Loading...
Permit (91) CITY OF TIGARD BUILDING PERMIT ' N. COMMUNITY DEVELOPMENT Permit#: BUP2018-00092 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/06/2019 T i ''� � g Parcel: 2S1010001600 Jurisdiction: Tigard Site address: 7730 SW HUNZIKER RD Project: The Fields Apartments-Building 2 Subdivision: FIELDS APARTMENTS Lot: None Project Description: Building 2-New 48-unit apartment building. Contractor: DBG PROPERTIES LLC Owner: FIELDS, FRED W REVOCABLE LIVING 2164 SW PARK PLACE 111 SW 5TH AVE#3675 PORTLAND, OR 97205 PORTLAND,OR 97204 PHONE: 503-956-4355 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: NEW Type of Const: VA Permit Fee-COM-New Construction 03/05/2019 $19,977.23 Occupancy Grp: R-2 Occupancy Load: 210 12%State Surcharge-Building 03/05/2019 $2,493.27 Plan Review 04/02/2018 $12,264.33 Dwelling Units: 48 DC Provision Review,COM New-Bldg 03/05/2019 $180.50 Stories: 4 Height: 45 ft Plan Review-Fire Life Safety 03/05/2019 $7,990.89 Bedrooms: 64 Bathrooms: 48 Info Process/Archiving-Lg$2.00(over 03/05/2019 $152.00 Value: $4,368,100 11x17) Info Process/Archiving-Sm$0.50(up to 03/05/2019 $325.00 11x17) Floor Areas: Metro Const.Excise Tax 03/05/2019 $5,241.72 Total Area: 41812 Tig-Tual School CET-Non Residential 03/05/2019 $26,341.56 Plan Review 03/05/2019 $720.87 Accessory Strutt: 0 Additional Permit 03/05/2019 $800.00 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $76,487.37 Required: Required Items and Reports(Conditions) 1 Special Inspection(see plans) Fire Sprinkler: Yes Parapet: No Fire Alarm: Yes Protected Corridors: Yes Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: E!/ j` r Permittee Signature: (7A/ 370/4,/e. ,9-�0 Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 1 Building Permit Application r-- - -— ,, b Commercialt-i FOR OFFICE USE ONLY NCity of Tigard 1;i�G i Received p�/ permit ` e(��� v 13125 SW Hall Tigard,OR 9722 Date/By: �� �� i __ i" t . ;,e ' : Plan Review/^) ^ 1 Phone: 503.718.2439Blvd., Fax: 503.598.1 T I>7A ° Date/By- J Other Permit: Y� T I C;A R D Inspection Line: 503.639.4175 f3 ti f D! (, r)it P '1 ', Date ReadyBy: j I Jur s: ® See Page 2 for Internet: www.ti and-or. ov Notified/Method: g g J�/////� "' I Supplemental Iuformatiou 1!7/�iYI6i lie-01t1 } -AA -s''' A' '` TYPE OF WORK ry REQUIRED."DATA 1-AND 2-FAj 1IL)/DWELLING''' ► New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF-CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ❑Commercial/industrial Valuation: $ ❑Accessory building ®Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: "'- ',0,,` Total number of floors: �;'. � JOB SITE°INFORMATION AND LOCATION° Job site address:7730 SW Hunziker Rd New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:Bldg 2 Project name:The Fields Apartments Covered porch area: square feet Cross street/directions to job site:SW Hunziker St&SW Wall St Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMEERCIAL�USI CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:2S1010001600 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the 'k-f,'` =DESCRIPTION d .WORK work indicated on this application. 4 STORY WOOD FRAMED APARTMENTS z 4-Ca U 1,11 Valuation: $$4,121, iiigc• owe i Existing building area: 0 square feet ----}.t New building area:-- 4t8 >$ square feet 9L J3 2 g r ►ZaPROPERT:OWNER,� ` "❑ TENANT' Number of stories: 4 r • .4_ Name:Fred W.Fields Revocable Living Trust do Miller Nash Graham&Dunn LLP Type of construction: VA Address:111 SW 5th Ave,#3400 Occupancy groups: City/State/ZIP:Portland,OR 97204 Existing: N/A Phone:(503)205-2332 Fax:( ) New: R-2 ,1- c APPLICANT "` x ., ►ii;CONTACT PER ON BUILDING PE ' E Business name:Otak Architects,Inc - . ,�x(Plea �efer o sch ule Structural plan review fee(or deposit): Contact name:Matt Neish,RA,AIA Address:808 SW 3rd Avenue,Suite 300 FLS plan review fee(if applicable): City/State/ZIP:Portland,OR 97204 Total fees due upon application: Phone:(503)415-2393 Fax::( ) Amount received: E-mail:matt.neish@otak.com PHOTUVOAICSOLAR PANELYSTYI F5* x Commercial and residential prescriptive installation of .y,, tri CQ, TRACTOR 41,7 +* A. roof-top mounted PhotoVoltaic Solar Panel System. Business name:DBG Properties LLC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:2164 SW Park Place Solar Installation Specialty Code checklist. City/State/ZIP:Portland,OR 97205 