Plans (84) Sopap 1 8 - o (z) 3 L 9
(N) Kerf PL 3/8" `y�S�O 'Z ` -- RECEIVED
APR - 2 2019
CITY OF TIGARD
OFFICE COPY
, BUILDING DIVISION
V /
3" City of Tigard
1 1/2 / ppr, ved Plans/ 50-
I
\t%;f47, / + Ig011
(E) W6x15 beam
1 1/2"
40:.15 il AirAs tight as possible.
1 1/2" r �/
Coord w/ Arch Raise (E) 5/8" steel
4
- rods Reconnect
N ,/ �` each end per (N)
1/4" N, / F
detail.
\
`/
(N) Window
'' (E) W6x15 columns
I /�, p
N,
�/ ,�, l
a (N) HSS 6x6x1/2
Spacer bar 1 1/2" sq. x 4 N
@ 24" o.c.. Weld to (E)
& (N) w/ 1/4" x 3" fillet. � '
(N) HSS 4x4x 1/2
r N _____ r�
!•_ Flat bar 5/8" + -
2 1/2" x 2„ @ 24” o.c.
1/4" I ea side of HSS
Coordinate shifting of 1/4" V
L3x3x 1/4x0'-3" w/ (1) (N) windows w/ archPR
to avoid conflict ����INE�� `���
3/4 x6 Titen HD 44079PE
f
anchor. 41/, it
OREGON
OL 4'v- 1 2,l-'
<,
G'•As c GP��
PIONEER WATERPROOFING 1 K EXP: 630/19
WEST WALL DIAGONAL 7650 SWBeveland.Suhe 100
T.M. RIPPEY h adOregon
MODIFICATION P )443-3900
CONSULTING ENGINEERS
Pax:(503)443-7700 DG 02/08/2019 S-1
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
11 I Transmittal Letter
T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: /CjklAr DATE RECEIVED:
DEPT: BUILDING DIVISION
RECEIVED/
FROM: S6 rc Cro V i h0 APR - 2 2
CITY 0- fIGARD
COMPANY: P I on esti ityp ou—F n9 BUIL* 'JG DIVISION
PHONE: 91 i ' 330 - cad- 4 By: // i
RE: 1,443D SVv 1 and AVC., 9c(rc, Old.91.-3 But P)l2 03341
(Site Address) (Permit Number)
Pi0r'€er I a\- r-pfoc it Retr, x3e i
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: 'ojies: Description:
XAdditional set(s) of plans. } Revisions:
Cross section(s) and details. )( Wall bracing and/or lateral analysis.
Floor/roof framing. \\6\. Basement and retaining walls.
Ii.)Beam calculations. V\ Engineer's calculations.
Other(explain): ` S/( \
REMARKS: 5ii-cto no) m r.AcCntt i Ori
FOR OFFICE USE ONLY
Routed to Permit Te• ician: Date: 4 - 4- J 9 Initials:
Fees Due: 0 Ye El No Fee Description:F Amount Due:
1`° 63L.'', re-v-, c{/e/ $ Li Jf-
$
$
$
Spe•.al
l' structions:
Reprint Permit(per PE): ❑ Yes iin No EI Done
7kApplicant Notified: Date: vC f �/ Initials:
1:\Building\Forms\TransmittalLetter-Revisions 061316.doc