00086
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 03/19/2019
TIGARD Parcel: SEG677
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: SEG 677/11600 SW 98th Ave. UG Service to 8 Lot subdivision. PGE Job M2485267
Owner: FEES
Description Date Amount
PHONE:
Contractor:
REVCON INC
21420 NW NICHOLAS CT
HILLSBORO, OR 97124
PHONE: 503-848-7300
FAX: 503-356-5599
Applicant:
JOSE MARQUEZ
10800 SW AVERY STREET
TUALATIN, OR 97062
PHONE: 503-612-2918
Total $0.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: f.{.( L�
Issued By: tiA/f)
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00086
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
RECEIVED
MAR 14 2019
City ofTigard CITY OF TIGARD
IIM PUBLIC WORKS —ENGINEERING PLANNING/ENGINEERING
s
Public FacilityImprovement PFI Permit
TIGARD
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way)
❑ TYPE 1—Franchise Utility Work
Check one: 1Utilities ❑ Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE
Detailed description:
UG SERVICE TO 8 LOT SUBDIVISION and/or utility agency.
LI TYPE 2—Sidewalk/Driveway/Sewer
PGE Job M2485267 Work performed for the purpose of:
• Sidewalk installation or repair.
11600 SW 98TH AVE
Property address/location(s): • Driveway approach installation
and/or repair
CP-11 TIGARD, OR 97223 • Sanitary sewer lateral installation
� and/or main line tap
Applicant: PGE (Submitted by Nance Stone) TYPE 3—Full scale Development
10800 SW Street Work performed with Land use
Address: Avery approval which includes any of
City/state: Tualatin, OR Zip: 97062 the following:
Phone: 503-612-2918 Email: preregcoord@pgn.com • Subdivisions or Partitions
Contact name: Jose Marquez Phone: 503-672-5452 • Street widening
• Mainline installation for Sanitary
Contractor: Revcon sewer, Storm sewer, Tigard water
and/or Tigard Water Service Area
CCB#: 160417 Expiration:
Address: 16655 SW Ivy Glenn St SUBMIT COMPLETED APPLICATION TO:
City/state: Beaverton, OR Zip: 97007 City of Tigard
Planning/Engineering
Phone: Email: 13125 SW Hall Blvd.
Contact name: Troy Sandstrom Phone: 503-936-6300 Tigard,OR 97223
Applications for"minor work in right-of-way"
only may be emailed to:
Engineer: rowpermits@tigard-or.gov
Address:
FOR STAFF t SI: O\I.1
City/state: Zip:
Phone: Email: Case No.: Pi 2- -0WeLP
Contact name: Application submittal fee(.007%of
Engineer's Estimate) $ -k
Estimated value of work is required(if over$5,000):$ Additional fees: $
(within the public right-of-way) Application accepted: u
By: Date: 31(9 I 11
Is work related to a LAND-USE DECISION. ❑ Yes V No
If so,please specify (MLP,SDR,SUB, etc.) case #: Applicati leveed:
VNo
By: Date: 4� /
Is work related to a BUILDING PERMIT? El Yes App cant otified:
If so,please specify(BUILDING PERMIT)case#: By: Date:
0.1..ltr
I:\ENG\PermitApplications\pfi_application Rev.10/16/2017
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if
required by the city pursuant to TMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owner's signature on the application
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
property.
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
Steve Hursh 3/13/2019
Applicant/Authorized Agent's signature Print name Date
SIGNATURES of each owner of the subject property,if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City 0/Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of
DEVELOPMENT ENGINEERING FEES F O R STAFF U S L ONLY
Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL
REQUIREMENTS
APPLICATION FEE
Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/
DRIVEWAY AND UTILITY
PERMIT FEE CONNECTIONS,ETC.
