Loading...
PFI2019-00038 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT M • COMMUNITY DEVELOPMENT Permit#: PF12019-00038 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 01/31/2019 TIGARD Parcel: SEG3971 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to 10900 SW 121st Ave. Install street light on poles and energize. PGE job M2567866. Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX. Applicant: RODRIGO SOLIS 10800 SW AVERY ST TUALATIN; OR 97062 PHONE: 503-672-5417 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application • � Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00038 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work. effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation; FHWA, current edition, American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District) and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12- UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City ofTigard JAN 3 0 2019 :11M PUBLIC WORKS — ENGINEERING CITY OF TIGARD Public FacilityImprovement ( PW TIGARD TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) TYPE 1—Franchise Utility Work Check one: VUtilities ❑Sidewalk/driveway approach ❑Streetimprovements performed by NWN, PGE Detailed description: Install street lights on poles & energize and/or utility agency. El TYPE 2—Sidewalk/Driveway/Sewer PGE Job M2567866 Work performed for the purpose of: • Sidewalk installation or repair. Property address/location(s): 10900 SW 121ST AVE • Driveway approach installation and/or repair TIGARD, OR, 97223 / • Sanitary sewer lateral installation and/or main line tap Applicant: PGE [Submitted by Amy Sweany] ❑ TYPE 3–Full scale Development pp Work performed with Land use Address: 10800 SW Avery Street approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-612-2935Email: Preregcoord@pgn.com • Subdivisions or Partitions Contact name: Rodrigo Solis Phone: 503/672-5417 • Street widening • Mainline installation for Sanitary Contractor: Portland General Electric sewer, Storm sewer, Tigard water and/or Tigard Water Service Area CCB#: Expiration: Address: 10800 SW Avery Street SUBMIT COMPLETED APPLICATION TO: City/state: Tualatin, OR Zip: 97062 City of Tigard ig Phone: 503-464-7777 Email: Preregcoord@pgn.com P /Engiaee 13125 SW Hall Blvd. Contact name: Phone: Tigard,OR 97223 Applications for"minor work in right-of-way" Engineer: N/A only may be emailed to: g rowpermits(iltigard-or.gov Address: City/state: Zip: 1111111111111 Phone: Email: Case No.: PF1•20/Ci ow)3 g Contact name: Application submittal fee(.007%of Engineer's Estimate) $ JO' Estimated value of work is required(if over$5,000):$ Additional fees: $ (within the public right-of-way) Application accepted: By: “ Date:_1431)/4 Is work related to a LAND-USE DECISION. ❑ Yes tiNo If so,please specify (MLP,SDR,SUB, etc.) case #: App�'�'i'��` • By 111111011 Date: //..V Is work related to a BUILDING PERMIT? ❑ Yes No Ap.licak.S. nt notified: If so,please specify(BUILDING PERMIT)case#: By: Date:. I i ii9 I:\ENG\PertnitApplications\pfi_application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. 