Permit (92) 1114
CITY OF TIGARD BUILDING PERMIT
# . COMMUNITY DEVELOPMENT Permit#: BUP2018-00093
Date Issued: 03/06/2019TItt T 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439
Parcel: 2S1010001600
Jurisdiction: Tigard
Site address: 7790 SW HUNZIKER RD
Project: The Fields Apartments-Building 3 Subdivision: FIELDS APARTMENTS Lot: None
Project Description: Building 3-New 1-story clubhouse.
Contractor: DBG PROPERTIES LLC Owner: FIELDS, FRED W REVOCABLE LIVING
2164 SW PARK PLACE 111 SW 5TH AVE#3675
PORTLAND, OR 97205 PORTLAND,OR 97204
PHONE: 503-956-4355 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: NEW Type of Const: VB Permit Fee COM-New Construction 03/05/2019 $2,156.42
Occupancy Grp: A-3 Occupancy Load: 259 12%State Surcharge-Building 03/05/2019 $258.77
Dwelling Units: 0 Plan Review 04/02/2018 $1,194.46
Stories: 1 Height: 25 ft DC Provision Review,COM New-Bldg 03/05/2019 $180.50
Bedrooms: 0 Bathrooms: 2 Plan Review-Fire Life Safety 03/05/2019 $862.57
Value: $399,369
Info Process/Archiving-Lg$2.00(over 03/05/2019 $142.00
11x17)
Info Process/Archiving-Sm$0.50(up to 03/05/2019 $295.00
11x17)
Floor Areas: Metro Const. Excise Tax 03/05/2019 $479.24
Total Area: 3342 Plan Review 03/05/2019 $207.21
Accessory Strutt: 0 Tig-Tual School CET-Non Residential 03/05/2019 $2,105.46
Basement: 0 Parks SDC Improvement 03/05/2019 $783.00
Carport: 0 Parks SDC Reimbursement 03/05/2019 $141.00
Wash Co Trans Dev Tax 03/05/2019 $5,778.00
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $14,583.63
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Yes Parapet: No 1 Special Inspection(see plans)
Fire Alarm: No Protected Corridors: No
Smoke Detectors: Yes Manual Pull Stations: Yes
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: / .111111111
1 7...x_e_.. Permittee Signature: ON A C 37 '70,1/
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each Inspection.
Building Permit Application
Commercial .4 f ' FOR OFFICE USE ONLY
City of Tigard l Received 7 7/ Z N u/o //4C>Ol3
I ��'� ` Plan Re iew Permit
u 13125 SW Hall Blvd.,Tigard,OR 97223 ' Plan Review
_ Phone: 503.718.2439 Fax: 503.598.19 „ ,,,4.,, .1,,--. Other Permit:
f,,,� i , �! DateBY: '��'
Inspection Line: 503.639.4175 Date Read4 Duds:
TIGARD ni\i „. F Y y: / 0 SeePage2for
Internet: www.tigard-or.gov l ..O N -.a 3 ' Notified Meth)o_d:,l �� �/� �t Supplemental Information
1�1 /' of /VG+`d4 t lips .4 —
1 TYPE OF W(RK .�, ). C - b, 1 ' ., EL
REQUIRE))DATA ]-A1VD 2-FAMILY DWELLING
®New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
..*;� ��_ work indicated on this application.
CATEGORY OF CONSTRUCTION
❑ 1-and 2-family dwelling 0 Commercial/industrial Valuation: $
®Accessory building El Multi-family Number of bedrooms:
0 Master builder ❑Other: Number of bathrooms:
ky X4 rt. JOB SITE INFORMATION.AND LOCATION Total number of floors:
Job site address:7790 SW Hunziker Rd New dwelling area: square feet
City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet
Suite/bldg./apt.no.:Bldg 3 Project name:The Fields Apartments Covered porch area: square feet
Cross street/directions to job site:SW Hunziker St&SW Wall St Deck area: square feet
Other structure area: square feet
REQUIRED_DATA:COMMERCiL-USE CHECKLIST.
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.:2S1010001600 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
�ix DESCRIPTION:(�oWO' x�, ' pp'
1 STORY WOOD FRAMED CLUBHOUSE WITH LEASING OFFICE AND Valuation: -132$379;89- Soto/ 36.7
AMMENITY SPACES , 1\I0 Ul-11i J
Existing building area: 0 square feet
New building area: 3342 square feet
of stories: 1
® PROPERTY OWNER ' mowti ❑ TENANT ,
Name:Fred W.Fields Revocable Living Trust do Miller Nash Graham&Dunn LLP Type of construction: VB
Address:111 SW 5th Ave,#3400 Occupancy groups:
City/State/ZIP:Portland,OR 97204 Existing: N/A
Phone:(503)205-2332 Fax:( ) New: B,A-3,S-2
® APPLICANT '`'*® COI ITACT PERSON , ” `` %BUILDINGrPERMft EES* ': "'' 1
. ,,, , P' .M. ;, t (Pleaie.fir to fee schedule) ..
Business name:Otak Architects,Inc Structural plan review fee(or deposit):
Contact name:Matt Neish,RA,AIA FLS plan review fee(if applicable):
Address:808 SW 3'd Avenue,Suite 300 Total fees due upon application:
City/State/ZIP:Portland,OR 97204
Amount received:
Phone:(503)415-2393 Fax::( ) tom,; eat,'
PHOTOVOL ",SOL, `PANEL SYSTEM FEES*
E -mail:matt.neish@otak.com Commercial and residential prescriptive installation of
;u CONTRACTOR - roof-top mounted PhotoVoltaic Solar Panel System.
`4 fit.. Submit two(2)sets of roof plan with connection details
Business name:DBG Properties LLC and fire department access,along with the 2010 Oregon
Address:2164 SW Park Place Solar Installation Specialty Code checklist.
