Loading...
Permit (58) CITY OF TIGARD ELECTRICAL PERMIT o COMMUNITY DEVELOPMENT Permit#: ELC2019-00086 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/25/2019 T I i;;k i=.D9 Parcel: 1 S135BA00100 Jurisdiction: Tigard Site address: 10125 SW WASHINGTON SQUARE RD Project: Jaguar/Land Rover Subdivision: None Lot: None Project Description: Electrical for new commercial building for auto dealership. Contractor: OEG INC Owner: PPR SQUARE TOO LLC 1709 SE 3RD AVE PO BOX 847 PORTLAND, OR 97124 CARLSBAD, CA 92018 PHONE: 503-234-9900 PHONE: FAX: 503-234-1001 FEES Quantity Description Date Amount 1 ea Restricted Energy Permit 03/22/2019 $75.00 Specifics: 10 ea Services or Feeders-200 03/22/2019 $1,007.00 amps or less Type of Use: COM 8 ea Services or Feeders-201 to 03/22/2019 $1,068.48 Class of Work: ALT 400 amps Type of Const: 1 ea Services or Feeders-Over 03/22/2019 $552.26 1000 amps or volts Occupancy Grp: 262 crt Branch Circuits w/Purchase 03/22/2019 $1,944.04 Service or Feeder 1 ea 12%State Surcharge- 03/22/2019 $548.61 Electrical Total $5,195.39 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other app' •le law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuanc= if wor' is su -d f ore the 18(5---- days. 800 days. ATTENTION: Oregon law requires yo to follow the rules adopted by the Oregon Utility Notification en!. Tr. e ru: are et forth in OAR 952-001-0010 through OAR 9 -001-0090. Yo y obtain a c y of the rules or irect questions to OUNC by calling 503.2 19:` r .r 00. 32&4. /�� Issued By: � Permittee Signature: 1 OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNER'S SIGNATURE Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the job site at the time of each inspection. Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: Description Qty. Each Total Fee for all residential systems combined: $75.00 Renewable electrical energy systems: Check Type of Work Involved: s kva or less 100.70 2 5.01 to 15 kva 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 Wind generation systems in excess of 25 kva: ❑ Burglar Alarm 25.01 to 50 kva 301.04 2 50.01 to 100 kva 552.26 2 ❑ Garage Door Opener* >100 kva(fee in accordance 552.26 2 with OAR 918-309-0040) ❑ Heating,Ventilation and Air Conditioning Solar generation systems in excess of 25 kva: System* Each additional kva over 25 7.42 3 ❑ Vacuum Systems* >100 kva-no additional charge 0.0 3 Each additional inspection over allowable in any of the above: ❑ Other: Each additional inspection is 66.25/hr 1 charged at an hourly(1 hr min) Inspections for which no fee is 90.00/hr s.ecificall listed '/hr min \ ( � t� s , x01410\! ':,, \ NN NIAIA ' (Enter Fee for each commercial s stem: $75.00 Subtotal perperm on Page 1): y * Number of inspections allowed permit. (SEE OAR 918-309-0000) Check Type of Work Involved: ❑ Audio and Stereo Systems ❑ Boiler Controls ❑ Clock Systems ❑ Data Telecommunication Installation ❑ Fire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ Intercom and Paging Systems ❑ Landscape Irrigation Control* ❑ Medical ❑ Nurse Calls ❑ Outdoor Landscape Lighting* ❑ Protective Signaling ❑ Other: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations I:\Building\Permits\ELC_PermitApp_ELRERE.doc Rev 06/17/2015