Loading...
Correspondence Albert Shieldsc-\ 14?) From: Albert Shields Sent: Wednesday, October 24, 2018 11:15 AM To: Mark VanDomelen; Dianna Howse; Mike White Cc: Tom McGuire; Khoi Le; Gary Pagenstecher;#Building Permit Technicians Subject: RE:The Fields Apartments - building permits Attachments: Fields Apts. Conditions - 10-24-2018.pdf Yes, Mark, both Planning and Engineering are OK with issuance of the Building Permits for the Fields Apartments even though there are conditions of approval of PDR2017-00004 that have not yet been met, including completion of infrastructure. It is my understanding that this is an exception to our normal operating procedure that was previously OKed by Kim McMillan. A list of the conditions is attached with the Not Met conditions highlighted. All, please let me know if this is NOT in agreement with your understanding of how we are handling these permits. Thanks,Albert Shields. From: Mark VanDomelen Sent:Wednesday, October 24, 2018 10:15 AM To:Albert Shields<albert@tigard-or.gov>; Dianna Howse<Dianna@tigard-or.gov> Subject: RE:The Fields Apartments- building permits Ok Albert.So planning and engineering or OK with issuing the Building permits? Thanks, Mark VanDomelen City of Tigard Building Official markv@tigard-or.gov 503-718-2448 From:Albert Shields Sent:Wednesday,October 24, 2018 9:58 AM To: Dianna Howse<Dianna@tigard-or.gov>; Mark VanDomelen<markv@tigard-or.gov> Subject: RE:The Fields Apartments- building permits OK, makes sense to me. I have no problem with it. Albert. From: Dianna Howse Sent:Wednesday,October 24, 2018 8:36 AM To: Mark VanDomelen<markv@tigard-or.gov> Cc:Albert Shields<albert@tigard-or.gov> Subject: FW:The Fields Apartments- building permits Mark, Here is the attachment that they referred to approval of permits"prior to plat recording". Thanks. Dianna L. Howse Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct I 503-718-2439 Permits From: Li Alligood<Li.Alligood@otak.com> Sent:Tuesday, October 23, 2018 4:53 PM To: Dianna Howse<Dianna@tigard-or.gov> Cc:Tom Hochstatter<TomH@ tigard-or.gov>; 17052<17052@otak.com>; Matt Neish<Matt.Neish@otak.com>; #Building Permit Technicians<TigardBuildingPermits(5 tigard-or.gov>;Albert Shields<albert@tigard-or.gov>; Gary Pagenstecher<Garvp@tigard-or.gov>; Kyle Childers<Kvle.Childers@otak.com>; Christina Kwiecienski <Christina.Kwiecienskit otak.com> Subject: RE:The Fields Apartments- building permits Hi Dianna and Albert, Our last communication on this question from the City was that the Building Official would issue vertical permits prior to plat recording—see attached. We have been moving ahead with the understanding that building permits can be approved and issued once site works permits are approved. Can you confirm? Thanks, Li Alligood, AICP, LEED AP ND I Senior Planner Otak, Inc. Direct:503.415.2384 I Cell: 503.449.7709 I Main: 503.287.6825 From: Dianna Howse<Diannaptigard-or.gov> Sent:Tuesday, October 23,2018 11:13 AM To:Christina Kwiecienski<Christina.Kwiecienski@otak.com> Cc:Tom Hochstatter<TomH@tigard-or.gov>; 17052<17052@otak.com>; Li Alligood<Li.Alligood@otak.com>; Matt Neish<Matt.Neish@otak.com>;#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>;Albert Shields <albert(a tigard-or.gov> Subject: RE:The Fields Apartments- building permits Hello Christina, Yes, building permits can be issued once the permit fees are paid, but this project is not yet ready for this step. Here is an update on the (6) building permits: • Building structural plan review is completed and fees are being assessed by plans examiner. • Permits are approved/not released pending approval by engineering and plat recording(per notes on each permit record). I have copied Albert Shields, permit coordinator, on this email. Please contact Albert for an update on outstanding conditions and when permits can be approved for release. 2 Please note that once the permits are approved for release, it will take us approximately 1 week,or more,to complete the following: • Building plans examiner to do the final review(based on the release notes from engineering and permit coordinator),fee assessment and routing to permit technicians for post-review. • Permit technicians will perform post-review where they review all permit documents including contractor information,confirmation and invoicing of permit and system development fees, preparation of site and office copies,etc.,and they will email the applicant when they are finished with post-review and the permit is deemed ready to issue, including an invoice with details of the balance due. Please keep in mind that the approximate timeline also depends on the number of other permits in the que to be processed for post-review ahead of this project as we process permits in the order received. The permit technicians always do their best to get permits processed in a timely manner. Thank you and please let me know if you have any further questions. Dianna L. Howse Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From:Christina Kwiecienski<Christina.Kwiecienski@otak.com> Sent:Tuesday, October 23,2018 10:20 AM To: Dianna Howse<Dianna@tigard-or.gov> Cc:Tom Hochstatter<TomH@tigard-or.gov>; 17052<17052@otak.com>; Li Alligood<Li.Alligood@otak.com>; Matt Neish<Matt.Neish@otak.com> Subject:The Fields Apartments-building permits Hi Dianna, I hope you are well. Our client for The Fields Apartments is requesting confirmation from the city that the building permits will be issued once the permit fees are paid. Is this something you can help with? Thanks! christina Oticchristina kwiecienski I designer 808 SW Third Ave., Suite 300 I Portland, OR 97204 Direct:503.415.2329 I Main: 503.287.6825 www.otak.com DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 3 CITY OF TIGARD 10/24/2018 . ! . 13125 SW Hall Blvd. 10:50:06AM T C; Ifi Tigard,OR 97223 (503)639-4171 Conditions Associated With Case#: PDR2017-00004 Project Name: Fields Property Residential Development --T'...,. ,----,7------ q " '-, " 'it , - . r mF- """ rte " a . t, TW, 1 i ;,k . `# DESCRIPTION a ,. A .. _ � � .` " TVAPPLIED BY ACTIONSY 01. TREE PROTECTION MEASURES Met 2/13/18 Gary Pagenstecher Gary Pagenstecher 01. Prior to any site work,the project arborist shall perform a site inspection for tree protection measures,document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the city manager or designee within one week of the site inspection. 02. SEMIMONTHLY ARBORIST REPORTS Continuing 2/13/18 Gary Pagenstecher Gary Pagenstecher 02.The project arborist shall perform semimonthly(twice monthly)site inspections for tree protection measures during periods of active site development and construction,document compliance/noncompliance with the urban forestry plan and send written verification with a signature of approval directly to the project planner within one week of the site inspection. 03. PAY FEE TREE PLANTING/EARLY Met 2/13/18 Gary Pagenstecher Gary Pagenstecher ESTABLISHMENT 03. Prior to site improvements,the applicant shall remit payment into the Urban Forestry Fund for tree planting and early establishment in the amount of$566 for providing one less street tree than is otherwise required. 04. TREE ESTABLISHMENT BOND Met 2/13/18 Gary Pagenstecher Gary Pagenstecher 04. Prior to site improvements,the applicant shall provide a tree establishment bond in the amount of $126,015(271 planted trees x$465/tree). 05. PAY URBAN FORESTRY DATA COLLECTION FEE Met 2/13/18 Gary Pagenstecher Gary Pagenstecher 05.Prior to site improvements,the applicant shall provide a fee to cover the city's cost of collecting and processing the inventory data for the entire urban forestry plan in the amount of$15,500($156+ $15,344($28/tree x 548 trees)). 06. SUBMIT REVISED PLANS/WALKWAY Met 2/13/18 Gary Pagenstecher Gary Pagenstecher 06. Prior to site work,the applicant shall submit revised plans showing at minimum a five-foot walkway connecting to Wall Street across Parcel 2. 07. SERVICE PROVIDER LETTER Met 2/13/18 Gary Pagenstecher Gary Pagenstecher 07. Prior to site work,the applicant shall submit a service provider letter from Pride Disposal verifying the proposed mixed solid waste and recyclable storage facilities meet applicable design and location criteria. 08. ADHERE TO CODES&STANDARDS/PUBLIC Met 7/2/18 Khoi Le Albert Shields INFRASTRUCTURES Page 1 of 8 # DESCRIPTION , ,' v ` . , ' k [ " .. ''' ` ., . ' '...' s.. . PPUE BY ACTION BY 08. Improvements associated with public infrastructures including street and right of way dedication, utilities,grading,water quality and quantity facility,streetlights,easements,easement locations,and utility connection for future utility extensions shall be designed in accordance with the following codes and standards: •City of Tigard Public Improvement Design Standards •Clean Water Services(CWS)Design and Construction Standards •Tigard Community Development Codes,Municipal Codes •Fire Codes •Other applicable County,State,and Federal Codes and Standard Guidelines 09. CITY ENGINEER APPROVAL/PUBLIC Met 8/15/18 Khoi Le Khoi Le INFRASTRUCTURES 09.Improvements associated with public infrastructures including street and right of way dedication, utilities,grading,water quality and quantity facility,streetlights,easements,easement locations,and utility connection for future utility extensions are subject to the City Engineer's review, modification,and approval. 