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)816-4084 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:201911 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Matt Neish Date:3/29/2018 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) IN .. q Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: - $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 Albert Shields From: Albert Shields Sent: Monday,April 9, 2018 5:27 PM To: 'matt.neish@otak.com' Subject: The Fields Apartments, BUP2018-00091, -00092, -00093, -00094, -00095, &-00096,and SIT2018-00007. Attachments: Albert Shields.vcf; Conditions Fields Apts -04-09-2018.pdf Matt, upon reviewing your applications and plans for the above permits for The Fields Apartments we note that most of the Conditions of Approval for the underlying Land Use Case, PDR2017-00004 remain Not Met. I have highlighted on the attached list the conditions that must be met before either a site permit or a building permit can be issued. Accordingly, I have classified the SIT permit and these BUP permits as"Approved (for Plan Review) but Not Released." Plan Review will proceed but the permits will not be released for issuance until the appropriate conditions have been met. Please let me know if you have any questions. Albert Shields City of Tigard Permit Coordinator i5 3:71£-2 32 t11vo rk 13125 SW Hall Blvd. Tigard,Oregon 97217 wwrw.tigard-or.gov 1 Branden Taggart From: Branden Taggart Sent: Thursday, November 01, 2018 4:25 PM To: 'Christina.Kwiecienski@otak.com' Cc: 'matt.neish@otak.com'; #Building Permit Technicians Subject: The Fields Apartments Buildings 1,2,4,5: BUP2018-00091,92,94,95 Attachments: Branden Taggart.vcf; The Fields Apartments Building Permit Fees.pdf Hi Christina, The building permits for The Fields Apartments buildings 1, 2,4, and 5 are ready to issue now. The fees due are as follows: The Fields Apartments Building# Permit# Fees Due 1 BUP2018-00091 $ 386,949.48 2 BUP2018-00092 $ 329,807.04 4 BUP2018-00094 $ 350,069.57 5 BUP2018-00095 $ 393,471.09 Total: $1,460,297.18 Due to the amount of each building permit, we ask that you pay with a check. We will let you know when the permits for the remaining two buildings are ready to issue. Please let me know if you have questions. Thank you, Branden Taggart at City of Tigard Senior Permit Technician Community Development TIGARD 13125 SW Flail Blvd Tigard,OR 97223 (5031718-2449 brandent s•4 tigard-o r.goiv 1 City of Tigard IIIa COMMUNITY DEVELOPMENT DEPARTMENT ■ T1cARD Building Permit Review — Commercial - With Land Use Building Permit #: a1.`i„e/f -e0,04);,:7- Site QpSite Address: 7730 cIN I h[--1 121) Suite/Bldg#: 2 Project Name: '(i° r10,PS Ai,A-KrMG-KIT--s (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: IN 114)11\1(1 ?L*J Ve‘AetV ❑ Verify site address/suite#exists and active in permit system. ❑ River Terrace Neighborhood: ❑ Yes X.No ❑ Land Use Case#: ppg_ iofl -COCCI cL-r Z-c4 7 - cooOS , Ntui9 2-011 - ao0001 FPlans Match Approved Land Use: q Site Plan ❑ Landscape Plan ❑ Other: ❑ Urban Forestry Plan Elevation Plan p- Building Height: Maximum Height YS Actual Height C/ yConditions Met: IX Prior to Submittal ❑ Prior to Permit Issuance Business License: Exists: [ /Yes ❑ No,applicant notified to obtain business license ❑ Public Facilities Improvement(PFI) Permit: Required: Yes,applicant was notified ❑ No Applied For: ,Yes ❑ No, stop intake Notes: Approved by Planning: Gl-- Date: /2 /8 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved MIMI Building Permit Submittal Original Submittal Date: /P Site Plans: ## /G/ Building Plans: # ,. Building Permit#: [ Enter building permit#above. Workflow Routing: [3'Planning Engineering Permit Coordinator 1E1—Building Workflow Sign-off: Er-Sign-off for Planning(include notes from planning review) Route Application Documents: eTBuilding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: !,1 L .- By Permit Technician: Mil. .0 > Date: 7/AAP I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 060116.docx Engineering Review 7 -a-Slope at building pad: ❑ PFI Permit#: E Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes No Assess Water Quantity Fee in-lieu: ❑ Yes lf No LIDA Facility on lot: ❑ Yes No ❑ NOT Approved by Engineering: Date Notes: ZSL �j1J) LL ?