Loading...
Permit CITY OF TIGARD BUILDING PERMIT 111 COMMUNITY DEVELOPMENT Permit#: BUP2018-00094 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/06/2019 Parcel: 2S1010001600 Jurisdiction: Tigard Site address: 7820 SW HUNZIKER RD Project: The Fields Apartments-Building 4 Subdivision: FIELDS APARTMENTS Lot: None Project Description: Building 4-New 48-unit apartment building. Contractor: DBG PROPERTIES LLC Owner: FIELDS, FRED W REVOCABLE LIVING 2164 SW PARK PLACE 111 SW 5TH AVE#3675 PORTLAND,OR 97205 PORTLAND, OR 97204 PHONE: 503-956-4355 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: NEW Type of Const: VB Permit Fee-COM-New Construction 03/05/2019 $27,327.36 Occupancy Grp: R-2 Occupancy Load: 200 12%State Surcharge-Building 03/05/2019 $3,279.28 Dwelling Units: 48 Plan Review 04/02/2018 $14,867.63 Stories: 4 Height: 55 ft DC Provision Review,COM New-Bldg 03/05/2019 $180.50 Plan Review-Fire Life Safety 03/05/2019 $10,930.94 Bedrooms: 92 Bathrooms: 64 Info Process/ArchivingL $2.00 Value: $6,005,699 g (over 03/05/2019 $164.00 11x17) Info Process/Archiving-Sm$0.50(up to 03/05/2019 $301.50 11x17) Floor Areas: Metro Const.Excise Tax 03/05/2019 $7,206.84 Total Area: 55296 Tig-Tual School CET-Non Residential 03/05/2019 $31,400.00 Accessory Strutt: 0 Additional Plan Review 03/05/2019 $800.00 Plan Review 03/05/2019 $2,895.15 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $99,353.20 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: No Fire Alarm: Yes Protected Corridors: Yes Smoke Detectors: Yes Manual Pull Stations: No Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: • v Permittee Signature: G,A' Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the Job site at the time of each inspection. Building Permit Application Commercial , ` , Commercial ,...... _ h ' , i, FOR OFFICE USE ONLY Cityof Tigard Received 4.71 1312SW Hall Blvd.,Tigard,OR 97223A la 1.�4 Date/B : C�i r PermitN '14, _ Plan Review Phone: 503.718.2439 Fax: 503.5981,9.0 i , Date/By: •^�_ ♦ .J, Other Permit: T I G A R Inspection Line: 503.639.4175 r 9 i Date Ready By: Ju is: ® See Page 2 for Internet: www.ti and-or. ov 1 1 '° ;��yy r+ 3 1 g g BUILD!z t,.,a F.1 cv ;°`4 Notified/Method: r , , Supplemental Information ;, �• , /n,z Jh:�N ; �' rT EF WO .. w u '4` REUIRED DATA 1 AND 2-FAM ILY DWELLING x<,; ®New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the ' '`'" work indicated on this application. &, CA'l EGO%.Y OF CONSTRUCT ON Vis' PP 0 1-and 2-family dwelling 0 Commercial/industrial Valuation: $ ❑Accessory building ®Multi-family Number of bedrooms: ElMaster builder 0 Other: Number of bathrooms: Z `` Total number of floors: - JB SITE IJVFORMA'T, ON�fN _ 'OCATION Job site address:7820 SW Hunziker Rd New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:Bldg 4 Project name:The Fields Apartments Covered porch area: square feet 1 Cross street/directions to job site:SW Hunziker St&SW Wall St Deck area: square feet Other structure area: square feet R'RFQ 1>,2FI`RATA:COMMERCIAL-USE CHECKLIST.: Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:2S1010001600 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the , uSCRIPT ON F owe . ' work indicated on this application. 4 STORY WOOD FRAMED APARTMENTS / lrj tJ ITS Valuation: $gr5,013,132 0f 40,4-,o�''S!� 1 Existing building area: 0 square feet New building area: 50848 square feet f ® PROPERTY OWFR t ;� • E*Isi , Number of stories: 4 Name:Fred W.Fields Revocable Living Trust c/o Miller Nash Graham&Dunn LLP Type of construction: VA Address:111 SW 5th Ave,#3400 Occupancy groups: City/State/ZIP:Portland,OR 97204 Existing: N/A Phone:(503)205-2332 Fax: ( ) New: R-2 's Et tiAPPLICAZT :> ® ONT CTTERSON a 1 0• S'"' ,BUILDING'I'EIt1Y1ITt.EES# k. Business name:Otak Architects,Inc µ ,,,, (Pease refer to fee sch ule) ;',044, Structural plan review fee(or deposit): Contact name:Matt Neish,RA,AIA Address:808 SW 3rd Avenue,Suite 300 FLS plan review fee(if applicable): City/State/ZIP:Portland,OR 97204 Total fees due upon application: Phone:(503)415-2393 Fax::( ) Amount received: E-mail:matt.neish@otak.com PI OTOVOL1tAYIC-,SOLAR PA1 EL SYSTEM FEESS* �`� �• "�• CONT�C'I;yQR ) � ,` �` Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name:DBG Properties LLC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:2164 SW Park Place Solar Installation Specialty Code checklist. City/State/ZIP:Portland,OR 97205 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)816-4084 