Part 2: All non-water system improvements (work in the right of way)
Engineer's estimate X 5%(less$300.00 minimum
submittal fee) Sketch
Engineer's estimate X 2%Plan Review (including information below)
❑ Dimensions
WATER SYSTEM FEE ❑ Street Name
Part 3: All public water system improvements ❑ Site Address
Engineer's estimate X 12%
FULL SCALE DEVELOPMENT
PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements)
There will be no permit fee charged,or assurance required
for the following types of work: Design Plans
• Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34)
• Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend
• Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.)
• Weep hole repair ❑ Street(Plan,Profile)
• Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile)
• Lawn sprinkler system installation or repair ❑ Water Quality Facilities
• Street tree pruning or planting ❑ Grading
• Planter strip landscape maintenance ❑ Landscaping/Tree Plan
• Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas,
Storm,Sanitary,Water,Signage,Street Lights,etc)
❑ Details
Note: A cash/bond assurance may be 0 Traffic Sight Distance
required per TMC 15.04.140. ❑ Signing and Striping
(customer deposit) ❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design(if applicable)
❑ Water Department Approval
❑ Engineer's Construction Estimate
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of
SAMPLE SKETCH:
f) 5;w 4_ '• s l
Edge of P avement
1:6100 I Ditch �w
Streetlight _ {�-.—.—.—.—.—•—.r
I
—r—.—
Iii, .'f
• Rsai Drain lr"W
1...
' T'i7rr iUreccl''S�nnre rTing-- 1
I 61 1 Existing House i
� Existing
I aI 1 g 1
y. >r . Driveway
�1 r 1
CI , r 1 '
of /ibi
�I -� 1
a.
o_I vie 1
ill Cla A I I
'1
�. 0 1 Existing Shop
i'r
I L ,- .' \
1
Powerpole 1 I I ; 1
95' 1
I R----------7.1)-ay7053--------"2""""""""
I I
I i
0 Fire Hydrant(FH)
o
I 1
I Scale: 1-=30'
I I
I !
I 1
I ■
' 1
MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable):
North arrow Property lines &dimension Slope of property
Street &street name(s) Existing building, structures Utility&street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water,storm)
i.'SL..=.:y_ wa.:::w.., .,..r,,,.... 'i. '::'•, ,-,-".;M.i r :.::::� x.' -- .:.- .... �P-,"-_... ...;:A39Pv8..: ..�- _ _+�" .- -. .yIINSY!6' ai�.E�=!ilii.-:. s::
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of
SUBDIVISION LEGEND
INSTALL 2'POLE CONDUIT UNIT
ON EXISTING BRACKETS WITH NEW PGE FACILITIES TO BE INSTALLED
v SHUT DOWN REQUIRED t42 GO 40 T (UNLESS OTHERWISE SPECIFIED)
ON POLE 4604 TO CHANGE
K EXISTING CUTOUT TO
°46' POLYMER B!• INSTALL FACILITIES
169
O 1 �� 644-PGE PADMOUNT VAULT.WITH 64-332P-2125 PGE TOP
B 26 1141'1\4142 40 T ED PROVIDED 8 INSTALLED BY CUSTOMER
�l• -'TNDUIT (3 FAULT INDICATOR
•` maik, pL-4604 % INSTALL CUTOUT
SIZE FUSING AS NOTED
O PF 300 SECONDARY PEDESTAL.
PROVIDED BY PGE A INSTALLED BY CUSTOMER
1 2
120240V 3 4 ____ __.INSTALL 1-02 AL-EPR JKT PRIMARY IN 1-2"PVC CONDUIT
200AMP 6 6 T B PROVIDED A INSTALLED BY CUSTOMER
3.44%VD
I.93%FLKR -INSTALL 141350 AL-TX SECONDARY IN 1.3"PVC CONDUIT
7,560AFC PROVIDED A INSTALLED BY CUSTOMER
120240V
B 50 200AMP CUSTOMER TO INSTALL 3"PVC CONDUIT&STUB-UP
557 3.44%VD FOR FUTURE 1-410 AL-TX SERVICE
VI 147 PO O I.03%FLKR
•
5i5' --�5- 90 VT 148 7,905A AFC
�� 190 V149 260' VT 154 DO WITH SLCST WO#M2485273
T., N17E'
3
Ln
METERED CONSTRUCTION NOTES: RSDEV
v LIGHTING CONTROLLER PR/VA TE ROAD
EXISTING PGE OH B PHASE C1I35C
m i 7,200 VOLT 1.CUSTOMER TO PROVIDE ALL TRENCHING AND BACKFILLING.JOINT USE TRENCH
WITH GAS,TRENCH TO BE 48 INCHES DEEP AND 301NCHES WIDE,MEASURED FROM
FINAL GRADE.