-kr �i TZ 1 Ei ITIG Approved by Engineering: Iiit (k-g_ Date: 4/06 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit `Approved,NOT Released: Flu., cad Date: .4)// // Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: y'SDC Fees Entered: Wash Co Trans Dev Tax: 1'es ❑ N/A Tigard Trans SDC: Yes ❑ N/A Parks SDC: -Yes ❑ N/A VC7-------0K to Issue Permit AApproved by Permit Coordinator: Date: /02•'"11( I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_070915.docx Site Address: 7730 SW Hunziker BLD #2 1111 ii Building Divisi n T I GARD Deferred Submittal Tr smittal Letter TO: DATE RECEIVED: DEPT: BUILDING DIVISION FROM: JUL 102019 COMPANY: DAG Pit -r PHONE: `—fit - Otc.9 -.7 4 P1 C i cC\A) By: RE: 7730 SW Hunzik-,' BUP2018-00092 (Site Address) (Permit/Case Number) The Fields Ap..` ments Item# 2 (Project name or s..bdivision name and lot number) e+ Valuation ,f Deferred Submittal: $ S i ATTACHED IS THE F42) NG DEFERRED SUBMITTAL ITEM: Copies: Descript '� �,A Wood Floo 'ists Remarks: NOTE:Documents f•, deferred submittal items shall be submitted to the registered design professional in responsible charge w, o shall review them and forward them to the building official with a notation indicating that the deferred submi :1 documents have been reviewed and been found to be in general conformance to the design of the building.The d ferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ` I1 Yis ❑ No Fee Description: Amount Due: Deferred Submittal Fee: $ 6' $6—' ca.7z,7 Additional fee based on valuation: $ Other: $ Total Fees Due: $ Specia Instru tions: Reprint Permit(per PE): ❑ Yes ®,No ❑ Done /ice Applicant Notified: Date: '7( Initials: 4 The fee for processing an reg deferred plan submittal shall be an amount equal to 65%of th buildingbased q on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in addition to the project plan review fee based on the total project value. I:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07 OFFICE Copy /% FR ',1d SUBMITTAL COVER SHEkE FRQtH/NGBSlD/NG CE1VED Time Frame Inc. 8383 NE Sandy Blvd. Suite#455 JUL 10 2019 Portland OR97220 ',T' OF ° )1NG Divi ..,,..; Office:(503)255-1747 Fax:(503)255-4150 Submittal ID# Project# Date Project Name TFS-03 1825 3/20/2019 The Fields SUBMITTED TO: PREPARED BY: To: Todd Coleman Name: Brian Olson Firm: DBG Properties Title: Project Manager SUBMITTAL TYPE: ENGINEERED WOOD PRODUCTS COMMENTS: Spec/Detail Items Submitted 803003-Transmittal-Itr 803003-LAYOUTS(24X36)(bnw) 803003_Sealed_DRC_20190215 apa-pr-1238-i-joist ESR-1940 ROSBORO STNDRD GLB icc-es-esr-1305-Ipi icc-es-esr-2403-1s l-and-M NO EXCEPTION TAKEN 0 SEE NOTATIONS ' li REJECTED 0 REVISE AND RESUBMIT i, II SUBMIT SPECIFIC ITEM 0 REVIEWED WITHOUT i{ II i THIS REVIEW WAS PERFORMED ONLY FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH I' THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS.MODIFICATIONS OR COMMENTS MADE ON THE SHOP DRAWINGS DURING THIS REVIEW DD — NOT RELIEVE THE CONTRACTOR PROM"I/11'ANCE WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.REVIEW OFA SPECIFIC TEM DOES NOT NECESSARILY INCLUDE THE REVIEW OF THE ASSEMBLY OF I WHICH THE ITEM ISA COMPONENT THE CONTRACTOR IS RESPONSIBLE FOR OONFB W MIM AND CGRRitATW B ALL BAIEMYIONB ANG gMIRITR6 P UR NLTO"CROPNE TORIA A 50 RREESPONSIB E FORT HE WORK OF ALL TRADES ANb FOR PERFORMING ALL WORK INASAFE ASS 1I .SATISFACTORY MANNER. - ENAYAT SCHNEIDER SMITH ENGINEERING,INC. wY: Wahid DATE:6-25-19 I tiuTTIG TM Fr- a '7'- 8100 SW Hunziker Street .. TIGARD, OREGON 97223 BUILDING PRODUCTS PHONE (503)620-1411 JUL 10 ;3 FAX(503) 968-6048 CITY Lr .til BUILDING C It OCA Letter of Transmittal TO: SHELTER PRODUCTS Date: 02/15/19 Project: THE FIELDS APARTMENTS TIGARD, OR ATTN: GRANT Job No. 803003 ❑, Shop Drawings ❑ Contract Drawings ❑ Bid ❑ Calculations ❑✓ Reports ❑ Material List ❑ Samples O Special Details ❑� Other(stamped calcs.) COPIES DATE PAGE NO. DESCRIPTION 1 1-6 LP I-JOIST LAYOUTS (PDF)COLOR 1 1-6 LP I-JOIST LAYOUTS (PDF)BLACK&WHITE 1 1-7 LP I-JOIST CALCS (STAMPED)(PDF) 1 1-18 ESR-2403 (PDF) 1 1-53 ESR-1305 (PDF) 1 1-13 PR-L238(PDF) 1 1-5 ESR-1940 (PDF) THESE ARE TRANSMITTED as checked below: ❑ As requested ❑ Revision#1 D For review and comment ❑ For your use ❑ Revision#2 ❑ For Bids Due • For Approval 0 REMARKS: GRANT, Please send back approved set for production. Please let me know if you have any questions with our submittal. Thank you, Aaron Hulse Copy to: Signed: