Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PFI2019-00004
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 11111 COMMUNITY DEVELOPMENT Permit#: PF12019-00004 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2421 Date Issued: 02/06/2019 Parcel: SEG2349 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: SEG 2349/2270/2312/2338. Bore/trench to install new underground primary cable. Owner: FEES Description Date Amount PFI Permit Fee 02/06/2019 $745.00 PHONE: Contractor: POTELCO INC 14103 STEWART RD SUMNER, WA 98390 PHONE: 253-863-0484 FAX: Applicant: PHIL MERRIMAN 10800 SW AVERY STREET TUALATIN, OR 97062 PHONE: 503-963-6943 Total $745.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00004 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD] for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07 -TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue) and to 503-962-8140 (Tri-Met) and 503-431-2345 (Tigard School District) and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12- UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13- UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work (pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI Utilities 15- REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads, ditches, etc.) as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16- PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name> at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17- NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four (24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. Call Ken Fisher at 503 816 6146 or Kenny@tigard-or.gov PFI Utilities 18- PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19- MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20- EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two (2) persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard JAN 0 7 20\9 IIal PUBLIC WORKS — ENGINEERING cm( t. F T1GARD Public Facility Improvement PFI Pertjif ` ER1NG TIGARD TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) VTYPE 1—Franchise Utility Work Check one: 'Utilities ❑ Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE Detailed description: Bore/trench to install new underground and/or utility agency. primary cable ❑ TYPE 2—Sidewalk/Driveway/Sewer / Work performed for the purpose of: PGE Job M2495607 02110D _ • Sidewalk installation or repair. 15 8 5 0 S W HIGHLAND C T • Driveway approach installation Property address/location(s): and/or repair TIGARD, OR, 97224 • Sanitary sewer lateral installation 56C231441/ 2210 123(22 1 233 , and/or main line tap ❑ TYPE 3—Full scale Development Applicant: PGE [Submitted by Amy Sweany] Work performed with Land use Address: 10800 SW Avery Street approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-612-293.5 Email: Preregcoord@pgn.com • Subdivisions or Partitions Contact name: Phil MerrimanPhone: 503-963-6943 • Street widening • Mainline installation for Sanitary Contractor: Potelco, Inc. sewer, Storm sewer, Tigard water 76668 and/or Tigard Water Service Area CCB#: Expiration: Address: 38884 Pacific Highway SUBMIT COMPLETED APPLICATION TO: City/state: Hubbard, OR Zip: 97032 City of Tigard -389-4936 aborden oteleo.net Planning/Engineering 253 Phone: Email: 1 @P 13125 SW Hall Blvd. Contact name: Tony Borden Phone: 971-275-6954 Tigard,OR 97223 Applications for"minor work in right-of-way" Engineer: Phil Merriman only may be emailed to: rowpermits u(r�,tigard-or.gov Address: 10800 SW Avery Street Tualatin, OR 97062 FOR STAFF l'`E ONL1 City/state: Zip: Phone: 503-963-6943 Email: prereqcoord@pgn.com Case No.: _rF( 201 I - Da.: Contact name: Application submittal fee(.007%_/ of Engineer's Estimate) $ '7S--°V Estimated value of work is required(if over$5,000):$ _ Additional fees: $ (within the public right-of-way) Application accepted: Is work related to a LAND-USE DECISION? ID Yes VN0 By: Date: 9 Application reviewed: If so,please specify (MLP,SDR,SUB, etc.) case #: By: Date: a-%—! 