Permit CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2018-00279
7 I i A R.n 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04/10/2019
Parcel: 2S112DB00400
Jurisdiction: Tigard
Site address: 7337 SW KABLE LN
Project: T-Mobile Subdivision:HERN PACIFIC TIGARD INDUSTRIAL Lot: 4
Project Description: T-Mobile proposes to install antennas on an existing monopole with associated ground equipment.
Contractor: EXCEL CONSTRUCTION INC Owner: TILLAMOOK LIGHT LLC
35858 N HONEYMAN RD ATTN: BOB BRUCE
SCAPPOOSE, OR 97056 7337 SW KABLE LN
TIGARD, OR 97224
PHONE: 503-944-9817 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 04/10/2019 $729.45
Demolition
Occupancy Grp: U Occupancy Load: 0 12%State Surcharge-Building 04/10/2019 $87.53
Dwelling Units: 0 Plan Review 10/09/2018 $474.14
Stories: 0 Height: 0 ft Misc Administration Fee 04/10/2019 $4.25
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 04/10/2019 $98.00
Value: $50,000 Info Process/Archiving-Sm$0.50(up to 04/10/2019 $20.50
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,413.87
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. Yof ay obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: /jam -ermittee Signatur j ( ` • 4_/„
-/ -
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This perrnit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
y
CITY OF TIGARD BUILDING PERMIT
1 '• COMMUNITY DEVELOPMENTIll Permit#: BUP2018-00279
TI L A Ii.1.7 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04/10/2019
Parcel: 2S112DB00400
Jurisdiction: Tigard
Site address: 7337 SW KABLE LN
Project: T-Mobile Subdivision:'HERN PACIFIC TIGARD INDUSTRIAL Lot: 4
Project Description: T-Mobile proposes to install antennas on an existing monopole with associated ground equipment.
Contractor: EXCEL CONSTRUCTION INC Owner: TILLAMOOK LIGHT LLC
35858 N HONEYMAN RD ATTN: BOB BRUCE
SCAPPOOSE, OR 97056 7337 SW KABLE LN
TIGARD, OR 97224
PHONE: 503-944-9817 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 04/10/2019 $729.45
Demolition
Occupancy Grp: U Occupancy Load: 0 12%State Surcharge-Building 04/10/2019 $87.53
Dwelling Units: 0 Plan Review 10/09/2018 $474.14
Stories: 0 Height: 0 ft Misc Administration Fee 04/10/2019 $4.25
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 04/10/2019 $98.00
Value: $50,000 Info Process/Archiving-Sm$0.50(up to 04/10/2019 $20.50
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,413.87
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. Yo y obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: /
r i j ,// A •ermittee Signaturj ` ( la
#1!44.. a / -
/ Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
1
,
Building Permit Application
coo,
$ mereia RECEIVED FOR OF'F'ICE USE ONLI'
City of Tigard U C p 2018 R CReceived el � � �
Date/By. t
14 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review p
.- 1 Other Permit:
Phone: 503.718.2439 Fax: 503.598. r'�j�..j Date/By: Q ' ,:._„t
s O
�������``^, to `� Juris: � See Pa
T 1 G A RLl Inspection Line: 503.639.4175 . p Date Ready/By: Page 2 for
Internet: www.tigard-or.gov BUILDING ��!`�INo•led/Method: `�' !l�/ ,� Supplementallnformation
? ?%P*r $ //fi gs / I ° t t . zp . �
s,
®New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
��/ i /�� I�'"�' work indicated on this application.
❑ 1-"aild 2-family dwelling ®Commercial/industrial Valuation: $
0 Accessory building ❑Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
v/ '''''''''''47440r-
''' y�/may l
Total number of floors:
�, �� - �%� � %q:�..� � � �� 9x 166. � '.p '�;
Job site address:7337 SW Kable Lane New dwelling area: square feet
City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:€arm*. -Brive ?/trAtii= Covered porch area: square feet
Cross street/directions to job site:SW 72"d Ave Deck area: square feet
Other structure area: square feet
'
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.:2S112DB00400
Indicate the value(rounded to the nearest
earest dollar)
of all
materials,equipment, labor, and theprofit o
r the
r " ' ' work indicated on this application.fr � d '�L .aa ,.adssa �> t ''
T-Mobile proposes to install antennas on an existing Monopole with associated Valuation: $$50,000.00
ground equipment Existing building area: square feet
New building area: square feet
fs////y/�i .�'.;;1' ;f1;
/.x� e r i�,� v/%%/ �r r! 5 /1'/ /%/�/ 4 i'i / //: o * /
at `, r4z ' �41434':''
"�� � '6e; 6 ;; y� Number of stories:
1
Name:Tillamook Light,LLC Type of construction:
Address:7337 SW Kable Land Occupancy groups:
City/State/ZIP:Tigard,OR 97224 Existing:
g
Phone:( ) Fax:( ) New:
77
ti
�H;!/ , mai 5s���,�.y. � � � �,, .
