Loading...
Permit (42) CITY OF TIGARD MECHANICAL PERMIT • COMMUNITY DEVELOPMENT Permit#: MEC2019-00134 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04/01/2019 T I i' iz.Dg Parcel: 1S1260000300 Jurisdiction: Tigard Site address: 9329 SW WASHINGTON SQUARE RD T07 Project: Sephora Subdivision: None Lot: None Project Description: Replacing(2)split system heat pumps. Contractor: AMERICAN HEATING INC Owner: PPR WASHINGTON SQUARE LLC 5035 SE 24TH AVE PO BOX 847 PORTLAND, OR 97202-4765 CARLSBAD, CA 92018 PHONE: 503-239-4600 PHONE: FAX: 503-239-7038 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 03/28/2019 $1,662.51 Class of Work: ALT Type of Const: VB Plan Review 03/28/2019 $415.63 Occupancy Grp: M Occupancy Load: 12%State Surcharge-Mechanical 03/28/2019 $199.50 Stories: Info Process/Archiving-Lg$2.00(over 03/28/2019 $2.00 11x17) Project Valuation: $62,000.00 Info Process/Archiving-Sm$0.50(up to 03/28/2019 $13.00 11x17) Fuel Air Handlers Fuel Types: Electricity Units<10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Fumaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $2,292.64 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: 1 Special Inspection(see plans) Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. /1.4-A //�JJ Issued By: 'gd< Permittee Signature: .. ' Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application FOR OFFICE USE°NLI' Received -7//4 qty of Tigard Date/By: per? .. Permit No.: / � � lig r. 13125 SW Hall Blvd.,Tigard,OR 97223 PlanReview ,./37)..._ �+ 6 Phone: 503.718.2439 Fax: 503.598.1REGEIVED Date/By: "2� ' Jq Other Permit: TI G A R D Inspection Line: 503.639.4175 C Date Ready/Fly: / '/ aur s: ® See Page 2 for Internet: www.tigard-or.gov �rotified/M .: G�l / Supplemental Information MAR 5 2019 ���„„� ;,iv !!h,,[l ' �Oi” i,1 ' orf �. 8�p %„(;4 a0.r sit, //yy/� si!g1t 1� {.t 3,:;➢ 1 �,aT ❑ ® �`11 n1 n",t�'ON Mechanical permit fees*are based on the value of the work New construction Addition/alte Koit/re ettleTlt” performed.Indicate the value(rounded to the nearest dollar)of all O Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit. V :f# ' ltY > 1x743 ,".. �1Y-,- %� � .zJ1,34 value $$62,000.00 ,M ❑ 1-and 2-family dwelling ®Commercial/industrial 0 Accessory building For special information use checklist. ❑Multi-family 0 Master builder 0 Other: Description I Qty. I Ea. I Total %v, y r. r. l l�' ' Wi.. ''''4 °''''''''1�2Heating/cooling: P, z <! , ',3z-,,Z4,44:&` mo ".. 4''' �... Air conditioning 46.75 Job site address:9329 SW Washington Square Road Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP:Tigard OR 97223 Furnace 100,000+BTU(ducts/vents) 54.91 Heat pump 61.06 Suite/bldg./apt.no.: I Project name:Sephora Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: I Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 If 'w: e, 1'+1 OIC ), .. j /l Gas fireplace/insert 33.39 r----''''"''''',,J '''"'", xx ...,. . 4�' . s, ? �, ,. ,. ' %,., Flue vent for water heater or gas replace two split system heat pumps fireplace 23.32 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 / / Other: 23.32 t❑, OP �e i ., ❑�`1fE1v1A1i1T �!//,,,;, ..., ,• ' • t _ 1 Environmental exhaust and ventilation: Name: Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawlspace fans 23.32 ✓_ : W if Fii rcl% %'4 m� t 0, 'EIZkiii`` y� Other: 23.32 Business name:American Heating Inc. Fuel piping: $14.15 for first four;$4.03 for each additional Contact name:Brad Manchester Furnace,etc. Address:5035 SE 24th Ave Gas heat pump WalUsuspended/unit heater City/State/ZIP:Portland,OR,97202 Water heater Phone:(503)239-4600 Fax::(503)239-7038 Fireplace Range E-mail:brad@americanheating.net Barbecue ! 461 3 r t Clothes dryer(gas) Business name:American Heating Inc. Other Address:5035 SE 24th Ave Subtotal City/State/ZIP:Portland,OR,97202 Minimum permit fee($90.00) Plan review(25%of permit fee) Phone:(503)239-4600 Fax:(503)239-7038 State surcharge(12%of permit fee) CCB lic.:33135 TOTAL PERMIT FEE Authorized signature: / 40P This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Service Board Print name:Brad Manchester Date:2-28-19 I:\Building\Permits\MEC_PermitApp_040113.doc 440-4617T(11/02/COM/WEB) City of Tigard Tel: 503.718.2439 Location: Inspection Date: 9329 SW WASHINGTON SQUARE RD T07, May 3, 2019 at 8:32:00 AM TIGARD, OR, 97223 Record Type: Record ID: Commercial - Mechanical MEC2019-00134 Inspection Type: Inspector: 699 Mechanical final Chip Barnett Result: PASS - NoCofO Comments: Violation Summary: Inspector Contractor