Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PFI2019-00083
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 111 >a COMMUNITY DEVELOPMENT Permit#: PF12019-00083 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 03/18/2019 Parcel: SEG75 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Replace PGE pole 1612. PGE job M2551627. Owner: FEES Description Date Amount PFI Permit Fee 03/18/2019 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: MIKE CARSTEN 10800 SW AVERY ST TUALATIN, OR 97062 PHONE: 503-718-6309 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant PeLICAT Signature: Issued By: Y Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00083 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OUCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. Call Ken Fisher at 503 816 6146 or Kenny@tigard-or.gov PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holders expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED City ofTigard MAR 13 209 PUBLIC WORKS — ENGINEERING CIT Public Facility Improvem ' Irmit TIGARD TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) TYPE 1—Franchise Utility Work Check one: ❑ Utilities ❑ Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE Detailed description: Replace PGE pole 1612 and/or utility agency. PCI F,JOB M2551627 ❑ TYPE 2—Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair. Property address/location(s): ,� �� • Driveway approach installation and/or repair 9145 S\X7 74th Ave Tigard OR 97223 • Sanitary sewer lateral installation and/or main line tap Applicant: PGE (Submitted byLinda Ott) El TYPE 3—Full scale Development Work performed with Land use Address: 10800 SW Avery ST approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503.612.6093 Email: prereqcoord@pgn.com • Subdivisions or Partitions • Street widening Contact name: Mike Carsten Phone: 503-718-6309 • Mainline installation for Sanitary Contractor: Portland General Electric sewer, Storm sewer, Tigard water and/or Tigard Water Service Area CCB#: Expiration: Address: 10800 SW Avery St SUBMIT COMPLETED APPLICATION TO: City/state: Tualatin, OR Zip: 97062 City of Tigard Planning/Engineering Phone: 503 464 7777 Email: preregcoord@pgn.com 13125 SW Hall Blvd. Contact name: Phone: Tigard,OR 97223 ,Applications for"minor work in right-of-way" only may be emailed to: Engineer: NA rowpermits(a tigard-or.gov Address: FOR STAFF USE ONLY City/state: Zip: Phone: Email: Case No.: /`2 0/9 — ©0D65 Contact name: Application submittal fee(.007();'0 of Engineer's Estimate) $ 30t- Estimated value of work is required(if over$5,000):$ Additional fees: $ (within the public right-of-way) Application accepted: By: Date: 2/13)/ Is work related to a LAND-USE DECISION? ❑ Yes ® No Application reviewed: If so, please specify (MLP, SDR, SUB, etc.) case #: n By: ate: 3 ) Is work related to a BUILDING PERMIT? ❑ Yes I No Applicant notified:T By: Date: 4c--1) 1,1 If so, leases specify(BUILDING PERMIT)case#: I:\ENG\PermitApplications\pfi_application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of4 APPLICANTS NOTE: Person specified as "Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. V i n h D Nguyen, Digitally signed by Vinh D Nguyen,PE PE Date:2019.03.12 16:55:25-07'00' Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONLY Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL REQUIREMENTS APPLICATION FEE Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch Engineer's estimate X 2%Plan Review (including information below) ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. 