Business name:Smartlink,LLC
Structural plan review fee(or deposit):
Contact name:Sara Treber 1
FLS plan review fee(if applicable):
Address:1410 E 9th St
Total fees due upon application:
City/State/ZIP:Newberg,OR 97132
Amount received:
Phone:(503)816-5490 Fax: :( ) ✓r4 // r/," ,
E-mail:sara.treber@smartlinklIc.com
,. 6
o e/o/,/ ,�0 17::::115f'7.7.1:),,,,,
ud�rj � °ffi Commercial and residential prescriptive installation of
,. : i/,' ,:,,,,vac:;,s ' '_' P Sr
tem.�xr ,, �-a% „ roof-to mounted Photovoltaic Solar Panel S stem.
Business name: Submit two(2)sets of roof plan with connection details ,
��<� and fire department access,along with the 2010 Oregon
Address: 3 Solar Installation Specialty Code checklist.
i SJ Permit fee(includes plan review
City/State/ZIP: t'_ $180.00
�� � and administrative fees):
Phone:S76) '1-../1"/ , t(7 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lie.: 1 Lpiti4.32 Total fee due upon application: $201.60
Authorized signature: /, / ^�, This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:Kelly Lea Date: j * Fee methodology set by Tri-County Building Industry
Service Board.
440-4613T(11/02/COM/WEB)
L:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011
Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:ABuilding\Permits\BUP-COM PermitApp.doc 03/03/2011
Building Division
Plan Submittal Requirements
'I [G A R D Commercial& Multi-Family-New,Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. ❑ map& tax lot# ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
I:\Building\Permits\BUP-COM PernutApp.doc 03/03/2011
ih
Building Division
Plan Submittal Requirement Matrix
T t G A RD Commercial& Multi-Family-New,Additions or Alterations
iiuiuiiiiriiir
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Permits\BUP-COM PemutApp.doc 03/03/2011
1
City of Tigard
IIIII ■
COMMUNITY DEVELOPMENT DEPARTMENT
T 1 G A R D Building Permit Review — Commercial - With Land Use
Building Permit #: i5up).0 r f^ 002-7?
Site Address: 133 7 ,cvv k..-al ble Lane_ Suite/Bldg#:
Project Name: airmen Drives
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: New G n-E2,nrW%r 0r e vI sfifl j Ai 0 no po(A. vuJ 'r-r, un ol,
ecliuierren 1-
/le Verify site address/suite# exists and active in permit system.
JZ River Terrace Neighborhood: ❑ Yes I, No
Z LandUseCase #: MM D 2-0 )e _. 3DQy .
Plans Match Approved Land Use:
7 Site Plan ❑ Landscape Plan ❑ Other:
❑ Urban Forestry Plan ❑ Elevation Plan
Building Height: Maximum Height Actual Height
0 Conditions Met: w/A. ❑ Prior to Submittal ❑ Prior to Permit Issuance
❑ BuSiness License:
Exists: ❑ Yes ❑ No,applicant notified to obtain business license
e—ff�lic Facilities Improvement (PFI) Permit:
Required: ❑ Yes,applicant was notified / No Applied For: ❑ Yes ❑ No,stop intake
Notes:
Approved by Planning: (VG,\,.,Z.. (SDate: 101 g l ( 9,
Revisions (after Building Submittal only) .� vie r Date{ u
Revision 1: a Approved ❑ Not Approved — 2-l J-1
Revision 2: ❑ Approved ❑ Not Approved I'
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 0 /1.--
Site Plans: #
Building Plans: #
Building Permit#: Pr nter building permit# above.
Workflow Routing: C' lanning engineering Permit Coordinator J❑ce ding
Workflow Sign-off: i Sign-off for1T'anning(include notes from planning review)
Route Application Documents: P Building: original permit application, site plans,building plans, engineer and
beam calculations and trust details,if applicable, etc.
Notes: 4 , '
, wBy Permit Technician: J �/%� Date: Unr/i
I:\Building\Fonns\B1dgPennitRvw_COM_WithLandUse 070915.docx
Engineering Review
❑ Slope at building pad:
❑ PFI Permit#: Ag4
❑ Conditions "Met"prior to issuance of building permit
❑ Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP)
❑ Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes ❑ No
Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No
LIDA Facility on lot: ❑ Yes ❑ No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: U,ir Date: `d.4/4g
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
.SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 1 N/A
Tigard Trans SDC: ❑ Yes N/A
Parks SDC: ❑ Yes N/A
"OK to Issue Permit
Approved by Permit Coordinator: Date: 101 Rep
1:\Building\For ns\BldgPermitRvw_COM_WithLandUse 070915.docx