Loading...
Permit (41) CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT t 111COMMUNITY DEVELOPMENT Permit#: FPS2019-00037 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/20/2019 Parcel: 2S 112 DA01400 Jurisdiction: Tigard Site address: 15350 SW SEQUOIA PKWY 250 Project: Tru Independence Subdivision: 1996-048 PARTITION PLAT Lot: 2 Project Description: Fire sprinkler permit:Adding(5)sprinkler heads to existing system. Affidavit submitted. Contractor: AFP SYSTEMS INC Owner: PACIFIC REALTY ASSOCIATES 19435 SW 129TH AVE ATTN: N PIVEN TUALATIN, OR 97062 15350 SW SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-692-9284 PHONE: 503-624-6300 FAX: 503-692-1186 FEES Description Date Amount Specifics: Permit Fee-COM 03/20/2019 $51.09 12%State Surcharge-Building 03/20/2019 $6.13 Type of Use: COM Plan Review-Fire Life Safety-COM 03/20/2019 $20.44 Class of Work: ALT Type of Const: Info Process/Archiving-Sm$0.50(up to 03/20/2019 $0.50 Occupancy Grp: Height: ft 11x17) Stories: Permit Fee-COM 03/20/2019 $40.35 12%State Surcharge-Building 03/20/2019 $4.84 Plan Review-Fire Life Safety-COM 03/20/2019 $16.14 Commercial Sprinkler System: Sprinkler Required: Yes Sprinkler Type: Wet Standpipe Required: No Hazard: LT Density: .10 Design Area: 1500 K Factor: 5.6 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Cut Sheets Required: Total $139.49 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $1,950.00 Residential Square Footage: 0 Fire Alarm Valuation: $0.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.8 4. E - Issued By: r ittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Fire Protection System FOR OFFICE USE ONL\ City of Tigard ��C� DateB 3/C ` A Other r itNo.:t-*.• ,tom * ? lig M ■ 13125 SW Hall Blvd.,Tigard,OR 97223 G Plan Review Phone: 503.718.2439 Fax: 503.598.196 DateB . ' ). . T t G A RD Inspection Line: 503.639.4175 ® g019 Date ReadyBy: H See Page 2 for Internet: www.tigard-or.gov MAR L Notified/Method: .PM Supplemental Information # ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the VE:;113-111t,eil,< # Y OF C.# `��� Mwork indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: 0 Master builder ❑Other: Number of bathrooms: Gyp'. „/ % \�a mi � � �r � � a Total number of floors: �J3 t 1 # IATIOIwf" 4l # ',11%/01. . �: - � /��. .,.U„ ..:/,>.Y.��,a ..... ���... � ,.,1,e•. Job site address:l:}'3.50 SW Sequoia Pkwy. New dwelling area: square feet City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.:250 Project name:Tru Independence TI Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet # ,1 -? t # # y , m l, Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and theprofit for the F, Ij1 � F %y 1j K r s s� �� d' work indicated on this application. Add 5 new sprinkler head drops off of existing wet system Valuation: $$1,950.00 to cover new floor plan. Existing building area: square feet New building area: square feet ra7d4f ROPERTy O RIFA Number of stories: 3 Name: Type of construction: III-B Address: Occupancy groups: City/State/ZIP: Existing: B-office Phone:( ) Fax:( ) New: no change Q ?PIT � . s _ % ` i1TP �i, :; Business name: All contractors and subcontractors are required to be Contact name: licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: jurisdiction in which work is being performed.If the City/State/ZIP: applicant is exempt from licensing,the following reasons apply: Phone:( ) Fax::( ) E-mail:breanna@afpsys.com >.�tsgoW�Y::- � ......., ,e9le -.^: :.%i„„, ... ..�.. .....,..y.. -.t\ rrr, - t v, Business name:AFP Systems Inc. \ �” 1cJ Permit fee: Address:19435 SW 129th Ave State surcharge(12%of permit fee): City/State/ZIP:Tualatin,OR 97062 0 FLS plan review(40%of permit fee): Phone:(503)692-9284 Fax:(503)692-1186 (Due upon application submittal.) CCB lic.:67537 Total permit fees: Amount received: Authorized signature: S A This permit application expires if a permit is not obtained Print name:Steve Frost Date:03/19/2019 within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\FPS-PermitApp_071514.doc 440-4613T(11/02/COM/WEB) City of Tigard: Fire Protection Permit Checklist Page 2- Supplemental Information ,i',9 r %' \ al` ` , k.. 1.) Type of Work: 2.) Addition/alteration only to sprinkler heads: 3.) Addition/alteration only to alarm devices: El New system Number of sprinkler heads: 5 Number of alarm devices: ® Addition or ® 1-10 heads: Affidavit required and ❑ 1-5 devices: Affidavit required and Alteration (3) copies of sketch showing area (3) copies of sketch showing area to existing of work within building structure of work within building structure system ❑ 11+ heads: Plan review required and ❑ 6+ devices: Plan review required and (3) sets of plans. (3) sets of plans. Additional description of work: �.. "' ( ,�, t .,, ., B,C ori ..�.�.�.. . � 1e) "'a`n.. i`\� %5.4 a,° �,. y .moi ,•�\�: 1e. ® Wet ❑ Dry Additional Standpipes Information: Hazard Group LH Density 0.10 Design Area 1500 K. Factor 5.6 Sprinkler Project Valuation: I $ 1,950.00 Hoo 1 int ; /?pi c t ' ,A y.,,, :: iii/" Hood Project Valuation: I $ 1xe 'ar i r �rii s�/yr a �\�� r Submittal shall Battery Calculations ❑ Yes include: Individual Component ❑ Yes Cut Sheets Fire Alarm Project Valuation: I $ o Square Footage: Permit Fee: yy 0 to 2,000 $198.75 `.. 2 001 to 3,600 $246.45 3,601 to 7,200 $310.05 � 'i% 7,201 and greater $404.39b. �, h Sprinkler Project Square Footage: sq. ft. \\ " / i' ,tection Pe z� �` a ,r r Project valuation subtotal (see A,B &C above): $ 1,950.00 Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (12%of permit fee): $ FLS Plan Review(40% of permit fee): $ TOTAL: $ X:\Permits Steve new\Tigard\tru independence TI FPS_PermitApp.doc 2 City of Tigard Permit No.: f j 1 6003 j 7 ,711 'g 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503.718.2439 Fax: 503.598.1960 Date Received: /1e'il c9 Inspection Line: 503.639.4175 IJ Internet: www.tigard-or.gov By: Cily cif .7141--4( FIRE SPRINKLER AFFIDAVIT FOR ALTERATION E E!V E D OR TENANT IMPROVEMENTS MAR 2 0 2019 (1 to 10 SPRINKLER HEADS WITHOUT PLANS) CITY OF TIGARD BUILDING DIVISION Project Name: Tru Independence TI Occupancy: B-office Job Address: 15350 SW Sequoia Pkwy.,Tigard,OR 97224 Type of Construction: 111-B Suite: 250 Contractor: AFP Systems Phone: 503-692-9284 Number of Proposed or Altered Heads: 5 Type: wet Hazard: light Density: 0.10 1, Steve Frost/AFP Systems Oregon Construction Contractors Board No. 67534 certify the following is true and reasonably defines the scope of work for this project: a) All work is limited to drops and armovers in a light-hazard occupancy. b) Positions of sprinkler heads relative to architectural features such as soffits, beams,partitions,walls, etc. complies with current adopted edition of NFPA 13. c) The proposed work does not require hydraulic calculations. d) Only one sprinkler head will be installed from one drop (exception: up to two heads from one drop may be installed when each head is in a separate fire area). e) The area covered per sprinkler head is limited to the spacing requirements of NFPA 13. f) Tenant improvements in a new building shall be equipped with Quick Response heads (see 2002 NFPA 13, Section 8.3.3.1 for exceptions). g) The installation shall comply with the requirements of the current adopted edition of NPFA 13. h) Piping shall not be concealed until hangers and bracing are inspected. i) Final approval shall be subject to onsite tests and inspections. In addition, I understand the following is required: • Submit(3) copies of a sketch showing the area of work within the building's structure. • Building fire protection system permit. • A copy of this document with a copy of the sketch attached shall be available for all inspections. r Digitally signed by Steve Frost Steve Frost Drt>acl steveeN:c=Steve Frost,o mF CSstems, Signature: Date:2019.03.1908:46:36-07'00' Date: 03/19/2019 I Print Name: Steve Frost I:\Building\Forms\FireSprinklerAffidavit_071514.docx Page 1 of 1 City of Tigard Tel: 503.718.2439 Location: Inspection Date: 15350 SW SEQUOIA PKWY 250, TIGARD, April 10, 2019 at 9:06:43 AM OR, 97224 Record Type: Record ID: Commercial - Fire Protection System FPS2019-00037 Inspection Type: Inspector: 999 Sprinkler final Chip Barnett Result: PASS - NoCofO Comments: Violation Summary: Inspector Contractor