Loading...
Report (62) �� � - �� �a-��. SLS U�-hcQ--. . CORGANI REcFm7D Submittal APR - 2 2019 Transmittal Corgan 120 East Greenway Plaza Suite 410 Houston TX 7704tt#tytja skr.{D BUILDING DIMS' N PROJECT: MCK_OR-Tigard CC Tenant DATE SENT: 3/8/2019 Improvements 18055.0000 SUBJECT: 088000-07 Glass &Glazing - SUBMITTAL ID: 088000-07 Delegated Design Submittals TYPE: Submittal TRANSMITTAL ID: 00640 PURPOSE: Comments Included VIA: Info Exchange REV f SPEC SECTION: 08 80 00 FROM NAME COMPANY EMAIL PHONE Camila Narvaez Corgan co ila.Narvaez@corgan 346-201-6206 Turner Eric Mishler Construction emishler@tcco.com 503-226-9825 Company Turner Bruce Reid Construction breid@tcco.com Company REMARKS: SEE ATTACHED COMMENTS CONTENTS QUANTITY: 1 DATED: 3/8/2019 `'{sr,11 FR• DESCRIPTION: 088000-07 Glass & Glazing - Delegated Design Submittals CORGAN.pdf ACTION: REMARKS: COPIES: Dennis Escobar (Corgan) Page 1 of 1 I Turner Submittal #08 80 00-7.0 08 80 00 - Glass and Glazing TCCo Portland Project: 181019-Compass Oncology-Westside Cancer Center 1155 SW Morrison St.,Suite 600 12123 SW 69th Ave Portland,Oregon 97205 Portland,Oregon 97223 Phone:(503)226-9825 088000-07 Glass & Glazing - Delegated Design Submittals SPEC SECTION: 08 80 00-Glass and Glazing SUBMITTAL MANAGER: Eric Mishler(Turner-Portland) STATUS: Open DATE CREATED: 02/11/2019 ISSUE DATE: 02/11/2019 REVISION: 0 RESPONSIBLE Dallas Glass RECEIVED FROM: Adam Person CONTRACTOR: RECEIVED DATE: 02/11/2019 SUBMIT BY: 02/11/2019 FINAL DUE DATE: 02/25/2019 LOCATION: SUB JOB: COST CODE: APPROVERS: Camila Narvaez(Corgan Architects) BALL IN COURT: Camila Narvaez(Corgan Architects) DISTRIBUTION: Jeff Goemmel (Fred Shearer&Sons),Josh Conley (Salem Wood Products),Ted Riley (Dallas Glass),Aaron Davies (Dallas Glass) ,Kraig Goode (Dallas Glass),Chris StMarie (Fred Shearer&Sons),Carrie Trant (Salem Wood Products),Greg Willis (Fred Shearer&Sons) ,Adam Person (Dallas Glass),Brent Bodwell (Dallas Glass),Amanda Becker (Dallas Glass&Window),Matt Halleman (Dallas Glass) DESCRIPTION: Delegated design submittal as required per RFI 055 response.Please review and confirm accepted and Contractor will submit to City of Tigard. ATTACHMENTS: SUBMITTAL WORKFLOW NAME SUBMITTER/ RETURNED SENT DATE DUE DATE RESPONSE ATTACHMENTS COMMENTS APPROVER DATE Camila Narvaez Approver 2/25/2019 Pending CORGAN SPEC.SEC. 088000-07 PROJECT a 18055 This review was performed only for general conformance with the design intent of the project and general compliance with the information given in the Contract Documents.Modifications or comments made on the submittal during this review do not relieve contractor from compliance with the requirements of the Contract Documents.Review of a specific Item does not include review of the assembly of which the Nem Is a component.Contractor Is responsible for dimensions to be confirmed and correlated at the jobslte;Information that pertains solely to the fabrication processes or to the means,methods,techniques, sequences,and procedures of construction;coordination of the work of all trades;and for performing all the work In a safe and satisfactory manner. ❑ No Exceptions Taken 0 N,Reviewed.Submtttd mat required by Comroct Documents • canmems mud., 0 qulrovi•wed for POnlyroject Close-Out Remama • Ravin 1 Resubmit ❑ Proposed Sabatlbdion.Resubmit Comply with Section a1 t5 00 O Rejected DATE 3/8/2019 gy CBmih. BY DATE COPIES TO TCCo Portland Page 1 of 1 Printed On:02/11/2019 03:33 PM