0 General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ \Vater,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance may be ❑ Traffic Sight Distance required per TMC15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 SAMPLE SKETCH: SW "Y" St I Edge of F aveinent — Ditch --0.-- 1')'Nov Streetlight ,_.--_.—._.—._ _._ -r + Rain Drain 1,0411:14-.... 1111 JQ---)"Sti f, g Telt I T"firaPas'�d'cel+wlet flee" 1 w . : Existing House I -c; Existing TA ■ Driveway IT I 3I I op CIIrkl ■ a o r 1 i o I I I ■ Cia 1 o I I11\6 Existing Shop 1 I P. _= :_ -- \ Powerpole I ..',2 1 a - N � _ 95' 1 ■ . 315747tyLine I f I Fire Hydrant(FH) I I I I Scale: -I"=.30' • I I I ! I I . I I MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines &dimension Slope of property Street &street name(s) Existing building, structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 ' r 8990 8989 8980 8916 8902 OVERHEAD LEGEND IN _REMOVL!ABANDON FACILITIES_INSTALL FACILITIES p _INSTALL ADDITIONAL FACILITIES/MODIFY FACILITIES c m 9004 '..9 WORK LOCATIONS 9005 POLES N P 14 o co 9000 I POLE CLASS(1,2,3,4,H1,H2,S) 9 9�� HT-CL 9018 POLE HEIGHT FRAMING TRANSMISSION B DISTRIBUTION(SEE CODES BELOW) _FRAME DISTRIBUTION-LC10724,MU 0027 9019 9024 trt 027 (2PH BFT DE DBL LT,ARM,POLY) D107—FRAME DISTRIBUTIONMI_c, MU 0107 n (2PH BFT FIBERGLASS,DE,SLACK SPAN,POLY) eCe N 0186—FRAME DISTRIBUTION-LCI 0716,MU 0186 NgC-,�Ci NO (2PH 10FT DE FIBERGLASS) 9033 r EQUIPMENT 1584 r INSTALL FUSE 65T 45'-4 ANCHORS 1972 2 (-) 143 10 T K x `rips. B 15 25608- l = i a w -,7)'0,91 (LEAD) ni a ra' a s. B 2 P 7395 A_ (LBS) b a . N 4R-4, 21 Anchor Code m00m0 9c'iPpG 4,4cGv GUYING = i c7 o = o = c� o ,� G_ 6 ID to - , 6 e 740'. = C = .06.-LBS. 5 �� r F- 1512 142 65 T 1 GUY mIMmQIMM ei 45'2 142 65 2 m��®��� None ► `C 25 2GUYS °'r�°:''1�� 7010 1 C 15 17569 3 GUYS mOm1�Lmo1:ti WL 1 PL-1512: PGE OWNED POLE Install: POLE,45'-2 TREE TRIMMING NOTE• l'SW D107(NW) CLEAR CLIMBING D186(S) SPACE (2)WILDLIFE-DE PHASE COVER 1P 25KVA OH 120/240 7.2 NT1CB 1 ACCOUNT 6.88KVA • 45 Ir Al(EXISTING)-L=15'-9,950# o.0 N G16-PRI-4,614# . G16-NEUT-5,347# Co-'," 142 C/O F65T OH TAP Remove: 9130 POLE,40'-3 D27(HI NEUT) 1P 7.2 120/240 OH 15KVA NT1CB NF (2)G19 142 C/O F65T OH TAP TEMP TRANSFER COMM(S), PGE PULLED TOPPED TO COMM(S) TELCO TO PULL 1513 Q 45'-4 1976 n 9205 k co • V.1(1.--. U 9225 V— 9230 m 9235 11832 35'-4 1967 C 4/0 AL-TX • — C 350 AL-TX 85 * 9245 G2Pr 9240 1514'8 - 50 18330 0 25 50 100 Feet 9255 45'-4 1976 Op-' 9250 PGE CONSTRUCTION DRAWING AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED Foreman: Date: -- AHIN\ General Foreman: Date: — SAFETY (Signature only required for field construction changes.) SDPM/ENG REVIEW: IASBUILT BY DESIGNER: \IRST DATE SCALE ACCOUNT AWO JOB NO ANY DEVIATION FROM THIS DESIGN MUST \ 10/16/2018 1 in=50 ft 1070001 1000004544 M2551627 .REAPPROVED BY THE PGE PROJECT MANAGER TITLE C1125D,Replace PGE pole 1512 with taller pole,Comcast,PT 1478027 CALL 811 BEFORE YOU DIG CIRCUIT _ SIZE ATTENTION: C GARDEN HOME-METZGER 17 x 11 OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED PGGLOCATION BY THE OREGON UTILITY NOTIFICATION CENTER. 811 / 9145 SW 74th Ave,Tigard,OR 97223 THOSE RULES ARE SET FORTH IN OAR 952-001-0010 DESCRIPTION THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF C1125D,Replace PGE pole 1512 with taller pole,Comcast,PT 1478027 SHEET THE RULES 8Y CALLING THE OREGON UTILITY './ COUNTY SECTIONS WORK WITH NOTIFICATION CENTER ADMINISTRATION 81(502-232-1987) WASHINGTON C1125D 1 OF 1 TO REQUEST UTILITY LOCATES CALL THE OREGON L"1r�Y1!'s�0ilr. BEAVERTON DESIGN BY PHONE DRAWN BY UTILITY NOTIFICATION CENTER,811 AT LEAST C8116almi m dig. UNECREWCENTER MIKE CARSTEN 503.718.6309 SARA MCCAUGHAN 2 BUSINESS DAYS PRIOR TO EXCAVATION 2213 SW 153RD DR 13,WFRION OR 97006 ©PORTLAND GENERAL ELECTRIC CO-ALL RIGHTS RESERVED www.invarion.com Lane Closure at Intersection with Flagging Diagram 620 ROAD WORK AHEAD *+ ONE LANE 1. (Optional) ROAD `• AHEAD B BE PREPARED TO STOP •4 • B A (Optional) ONE LANE ROAD AHEAD BE 100 ft.Max. PREPARED ROAD TO STOP WORK AHEAD • • Buffer ♦- O O P- 0 > - 0 •: h .: I • 100 ft.Max.-H C B B A + • ROAD BE WORKO PREPARED 100 ft.Max. AHEAD TO STOP O ONE LANE ROAD AHEAD (Optional) q • B BE PREPARED TO STOP B (Optional) • ONE LANE I f ROAD AHEAD C ROAD WORK AHEAD www.invarion.com Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1 . During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B C Space ERRATA: 20 _ 50 25 100 100 100 75 Supplement Table 30 100 35 350 350 350 125 Updated: February 12, 40 150 2016 45 1 80 By:ODOT Traffic-Raodway 50500 500 500 210 Section 55 250 Signs Spacing and Buffer Lengths (feet) Supplement Posted Spacing Between Signs "Buffer" Speed A B C Space 60 285 65 700 700 700 325 70 365 Page 52 2011 Edition Bicycle and Pedestrian Accommodation Diagrams The following practices and details address the accommodation of bicycles and pedestrians within work zones. The following detail drawings should be incorporated, where appropriate, into the traffic control plan for any short term work. 1. See Section 1.6– Bicycle and Pedestrian Considerations for additional guidance. 2. Stay alert for pedestrians and bicycle traffic and accommodate safe passage for them, as needed. 3. The work space should be protected from bicycle and pedestrian intrusion by using barricades or closely-spaced channelizing devices. 4. Maintain access to transit stops or clearly close a transit stop using barricades or channelizing devices. Bicycle Accommodation Diagram 5-6 Bicycle Accommodation Principles; 1. If a significant volume of bicycles can be expected and work closes a marked bicycle facility, or requires bicycles to share a travel lane, install a "(Bicycle)ON ROADWAY" sign (CW11-1) or the Bicycle symbol (W11-1)sign with an "ON ROADWAY" (OBW1-5)rider, in advance of the work area. 2. Install temporary signing off the paved shoulder, within the planter (buffer) strip, or share the width needed between the shoulder and the sidewalk, as available. N (-6 3. Signs are to remain in place until the surface is restored and the width a made available for bicycle use. See Diagram 5-6 for typical bicycle signing placement. ro Sign Spacing and Buffer Lengths (feet) o Posted Spacing Between Signs Buffer Speed A B C Space 20 50 _ 25 100 100 100 75 30 100 35 125 350 350 350 — 40 150 45 180 50 500 500 500 210 55 250 Chapter 5 December 201 1 • 2011 Edition Page 53 Bicycle Accommodation Diagram 5-6 I I I ! NOTES: I I i I • Bicycles on Roadway(CW11-1)sign should not interrupt standard sequences. For example: c. BE PREPARED TO STOP/Flagger Symbol LANE CLOSED AHEAD/Lane Ends 1 Work Symbol • Bicycles on Roadway sign typically follows ROAD Ni Area WORK AHEAD sign and used as general warning ,lir I I Al A ! T I ! O• I j n I B 0 G ON t ROADWAY i j I V If i C ! i ROAD WORK • AHEAD December 2011 Chapter 5