10. PFI PERMIT REQUIRED Met 4/10/18 Mike White Gloria Pinzon-Marin 10.Prior to commencing site improvements,a Pu lic Facility Improvement(PFI)Permit is required for this project to cover all infrastructure work includin stormwater Water Quality Facility and any other work in the public right-of-way.Four(4)sets of detailed public improvement plans shall be submitted for review to the Engineering Department.An Engineering cost estimate of improvements associated with public infrastructur s including but not limited to street,street grading, utilities,stormwater quality and water qu ntity facilities,sanitary sewer,streetlights,and franchise utilities shall be required at the time of FI Permit submittal.Engineering cost estimate of water improvement shall be listed as a separate li a item from the total cost estimate.NOTE:these plans are in addition to any drawings required by he Building Division and should only include sheets relevant to public improvements.Public Facility Improvement permit plans shall conform to City of Tigard Public Improvement Design Standards,which are available at City Hall and the City's web page(www.tigard-or.gov). 11. EXACT LEGAL NAME ON PFI Met 8/15/18 Khoi Le Mike White 11.Prior to commencing site improvements,submittal of the exact legal name,address and telephone number of the individual or corporate entity who will be designated as the"Permittee",and who will provide the financial assurance for the public improvements.For example,specify if the entity is a corporation,limited partnership,LLC,etc.Also specify the state within which the entity is incorporated and provide the name of the corporate contact person. Failure to provide accurate information to the Engineering Department will deay processing of project documents. 12. CONSTRUCTION VEHICLE PARKING&ACrCESS Met 7/2/18 Khoi Le Albert Shields PLAN/PFI PHASE 12.Prior to commencing site improvements,the Applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer.The purpose of this plan is for parking and traffic control during the public improvement construction phase.All construction vehicle parking shall be provided onsite. No construction vehicles or equipment will be permitted to park on the adjoining residential public streets.Construction vehicles include the vehicles of any contractor or subcontractor involved in the construction of site improvements or buildings proposed by this application,and shall include the vehicles of all suppliers and employees associated with the project Page 2 of 8 # DESCRIPTION .. . �. A�: • 0 .t: RIT"Y PPL, I BY�, ACTION BY 13. PHOTOMETRIC ANALYSIS/HUNZIKER RD& Met 8115/18 Khoi Le Mike White WALL ST 13.Prior to commencing of site improvements,the Applicant shall provide Engineering Division a photometric analysis for Hunziker Rd and Wall St for the review and approval. If new streetlights are required based on the photometric analysis,the Applicant shall submit plans showing the location of streetlights to Engineering Division for review and approval.Type and color of pole and light fixture shall also be included on the plan for review and approval. 14. SUBMIT PLANS FRONTAGES OF Met 4/10/18 Mike White Gloria Pinzon-Marin HUNZIKER/WALL ST/76TH AVE 14(a). Prior to commencing of site improvements,the Applicant shall submit plans as part of the PFI Permit showing the following items along the proposed development frontages to Engineering Division for review and approval: Hunziker Rd(for the length of the subject property's frontage): •37-foot from centerline right of way dedication •8-foot PUE •24-foot from centerline pavement construction meeting the Collector St standard cross section •Curb and gutter •5-foot planter •8-foot concrete sidewalk •Street trees in planter strip spaced per TDC requirements •Street lights per approved photometric analysis •Driveway approach per City Standard Detail for Commercial Driveway •Pavement and curb transition •Storm drainage improvement including but not limited to reconstructing existing storm drainage system meeting Clean Water Services Design and Construction Standards •Water quality treatment for runoff from new roadway and sidewalk •Street signs, names and traffic control devices,striping meeting the Manual of Uniform Traffic Control Devices(MUTCD)and the City of Tigard Standards •Mail boxes if applicable 14. SUBMIT PLANS FRONTAGES OF Met 4/10/18 Mike White Gloria Pinzon-Marin HUNZIKER/WALL ST/76TH AVE Page 3 of 8 StA US :WO ' ,... E C AC LI Y ACTION BY # DESCRIPTION ..a. .. . 14(b).Wall St(for the length of the subject property's frontage): •52-foot right of way dedication •8-foot PUE on north side of Wall Street •34-foot curb to curb pavement construction meeting the Collector St standard cross section •Curb and gutter on both sides of the street •5-foot planter •6-foot concrete sidewalk •Street trees in planter strip spaced per TDC requirements •Street lights per approved photometric analysis •Driveway approaches •Pavement and curb transition •Storm drainage improvement including but not limited to reconstructing existing storm drainage system meeting Clean Water Services Design and Construction Standards •Water quality treatment for runoff from new roadway and sidewalk •Street signs,names and traffic control devices,striping meeting the Manual of Uniform Traffic Control Devices(MUTCD)and the City of Tigard Standards •Mail boxes if applicable 76th Ave: •25-foot from centerline right of way dedication •8-foot concrete pedestrian path including bollards with solar lighting •Water quality treatment for runoff from new pe estrian path Along the property line northeast of the developm nt: •25-foot transportation and utility easement con ecting the dedicated 76th Ave right-of-way with Hunziker St. 15. COORDINATE STREET IMPROVEMENT PLANS Not Applicable 4/10/18 Mike White Gloria Pinzon-Marin 15.Prior to commencing of site improvements,the Applicant shall coordinate their street improvements plans with those being prepared by the City and the adjacent developer for both Hunziker and Wall Streets. 