2.A POE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED POE VAULTS
OFJCONDUIITSTION BOXES
ANDULL STRINGS.CALLIUTIES INCLUDING$ERVICE COORDINATION ACONNECTION
50-3-323-88700 ATION
TO SCHEDULE A PGE STANDBY CREW.
3.ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY.SCHEDULE 40,ELECTRICAL
GRADE,PVC CONDUIT WITH NYLON PULL STRINGS I MIN.500 LBS.TEST).
PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED,
MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN
GAS AND
OTHER CTALL _AL SMALLER RADIUS.DIU3.
ALL BENDS MUST E FACORY MADEEL OWS LARGER THAN 4 INCH TO 60 INCH
6661 FOR RUNS OF RADIGID IUS.
OR LONGER,OR FOROR PGE OANYY LENGTH RUNS BENDS OARRE T REQUIRED
4014 180 DEGREES IN BENDS.PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF
2001 150 FEET OR LESS.THE MAXIMUM TOTAL ENDS IN ANY CONDUIT RUN IS 270 DEGREES
B 26 74441 1 4.CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS.ALL CROSSINGS MUST EXTEND
FROM PROPERTY LINE TO PROPERTY LINE.USE ONLY GRAY SCHEDULE 40,
14870
.a ELECTRICAL GRADE,PVC CONDUIT.CROSSINGS TO BE 48 INCHES DEEP.MEASURED
142 25 T 40..3 FROM FINAL GRADE.
2006
5.DIRECTIONAL BAtaNGvc REQUIREMENTSI SLACK HDPE I HIGH DENSITY POLYETHYLENE) DUCT
S SCOT CT 14871 CO OR PVC WITH A AN MECHANICAL CONNECTION HO ON(CT.HOPE
LIKE MECHANICAL
US-I CONNECTIONEQIREMES OF PGE ASIALTERNATIVE 5 HOPE ABLE.HDPE SHALL MOOT THE
F REQUIREMENTS OF PGE SPECIFICATION LC2051 S I AVAILABLE ON REQUEST FROM PGE PROJEC
1976 MANAGER.FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE
EXTRUDED RED STRIPES f WHICH IS A SPECIFICATION REQUIREMENT) MANDREL TEST OF
Q SwLRlTMAyE HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPFC TOR PRESENT
F. RFL 2 ACSR
S.CUSTOMER TO PROVIDE AND INSTALLPOE VAULT WITH e84-332P"2125 COVER,
FOR
UTILRY VAULT MODEL OR EQUIVALENT FOR POE PAD MOUNT TRANSFORMERS.
PADNAULT TOE SET AT FINAL GRADE(SEE DETAIL ON SKETCH).
7.ALL PGE TRANSFORMERS TONE INSTALLED a FEET an FROM ANY COMBUSTIBLE
BUILDING,WALL OR OVERHANG AND 4 FEET(MIM ANL FIRE AYDRANT.
PGE TRANSFORMERS MUST BE WITHIN ANC 15 FEET OF A DRIVEABLE TFU AREM
ALWAYS MAINTNN 70 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS.