Permit fee(includes plan review
City/State/ZIP:Portland,OR 97205 and administrative fees): $180.00
Phone:(503)816-4084 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lic.:201911 Total fee due upon application: $201.60
This permit application expires if a permit is not obtained
Authorized signature: within 180 days after it has been accepted as complete.
* Fee methodology set by Tri-County Building Industry
Print name:Matt Neish Date:3/29/2018 Service Board.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
Albert Shields
From: Albert Shields
Sent: Monday,April 9, 2018 5:27 PM
To: 'matt.neish@otak.com'
Subject: The Fields Apartments, BUP2018-00091, -00092, -00093, -00094, -00095, &-00096,and
SIT2018-00007.
Attachments: Albert Shields.vcf; Conditions Fields Apts - 04-09-2018.pdf
Matt, upon reviewing your applications and plans for the above permits for The Fields Apartments we note that most of
the Conditions of Approval for the underlying Land Use Case, PDR2017-00004 remain Not Met. I have highlighted on the
attached list the conditions that must be met before either a site permit or a building permit can be issued. Accordingly,
I have classified the SIT permit and these BUP permits as"Approved (for Plan Review) but Not Released." Plan Review
will proceed but the permits will not be released for issuance until the appropriate conditions have been met.
Please let me know if you have any questions.
Albert Shields
City of Tigard
Permit Coordinator
15;.;.3! 71E-242E Work
13125 SW Hall Blvd.
Tigard,Oregon 97217
www.tigard-or.gov
1
Branden Taggart
From: Branden Taggart
Sent: Thursday,January 03, 2019 2:56 PM
To: Matt Neish
Cc: #Building Permit Technicians
Subject: The Fields Apartments Buildings 3 & 6: BUP2018-00093, 96
Attachments: Branden Taggart.vcf; The Fields Apartments Buildings 3 & 6 Fees.pdf
Hello Matt,
The building permits for buildings 3 and 6 of The Fields Apartments are ready to issue now, and invoices of the fees due
are attached above. The total due is as follows:
The Fields Apartments: Buildings 3 and 6
Permit# Fees Due
BUP2018-00093 $ 13,389.17
BUP2018-00096 $ 916,101.82
Total: $ 929,490.99
Please note that we will modify the SDC fees once we receive the tax exemption status.
You may pay fees and pick up these permits in person between the hours of 8:00 a.m. and 4:30 p.m., Monday through
Thursday. We are closed on Fridays. If you have questions, please let me know.
Thank you,
Branden Taggart
PINa City of Tigard
■ 4 Senior Permit Technician
T
Community Development
13125 SW ltall'Blvd
Tigard,OR 97223
(503)718-2449'
brandent@ttga.rd-or.gov
1
City of Tigard
r COMMUNITY DEVELOPMENT DEPARTMENT
1111
TIGARD Building Permit Review — Commercial - With Land Use
Building Permit #: .gie '/ —Qpp 9.3rtut.17-t I'D
Site Address: -1 - - - - - — -1-7`1 b Suite/Bldg#: 3
Project Name: iii h G wS AfAFT-nA-K1 TC e (-14L.6)/* r—
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: ISV11.-171Q ruiciA latkA0A1
❑ Verify site address/suite#exists and active in permit s stem.
❑ River Terrace Neighborhood: ❑ Yes No
❑ Land Use Case#: PPR2ofl -0000$ CA-F-1-017- 0000S CS , nitirP 7-on - 00001
Plans Match Approved Land Use:
Site Plan ❑ Landscape Plan ❑ Other:
❑ Urban Forestry Plan pk Elevation Plan
Building Height: Maximum Height Actual Height /g
0 Conditions Met: p Prior to Submittal ❑ Prior to Permit Issuance
freSE Business License:
Exists: C'Yes ❑ No,applicant notified to obtain business license
❑ Public Facilities Improvement(PFI) Permit:
Required: [ Yes,applicant was notified ❑ No Applied For: [ Yes ❑ No,stop intake
Notes:
Approved by Planning: ex___„ 2.
C�s-�-y( oma` � Date: 1/ "l6
7
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 02�,fr
Site Plans: ## _ y'
Building Plans: # G/
Building Permit#: g"Enter building permit#above.
Workflow Routing: [Planning g—Engineering ❑-Permit Coordinator a'8iuiiding
Workflow Sign-off: Q—Sign-off for Planning(include notes from planning review)
Route Application Documents: Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
AF-I:By Permit Technician: .. Date: OAF-
I:\Building\Forms\BldgPennitRvw
\Building\Forms\BldgPermitRvw COM_WithL.andUse_060116.docx
Engineering Review 6 (�°'�
XSlope at building pad:
❑ PFI Permit#:
❑ Conditions "Met"prior to issuance of building permit
Cl Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
.- Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: El Yes -Et No
Assess Water Quantity Fee in-lieu: ❑ Yes er No
LIDA Facility on lot: ❑ Yes p-No
❑ NOT Approved by Engineering: �1 Date
Notes: HQ L� t)/tJ7'L(— 'PLAT- 12'1-00 0) tk mss' ` i/
q
Approved by Engineering: A(v L ` ) • Date: l l6
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved El Not Approved
Revision 3: El Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
5140 Approved,NOT Released: GGLL�Tii►�v� 7 Date: A/711/.7---.
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
SDC Fees Entered: Wash Co Trans Dev Tax: Yes CI /..00,)w+�
Cr�—
Tigard Trans SDC: El Yes ,N/A
Parks SDC: ›- Yes ❑ N/A
OK to Issue Permit
Approved by Permit Coordinator: ate: ` I Pilir'�
1:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_070915.docx