16. COORDINATE WITH CITY&TRIMET/ Met 8/15/18 Khoi Le Mike White PEDESTRIAN PATHS 16.Prior to commencing of site improvements,the Applicant shall coordinate with the City and Trimet to provide a safe and direct pedestrian route to the Bus Line#78,existing bus stop located in front of the apartment complex,TL 25101 DB00200,on Hunziker Rd.Relocating the bus stop and providing an onsite pedestrian path connecting the existing neighborhood and the apartment complex northwest of the site to Hunziker Rd are acceptable possibilities. 17. SUBMIT SITE PLANS/UNDERGROUNDIN Met 4/10/18 Mike White Gloria Pinzon-Marin 17.Prior to commencing of site improvements,submit site plans as part of the PFI permit indicating that all existing overhead utilities will be placed underground. 18. PAY FEE IN LIEU OF UNDERGROUND Met 8/15/18 Khoi Le Mike White 18.Prior to commencing of site improvements,pay the fee in lieu of underground for the existing low voltage utilities located across the right of way on Hunziker Rd.The fee shall be assessed in accordance with the City Master Fees and Charges Schedule. Page 4 of 8 , DESCRIPTION STATUS Y • .,. r T t.e'ri"r VERITY " APPLIED BY ACTION BY 19. SUBMIT FINAL TRAFFIC MITIGATION Met 2/13/18 Khoi Le Mike White METHODOLOGY 19. Prior to commencing of site improvements,the Applicant shall submit the final traffic mitigation methodology and the construction estimates of the interim mitigation and the development cost sharing,toward the future permanent improvement in accordance with the Transportation System Plan(TSP)at Hall and Hunziker,and Hunziker and Scoffins intersections for review and approval. 20. SUBMIT FINAL STORMWATER FACILITY Met 4/10/18 Mike White Gloria Pinzon-Marin REPORT 20. Prior to commencing of site improvements,the Applicant shall submit a final storm drainage report to Engineering for review and approval.The report shall be prepared im accordance with Clean Water Services Design and Construction Standards and shall include evidences on how stormwater run-off from the proposed development is going to be captured,conveyed,treated and detained. The report also must address how abutting storm drainage on SW Hunziker Rd and Wall St,as well as the existing neighborhood located upstream from the site is going to be handled.The report shall also include a maintenance plan for all the stormwater treatment and detention facilities per the CWS Design and Construction Standards. 21.SUBMIT PLANS/STORMWATER FACILITY Met 7/2/18 Khoi Le Albert Shields 21. Prior to commencing site improvements,the Applicant shall submit design plans for the onsite and offsite stormwater facilities meeting the Clean Water Services Design and Construction Standards. Additionally,the stormwater design must meet applicable Federal(SLOPS V)Standards as required by the wetlands fill permit issued by the US Army Corps of Engineers 22. CWS STORMWATER CONNECTION Met 8/8/18 Khoi Le Mike White AUTHORIZATION 22. Prior to commencing site improvements,the Applicant shall obtain a CWS Stormwater Connection Authorization.Prior to issuance of the Public Facility Improvement Permit,plans shall be submitted to the City of Tigard for review.The city will forward plans to CWS after preliminary review. 23. TVF&R APPROVAL Met 8/8/18 Khoi Le Mike White 23. Prior to commencing site improvements,the Applicant will be required to provide written approval from Tualatin Valley Fire and Rescue for fire flow,hydrant placement and emergency vehicular access. 24. SUBMIT PLANS/MAINS ET.AL Met 4/10/18 Mike White Gloria Pinzon-Marin 24. Prior to commencing of site improvements,the Applicant shall submit a plan showing the location of all new mains,fire hydrants,services,meters,vaults,and associated water facilities to Engineering Division for review and approval. 25. SUBMIT PLANS/SANITARY SEWER Met 4/10/18 Mike White Gloria Pinzon-Marin 25. Prior to commencing of site improvements,the Applicant shall submit a plan showing the location and connection of all new sanitary sewer mains,extensions,stub outs,and services to Engineering Division for review and approval.All public sanitary sewer facilities and associated services shall be designed in accordance with CWS Design and Construction Standards. 26. EROSION CONTROL PLAN Met 4/10/18 Mike White Gloria Pinzon-Marin Page 5 of 8