8.STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED
70 VEHICLES.
9.ALL SWITCH IGNE S TO E$ETH FINAL GRADE WITH 8 INCH GRAVEL 711r4-AATUCTS1
CONDOR$ALIGNED TO ENTERTHE VAULTENDLOWER KNOCKOUTS(
(SEE DETNI ON SKETCIO
10.FRONT LOT PUBLIC UTILITY EASEMENT(P.U.E) TO BE 8 FEET(MRO
10 FEET!PREFRRED)
11.ESTIMATED AMPS MOTOR STARTING CURRENT FOR FLICKER CALCULATION$.
TRANSFORMER LOADING AND VOLTAGE DROP CALCUUTIONS BASED ON KW
pD-57 B PHASE PER RESIDENCE.
12.CONSUL]WITH PGE REPRESENTATIVE 2 WEEK$BEFORE STARTING MAIN POWER
WILL BE EXCAVATOR.
VA A R.PGO.TELCO,CATV,ANFERENCE.INCLUDED IN TNI$CONFERENCE
INSTALL. WILL BE EXCAVATOR,PGE, CAN,ANO GAS.
O 13.DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT NONSTANDARD
1P 7.2 2401120 PM 50 KVA NTLB UNDERGROUND
ERUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST
ON 644-PGE PAD MOUNT VAULT
8 CUSTOMERS
LOAD 30 KW RE..Mtr t. l°- Fl.1104 ANY DEVIATION FROM THIS DESIGN MUST
RIGHT-OF-WAY PERMIT NOTICE: BE APPROVED BY PGE PROJECT MANAGER
ap.il LEGEND
11,1441A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY
r / T�.H1a 0 Gag UM.. WORK IN THE RIGHT-OF-wAY MAY BE PERFORMED. ONLY PGE APPROVED PGE FACILITIES NOT DRAWN TO SCALE
•" TYAIR4Rr, CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL
j TMiwmR =am,
Wilde 000O+'' AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER POE'S PERMIT. THIS DRAWING IS A GRAPHICAL REPRESENTATION OF PORTLAND GENERAL
THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS ELECTRIC FACILITIES IN THE FIELD.THIS MAP ILLUSTRATES ELECTRICAL
e Tek,CAT(
RM..... THE
WORK IS TO BEGIN.A COPY Of THE PERMIT MUST BE ON SITE. CONNECTIVITY,TYPES AND NUMBERS OF CONDUCTORS AND PLACEMENT OF
6x4x4 VAULT WITH 3"TERM)-DUCTS �RB�%
WRRANSFORMEREQUIPMENT WITHIN THE DISTRIBUTION SYSTEM.IT IS RECOMMENDED THAT
OPENING N TRANSFORMER PAD MUST FACE C. I 1 NNn R..MM THE USER NOT RELY ON THIS DIAGRAM FOR GEOGRAPHICAL LOCATIONS
STREET SIDE OR PARRMG AREA17
el0110,Z,Z:',,
ERBUCT M cIER PRO FROM ANY BACH sFMLE r� R_ 1t sa' I VM" POE CONSTRUCTION DRAWING
STRI/CJVRE IS 8'FROM SIDES AND eACR OFYAULT WITH Kt'CLEAR SPACE IN FROM J•IN Ll.e MWies Tn..AOF VAULT AS—BUILT VERIFICATION & NESC VIOLATIONS CORRECTED
NNAL GRADE WHEN CLOSER THINK This document Dcw R Ip represents FIELD eDnst ECI Dn.