428x0-P Q41 Aroun Xaybanha 01/30/7019 Applicant/Authorized*nes signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page2of4 DEVELOPMENT ENGINEERING FEES FOR SLUT t'SL ONLY Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL APPLICATION FEE REQUIREMENTS Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5% (less$300.00 minimum submittal fee) Sketch (including information below) Engineer's estimate X 2%Plan Review ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. 0 General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance Cl Landscaping/Tree Plan • Test wells El Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance may be ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate �...+m'w'§*s;_-�eQ�.t,ti:�4tis.��`- 'F idRa'Ab�,'k•'v:^•.-E'si �Y{d.f2F.a. xH+Sae:rkzr .w e4ri4FSCm•."�::-. _,,:. ,. ,.o-x,a. , a�E.:Yr:�Gri.vr..Jrx�:>swi.mgsa:.`satr#a,ae�.3�.ticxa�WG..w3e..w:. . r_..r:.. nr........ ,=v..w,...,•;r.: PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of SAMPLE SKETCH: CI) 11- '• y 1 I Edge of Pavement I Ditch —�� ' Streffetlight I ��—.—•i•—.—.—.—•ylr .— 1 1 1 4. t f � ti • r ' Tl-ro osfd''Sel�wer' ii'ne" I I P q, - - 0) I i I al I u)1 Existing House Existing I1 Driveway . I of I 1 I iI I 11I I ,; il I I 6I Existing Shop iA 5, \b I 1 _,= • Poerpole . I - I a o • o !a 95' r I I pm I I (5 IN I Fire Hydrant(FH) I I 1I • ! Scale: 1"=30' I I I I ! I I I ' I I MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable): North arrow Property lines &dimension Slope of property Street &street name(s) Existing building, structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 2 PIECE FIBERGLASS (COMPOSITE)POLE — r____ P.. JUNCTION BOX INSTALLATIONS LIGHTING LEGEND nnsnig T� �51e, -_.\ FOR STREET LIGHTING Taped kr �!I o..,sh,b � I CONTACT PGE FOR APPROVED MANUFACTURERS (UNLESS OTHERWISE SPECIFIED) Side orcpndud \'I FINAL GRADE IF HARD SURFACE(FLUSH) INSTALL 1-1/0 AL-TX ST LT CIRCUIT IN 1-3"SCH40 PVU REPLACE 67W LED WITH 45W LEC III Aso FINAL GRADE IF SOFT SURFACE �, CONDUIT,PROVIDED&INSTALLED BY CUSTOMER Pole 4'Abr`• INSTALL 1410 CU-TX ST LT CIRCUIT IN 1-1e SCH40 PVC Stub Finish Geode PD-81 T --y� x'fpOUND R9D 13k24-s19 DEEP OR - CONDUIT.PROVIDED&INSTALLED BY CUSTOMER LEOTEK,CONNECT 240V Section �I 11 I l r 1 I� us.o EE eV 1<..-1P2,1:',2: PGE APPROVED Q CUSTOMER INSTALLED 1730 SECONDARY VAULT I 1 I JUNCTION BOX - ''- ' �I� II! OETERMINEO BY PGE emu r k`°"ErO� III INSTALL 47W LED CREE LIGHT • r Belo..Finvh Grade 6"RADIUS"END" III I ON 30'BRONZE FIBERGLASS POLE (25'MTG HG 42T laea krn !I I 0 WITH 8"MAST ARM,SET 2'FP-FC,CONNECT 240 VOLTS 25-4 PD AF 1'PVC SGH 40 ELECTRICAL GRADF �,/ TO OPTIONAL ST LT POLE 1990 A 25 52594 /// T_ - lk CONSTRUCTION NOTES: SLCST A ' 36'ltodivs PS..s I I 2.OR 3`PVC SCH 40 'SCH 40 GREY PVC FACTORY BENDS 1. CUSTOMER TO PROVIDE ALL TRENCHING,BACKFILLING.CONDUIT.ELBOWS.JUNCTION s..nk+re ' D.pend�,g nr M.+„no„on + ELECTRICAL GRADE (STEEL OR PGE APPROVED FIBERGLASS au ire: 1I FOR RUNS OVER 150',OR 100 DEGREES BOXES,VAULTS AND PADS.JOINT USE TRENCH WITH GAS,TRENCH TO BE ._._ Crushed Rack 10 t i. 1)I(DETERMINED BY PGE OR MORE IN BENDS) 48 INCHES DEEP AND 30 INCHES WIDE,MEASURED FROM FINAL GRADE. -' --'-•� Cl 1-34B TOP NEW 6`OF COMPACTED 2. A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS 3/4"MINUS BACKFILL ; BOTTOM PIECE POLE INSTALLATION I ' ° e AROUND AND JUNCTION BOXES AND EQUIPMENT/FACILITIES,INCLUDING CONNECTION OR INSTALLATION I, UNDER SPUCE BOX OF CONDUITS AND PULL STRINGS.CALL SERVICE COORDINATION AT 503-323-6700 Q ' I ,toY4 ped -inch miecrushedncrushed rock bockhll I f CZ T i-. a,owed around on poles and footings0) repordleu coNGUfi TO SCHEDULE A PGE STANDBY CREW. of sod con...,to ma,rna,r II-_-_,� -• 3. ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL I - GRADE.PVC CONDUIT WITH NYLON PULL STRINGS (MIN.500 LBS.TEST) . -J N ProPe,PoN afgn t Room �. _ PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED. < V. I 2 00.-82.M.34'sheet mo•dKnew. MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN S I PUB n 02522)M,pan h a 0h po.rap I .. ry.,, \ GAS AND OTHER UTILITIES. ALL ELBOWS 4 INCH&SMALLER TO BE 36 INCH RADIUS. 3 1 uod>d6 b prevent ob an of pole e p I � RIGID STEEL OR PGE APPROVED FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF 0 (0) j I _ -- I y 151 FEET OR LONGER,OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES o IN BENDS.PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR m J ¢ ; 6 7 8 I 15 0o LESS.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES.ALL op < 1 BENDS MUST BE FACTORY MADE.REFER TO LETTER OF RESPONSIBILITY FOR nt ¢ 1 FD-A. PD-84 9 I Z FURTHER DETAILS. Q PD-� / I 0 4. ALL CONCRETE FOOTINGS NEED TO BE INSTALLED WITH TOP OF BASE Q I VT 91 150. a SO ]( I FLUSH TO CURB 1 SIDEWALK. I K__ Q 1� 5. CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS. ALL CROSSINGS MUST EXTEND FROM PROPERTY LINE TO PROPERTY LINE.CROSSINGS TO BE 48 INCHES DEEP, r � ,20' "=cif VT 92 109 MEASURED FROM FINAL GRADE. \ (ld 310' e1 -4J `II i;I; 105' 20, 6. DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE (HIGH DENSITY POLYETHYLENE) DUCT FI �I, OR SCHEDULE 40 PVC WITHCONNECTION nA MECHANICAL CONNECTION (CERTA-LOK OR LIKE MECHANICAL I PL 96 PL 98)( :; ` PL 97 x PL 99 20420 4 REQU AS AN REMENTS OFF PGE SPECIFICATIALTON LC20515RNATIVE 0 ADPE DUCT.HDPE SHALL VAILABLE ON REQUEST FROT THE M PGE PROJECT )11 ® WI I 2V-4 • MANAGER .FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE \11 EXTRUDED RED STRIPES (WHICH ISA SPECIFICATION REQUIREMENT) .MANDREL TEST OF 1,- 30'I�Z 250• 20 1986 HOPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT. •-��-�,r..�e.�,a-,tom , VT 93 7. TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 2 INCHES ABOVE VT-21 VT 94 T FINAL GRADE. CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL ///�`� I PD-86 ----'I AND TO EXTEND 1 INCH ABOVE THE PAD. RD-n1 PD085 ;, ,�r,; 8. ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIM FROM ANY COMBUSTIBLE 03 BUILDING,WALL OR OVERHANG AND 4 FEET(MIM FROM ANY FIRE HYDRANT. Nt 10900I PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA. D 1 2 3 4 195' ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. PD-23 5 I 9. STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED B 15 42805 I TO VEHICLES. •I I 10.AS NEEDED-FRONT LOT PUBLIC UTILITY EASEMENT(P.U.EJ TO BE 8 FEET(MIM . Q r.' 20,PL 100 10 FEET(PREFERRED) . 11. CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING MAIN POWER 0 VT 95 TRENCHING FOR A PRECONSTRUCTION CONFERENCE. INCLUDED IN THIS CONFERENCE ' 14 WILL BE EXCAVATOR,PGE,TELCO.CATV,AND GAS. 25'-4 -M 4 12. CUSTOMER TRENCH AND ELBOW CONFIGURATIONS,ALL CONDUIT,VAULT AND PAD INSTALLATIONS MUST BE INSPECTED BY PGE PRIOR TO BACKFILLING.WHEN YOU ARE 1990Cl 1-34 XREADY FOR PGE TO INSPECT(AFTER INSTAL!VTION IS COMPLETE) CALL 503-736-5450 11000 11060 11070 11035 OR 5033-463-4348 (SALEM AREA) ALLOW UP T '/ORKING DAY FOR INSPECTION TO OCCUR. CONTACT SERVICE COORDINATOR 4182E. REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC REQUIREMENTS, /ifFOR TRENCH AND CONDUIT INSPECTION PRIOR 13. DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NON-STANDARD UNDER- - TO BACKFILL.PGE WILL NOT INSTALL WIRE GROUND EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER. TRENCH 100% REPLACE 67W LED WITH 45W LED - UNTILSERVICECOORDIANATORc PGE CONSTRUCTION DRAWING 503-323-6700 OR 800-542-8818 DATE 11/28/2018 SCALE NTS (ACC0UNT:1070001 I AWD 1000004600 1308 NO.M2567866 LEOTEK,CONNECT O 240V TITLE ANY DEVIATION FROM THIS DESIGN MUST Kerr Contractors Inc/City of Tigard/Summerbrook BE APPROVED BY PGE PROJECT MANAGER CIRCUIT SIZE PROGRESS-GREENBURG 11x17 ATTENTION: CALL 811 BEFORE YOU DIG PGE LOCATION - _ THINK OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED 10900 SW 121st Ave,TIGARD BY THE OREGON UTILITY NOTIFICATION CENTER. ` DESCRIPTION Install 5-17W LED CREE.lights on 30'2 PC(0 Bronze poles(MII 25'MH)a/0"MA,& SAFETY NOTE: THOSE RULES ARE SET FORTH IN OAR 952-001-0010 replace fixtures from 67W to 45W LED LEOTEK connect 240v PGE TO PROVIDE BOTTOM PIECE OF POLE FOR CUSTOMER THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF COUNTY SECTION(S) WORK WITH SHEET FIRST! TO INSTALL AT THE SAME TIME AS THE CONDUIT. THE RULES BY CALLING THE OREGON UTILITY a WASHINGTON B M2567640 NOTIFICATION CENTER ADMINISTRATION t (503-232-1987) ` BEAVERTON 1 OF 1 INSTALL 30AMP FUSES IN SECONDARY PEDESTALS OR SECONDARY LINE CREW CENTER DESIGN BY PHONE(503) DRAWN BY VAULTS (WHICHEVER IS ST LT POINT OF ATTACHMENT) FOR EACH 0 REQUEST UTILITY LOCATES CALL THE OREGON Know what's below. 2213 SW 153RD DR Rodrigo Solis 672-5417 LANE WHITNEY STREET LIGHT PER PGE T&D CONSTRUCTION STANDARD LC-11550 UTILITY NOTIFICATION CENTER,811 AT LEAST C �l before di BEAVERTON,OR 97006 p 2 BUSINESS DAYS PRIOR TO EXCAVATION. you g. 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED Page 84 2011 Edition • Stationary Lane Closure with Flagging Diagram 320 • Diagram 320 covers total closure of one lane of a two-lane, two-way N roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4)should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the "Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 December 2011 2011 Edition Page 85 N r co Stationary Lane Closure with Flagging Diagram 320 N / \ G Q is R\ _ fi 4773 In / Q2 ' ) O w U o CC V L Ca Et 0 * I t LL mw o m 3 a_co Lu OaT � I w N .' me •. Dov. 1 4> �X • c-c co -45- .'g 40 mlIt I % gym m • • i ¢ m /./z . .( --„ , . 11 _ 1 .. IF • 11 ......,, olo •• Es (0i l l._ • • 1\ . . F- 0) ±!gg, /' cdoQ I I LL -0 Yo L m V w aEt 0 UI� I Y. ma � 1 1 r / ° °CC o CO o a1- CO Sign Spacing and Buffer Lengths(feet) t w o. s Posted Spacing Between Signs Buffer p O Speed A B C Space V z°C EL oO 20 50 \ 25 100 100 100 75 30 1 100 35 ' 125 0Y°QQ 40 350 350 350 150 O 0 45 180 CC 50 500 500 500 210 55 250 December 2011 Chapter 5