Report (65) CORGAI\I
APR 2 2019 Submittal
rlYC IR R
B�,,� ING DiViGION Tra nsm ltta
Corgan 120 East Greenway Plaza Suite 410 Houston TX 77046 United States
PROJECT: McK_OR-Tigard CC Tenant DATE SENT: 3/8/2019
Improvements
18055.0000
SUBJECT: 088000-07 Glass &Glazing - SUBMITTAL ID: 088000-07
Delegated Design Submittals
TYPE: Submittal TRANSMITTAL ID: 00640
PURPOSE: Comments Included VIA: Info Exchange
SPEC SECTION: 08 80 00
REY1ST
FROM
NAME COMPANY EMAIL PHONE
Camila Narvaez Corgan Camila.Narvaez@corgan 346-201-6206
TO
NAME E COMPANY EVfile Pr iON
Turner
Eric Mishler Construction emishler@tcco.com 503-226-9825
Company
Turner
Bruce Reid Construction breid@tcco.com
Company
REMARKS: SEE ATTACHED COMMENTS
CONTENTS
QUANTITY: 1 DATE 3/8/2019 N_,h F
DESCRIPTION:
088000-07 Glass & Glazing - Delegated Design Submittals CORGAN.pdf
ACTION:
REMARKS:
COPIES:
Dennis Escobar (Corgan)
Page 1 of 1
Turner Submittal #08 80 00-7.0
08 80 00 - Glass and Glazing
TCCo Portland Project: 181019-Compass Oncology-Westside Cancer Center
1155 SW Morrison St.,Suite 600 12123 SW 69th Ave
Portland,Oregon 97205 Portland,Oregon 97223
Phone:(503)226-9825
088000-07 Glass & Glazing - Delegated Design Submittals
SPEC SECTION: 08 80 00-Glass and Glazing SUBMITTAL MANAGER: Eric Mishler(Turner-Portland)
STATUS: Open DATE CREATED: 02/11/2019
ISSUE DATE: 02/11/2019 REVISION: 0
RESPONSIBLE Dallas Glass RECEIVED FROM: Adam Person
CONTRACTOR:
RECEIVED DATE: 02/11/2019 SUBMIT BY: 02/11/2019
FINAL DUE DATE: 02/25/2019 LOCATION:
SUB JOB: COST CODE:
APPROVERS: Camila Narvaez(Corgan Architects)
BALL IN COURT:
Camila Narvaez(Corgan Architects)
DISTRIBUTION:
Jeff Goemmel (Fred Shearer&Sons),Josh Conley (Salem Wood Products),Ted Riley (Dallas Glass),Aaron Davies (Dallas Glass)
,Kraig Goode (Dallas Glass),Chris StMarie (Fred Shearer&Sons),Carrie Trant (Salem Wood Products),Greg Willis (Fred Shearer&Sons)
,Adam Person (Dallas Glass),Brent Bodwell (Dallas Glass),Amanda Becker (Dallas Glass&Window),Matt Halleman (Dallas Glass)
DESCRIPTION:
Delegated design submittal as required per RFI 055 response.Please review and confirm accepted and Contractor will submit to City of Tigard.
ATTACHMENTS:
SUBMITTAL WORKFLOW
NAME SUBMITTER/ RETURNED
SENT DATE DUE DATE RESPONSE ATTACHMENTS COMMENTS
APPROVER DATE
Camila Narvaez Approver 2/25/2019 Pending
CORGAN
SPEC.SEC. 088000-07 PROJECT a 18055
This review was performed only for general conformance with the design Intent
of the project and general compliance wkh the information given in the Contract
Documents.Modifications or comments made on the submittal during this review
do not relieve contractor from compliance with the requirements of the Contract
Documents.Review of a specific Rem does not include review of the assembly
of which the Rem Is a component Contractor Is responsible for:dimensions
to be confirmed and correlated at the Jobstte;information that pertains
solely to the fabrication processes or to the means,methods,techniques,
sequences,and procedures of construction;coordination of the work of all
trades;and for performing all the work In a safe and satisfactory manner.
ID No Exceptions Taken 0 No Reviewed.Submi tel no
required by Contract Documents
WI Comments Included 0 Reviewed for Project Cloae-0ut
Raqulromanta Only
n Revise&Resubmit o Proposed Substitution.Resubmi
Comply with Section 0125 OS
Rejected
DATE 3/8/2019 By Camila N
BY DATE COPIES TO
TCCo Portland Page 1 of 1 Printed On:02/11/2019 03:33 PM