THAN 2'TO A HARD SURFACE PF300 SECONDARY SPUCE PEDESTAL _ �.m" SAFETY Farcman: :
FINAL GRADE WHEN INR T .?�K� .railreonnrrFIRST! General Foreman: Date:
/ IANoscAPE ARIA (-
..`,`. `��� safeLl l r_\I (Signature only required for field construction changes.)
i,�..... ` SDPMENG REVIEW: IASBUILT BY DESIGNER:
"i DA E. STAN AccoLJN7: Awo. oe No
p° CONTACT SERVICE COORDINATOR 2/11,2019 NTS I 1070001 I 1000004596 N M2465267
PROW/ �, �e M,‘7.,":7.4
AD \ fORORe KEILL ENCH 0 C011WNOir T INSTALL WIPEVION PE
O r LE
DIRCIS BIorN ltOfl A I" 'k �I�F :anl-•eo!,m1.ueRF1uE0 q`
SAGE BUILT HOMES UC/CANYON COURT
Net, O0 8C. xnne.w ."iLZ.— )5 SERVICE COORDINATOR I./ \- CIRCUIT SIZE
SIDE Cr ` IB ', 503 323 6700 OR 800-542-RRI6(SALEM) PROGRESS-GREENBURG 17x22
U f�_,.MOW iia l 1kSoCALL 811 BEFORE YOU DIG PGE /I LOCATION
— /�eO0 � - ` O 11600 SW 98TH AVE TIGARD OR 97223
(PRIMARY-FIELD SIDE ON!t ATTENTION:
�x - — L, _ OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED
\% BY THE OREGON UTILITY NOTIF/CATION CENTER. DESCRIPTION
FL"MINUS CRUSHED ROLE" �' e1O I ¢ 0-Y' THOSE RULES ARE SET FORTH IN OAR 952-001-0010 SHUTDOWN REGD.INST UG SERVICE TO 8 LOT SUBDIVISION
6"DEEP(MINI TAS. 4, 5..E • - SO THROUGH 9S2-00I-0090,YOU MAY OBTAIN COPIES OF ROCK WITH SHEET
/ THE RULES BY CALLING THE OREGON LITRJTY Y0'� 1FAVERTON WASHINGTON SECTION(S)
C(SJ M2485273 1 of I
0)540 Ka3114.ID,,ez,g.me.us 11 SRI s-20)01 1Z NOTIFICATKN)CENTER ADMINISTRATION Q 1503-232-19671 UNE CREW GENIE! pESIGN e1, PHONE 15031 Mom e1,
RiNortDNortD ON OW DOWN COST FOE IMC RROCOIO4S 1*NMTN:NTS OF RIDOAO WILL TO REQUEST UTILITY LOCATES CALL THE OREGON ::n sW nim De DINA WALLACE 672-5478 SU)ATHA NARAYANAN
3"CONt11 T UNAID ICO Ill a 18410 0.0 n OS NS u.TSGRAM ANIWO D
scsrssn rem.u se oe010N* UTILITY NOTIFICATION CENTER,810 AT LEAST Knew*hers below. N, ,OR,�
,,COFLDARY-STREET SOF ONLY De Ne AMEN 2 BUSINESS DAYS PRIOR TO EXCAVATION. CQII Were you dig. O PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
Page 84 2011 Edition
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
N
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4)should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 September 2016
2011 Edition Page 85
N
Stationary Lane Closure with Flagging Diagram 320
SDN
\ v
\OO6 \ C
0
w a)
c 9 Q
a)
o o2 0
m
Chm rn
as
w a\0
* 1 T
al /— i" °3
m d O * i I—
• m03
1. A •11' :c R,-
CL O
•
44* -11A 4 t
o4ATl EE l a a§A
f- 3
I .. IF •
>a •
i
CO
o-E • II •
I% •
L O. 0g.
••
H \-7. ;1=T /4.
/0
i v.d / / w,r a
, LLI<
�' 4 1 � CO iLrb
U) 1� �CC a
Y
_ 4
, fm
Sign Spacing and Buffer Lengths(feet) M
• i,,,,_, /.,._..„u, _-a
Posted Spacing Between Signs "Buffer” U —\\ p C
Speed A B C Space Q O
el
20 50 Z2 /O
25 100 100 100 75 O
,
�
30 100 .\
35 125
350 350 350
40 150 Q 2
45 180 Q
50 500 500 500 210
55 250
60 285
65 700 700 700 325
70 365
September 2016 Chapter 5