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:201911 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Matt Neish Date:3/29/2018 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 Albert Shields From: Albert Shields Sent: Monday,April 9, 2018 5:27 PM To: 'matt.neish@otak.com' Subject: The Fields Apartments, BUP2018-00091, -00092, -00093, -00094, -00095, & -00096,and SIT2018-00007. Attachments: Albert Shields.vcf; Conditions Fields Apts -04-09-2018.pdf Matt, upon reviewing your applications and plans for the above permits for The Fields Apartments we note that most of the Conditions of Approval for the underlying Land Use Case, PDR2017-00004 remain Not Met. I have highlighted on the attached list the conditions that must be met before either a site permit or a building permit can be issued. Accordingly, I have classified the SIT permit and these BUP permits as"Approved (for Plan Review) but Not Released." Plan Review will proceed but the permits will not be released for issuance until the appropriate conditions have been met. Please let me know if you have any questions. Albert Shields City of Tigard Permit Coordinator i5;'3; 71E-232E Work 13125 SW Hall Blvd. Tigard,Oregon 97217 www.tigard-or.gov 1 Branden Taggart From: Branden Taggart Sent: Thursday, November 01, 2018 4:25 PM To: 'Christina.Kwiecienski@otak.com' Cc: 'matt.neish@otak.com';#Building Permit Technicians Subject: The Fields Apartments Buildings 1,2,4,5: BUP2018-00091,92,94,95 Attachments: Branden Taggart.vcf; The Fields Apartments Building Permit Fees.pdf Hi Christina, The building permits for The Fields Apartments buildings 1, 2,4, and 5 are ready to issue now. The fees due are as follows: The Fields Apartments Building# Permit# Fees Due 1 BUP2018-00091 $ 386,949.48 2 BUP2018-00092 $ 329,807.04 4 BUP2018-00094 $ 350,069.57 5 BUP2018-00095 $ 393,471.09 Total: $1,460,297.18 Due to the amount of each building permit, we ask that you pay with a check. We will let you know when the permits for the remaining two buildings are ready to issue. Please let me know if you have questions. Thank you, Branden Taggart q City of Tigard M„ Senior Permit Technician Community Development 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 bra nd ent` tgard-o r.gov 1 City of Tigard 111 COMMUNITY DEVELOPMENT DEPARTMENT ■ T I G A R D Building Permit Review — Commercial - With Land U s e Building Permit #: ,j tt./20/c C7© Site Address: 7$2o sw 1lvt\tiA D Suite/Bldg#: 4 Project Name: ATA-124-01t--S' (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: t3VkD114(-7 h,At.J 12-MV1OW ❑ Verify site address/suite#exists and active in permit system. 0 River Terrace Neighborhood: ❑ Yes X No ❑ Land Use Case#: 17*20t7 -00001- , ,R,201,.0000g MVP2oITJ -ocoocl F.Plans Match Approved Land Use: Site Plan ❑ Landscape Plan ❑ Other: ❑ Urban Forestry Plan 5r1 Elevation Plan ig:l Building Height: Maximum Height t-t'Cj Actual Height YV ix Conditions Met: ig Prior to Submittal ❑ Prior to Permit Issuance 5 Business License: Exists: Or Yes ❑ No,applicant notified to obtain business license ❑ Public Facilities Improvement(PFI) Permit: Required: 5(Yes,applicant was notified ❑ No Applied For: E ,'Yes ❑ No,stop intake Notes: Approved by Planning: Date: --2, Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: y/00fr Site Plans: Building Plans: Building Permit#: ""Enter building permit#above. Workflow Routing: [Planning Er-Engineering Permit Coordinator Building Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: /2' `__, Date: L ' / I:\Building\Forms\B1dgPermitRvw_COM_WithLandUse 060116.docx Engineering Review -Slope at building pad: 6 7 ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes la No Assess Water Quantity Fee in-lieu: ❑ Yes 5 No LIDA Facility on lot: ❑ Yes 7.-'No ❑ NOT Approved by Engineering: Date Notes: /1151.) l)/l3j1 L (Pak S. Approved by Engineering: at(c< Date: �"( let Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: El Approved ❑ Not Approved Revision 3: ❑ Approved El Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permitr' ,�,/ Approved,NOT Released: 4.44.- .c, %in llcei:e / ate;6/9/! Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: (NZCDC Fees Entered: Wash Co Trans Dev Tax: r 'Yes El N/A Tigard Trans SDC: ,b N/A Parks SDC: -Yes ❑ N/A OK to Issue Permit Permit Coordinator: /Q�° Date: /t7 i Approved by Per t Coo d ?-� I:\Building\Forms\BldgPennitRvw_COM_WithLandUse_070915.docx