9 Is work related to a BUILDING PERMIT? ❑ Yes 'No Applicant notified: If so,please specify(BUILDING PERMIT)case#: By: Date: i 9 1:\ENG\PermitApplications\pfi_application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee" and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. Vinh D Nguyen, Digitally signed by Vinh PCC Nguyen,PE Date:2019.01.03 15:55:20-08'00' Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES F R ISE ON i_\ Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL APPLICATION FEE REQL)I REMENTS Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch Engineer's estimate X 2%Plan Review (including information below) ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance may be ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of SAMPLE SKETCH: 9 th �� as, Edge of F avement Ditch 111.6\opi Streetlighti _ .—.—.—.—.—.—•—•—r—.— •'*�j R UV if+ Rta1 Drat IPy.r � . T:.... �` ra w r, :::�4n,.� t ,�4ta1 I i__ ____ I Troposfd'Sfn • � 4iTi I - 1 Ia..) N1 I 1 , ► r„1 . Existing House • I _t; I Existing 1 . Driveway I I CI ; 'I . pry• °I I 0_, ' ter. lax:II �1 g • a cla 4 `a• I 1 6I�. :: °' 1••I.L- \ I ' I I I . I r IIIN I ! Fire Hydrant(FH) , I I , • ! Scale: 'I"=30' I I I. 1 I . r MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable): North arrow Property lines & dimension Slope of property Street & street name(s) Existing building, structures Utility& street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of I 16505 C 6o 67362 ""' LEGEND 1555 %o PD-7793 10795REMOVE/'ABANDON rA CIL T,ME INSTALL FACILITIES _INSTALL ADDITIONAL FACIUIIES!MODIFY FACILITIES U 15605 15605 15605 15605 WL 12 VT-7283: 15595 1 NORR L004110N8 emove: WL 11 VT-7286: SURVEY GRID BOUNDARY 15605 15605 15605 15605 h ELBOW K1T-JKTD CABLE-#2AL 10925�lnL 11 I'��%� - u (3)ELBOW KIT-JKTD CABLE-#2/OAL (3)ELBOW KIT-JKTD CABLE-#1/DAL ELBOW KIT-JKTD CABLE-#2AL 103,0 CONDUCTORS M NOTE:VAULT TO BE ABANDONED ON 1x5805 M2495615 DURHAM NORTH C `/7-7279 ELBOW KIT-JKTD CABLE-#2AL '.0890 - INSTALL4CASCII EPR TRIPLEX PRIMARY Open A 100 361 ,09,5 (3)ELBOW KIT-JKTD CABLE-#2/0AL WL 2 PD-7916. 10900 ONDIAT INSTALL BO 02 AL EPR ATI,PRIMARY 1.2•CONDUIT A 100 3012 Install: h� 920 ABANDON a GROUND AB NRDONECABLE CABLE PER LC22015-7 V) j11043 1P 7.2 240/120 PM 50KVA NTLB •0<,1, 1- VT-726 - * VT-7260 (2)ELBOW KIT-JKTD CABLE-#2AL 2 I'1-WL 1VT-7267: 90210 A 60 24604 v stalll EQUIPMENT Remove: (2)ELBOW KIT-JKTD CABLE-#2AL 19862Jy H 1P 7240/120 PM 50KVANTLB Pb8625 INST SMALL FAULT INDICATDR(31 VAR TRIP 200A n< (2)ELBOW KIT-JKTD CABLE-#2AL (2)ELBOW KIT-JKTD CABLE-#2AL ti NOTE:OPEN BOTTOM VAULT 015 NOTE:VAULT WILL REQURE PUMPING RELATED JOBS: 15695 15655 I 4,0 M2495561 DURHAM NORTH A nILA- , m i 0,eo M2495615 DURHAM NORTH C 15695 15555 ct 1 ASS 17100 D..,;I:,I,.r,,l rl�aT1l(, 10975 o INSTALL UNDER WALK' _ M249566I DURHAM NORTH E N 19700 1-2,2495615 r ,__ -2- V7-7281 4 11 , 2 ,��:,- DURHAM NORTH C ---- -- M249561- 1 VT-7265 ' jr-7., 1.4' WL 5 PD-8022: •r-` - - 15655 DURHAM __T� - .0.1 O"<956,. Install: 15695 1,555 ,, NORTH 1 7028 URHq 10990 15695 10„ .-—- —� I 254 1 1 1 0 1'IORTy Al (Z)ELBOW KIT-JKTD CABLE-#2AL F Remove: A 50 64543 • 7027 410' -1974 A___ IN 1 """ti (2)ELBOW KIT-JKTD CABLE-#2AL NDSCAPING NOTES PD-8951 i;r..55 XT,�25J♦ ABC•110 AL TX•------- -' �I 1 VTr,984 PRE-LANDSCAPING: 12 , ` 1974 -- •7028 1 7030 NOTE:OPEN BOTTOM VAULT 7032 WL7 PD-8023:REMOVE SHRUB IN tssss yr-7203 ,.. 15705�R974;I 1974♦ A60310 AL z5 J 6 2 9L�— FRONT OF TRANSFORMER A*;.' • ‘3,,`,'-,' 97♦ WL 9 VT-7268: 7033 25'-4♦ POST-LANDSCAPING: ,L - CA 'INSTALL BEHIND WALK I Install: 1974 WL2 PO-7916.BARK OUST GRASS SEED 15695 Open 1/9 561 7 o (2)ELBOW KIT-JKTD CABLE-#2AL d VEGETATE 15695 !' B WL3 PD-7917,WLS PD-8022&WL6 P0-8024: PD-79t6�, B 50 ', '�S%a0 (2)ELBOW KIT-JKTD CABLE-#2AL ♦ •J°,• 1 B 50 22363 t"5 9� BARK DUST 7025 1age. P WL4 PD-8025:BARK DUST 0 VEGETATE TO 1964 rtti OQ' Z © INSTALL UNDER WALK 850 27618 r� 2 • �- _ _ CUSTOMER REOUES 1974,`,a�, G''':p i>. JCL's e",-4' 15,25 VT-7287 \^ R 1120[ �\ O ,�' ..:., �.OQ• tU 27 157x0 �� 1577, .5 `. 6'. 7024 .1 021-100 •• 11, 30355 WLS VT-7289: NOTES: 25'J 15745 25'J 11'70 Install: 1874 1979 (2)ELBOW KR-JKTD CABLE-#2AL 1.MUST MAINTAIN 5 FT.HORIZONTAL SEPARATION FROM RemovF: WATER MAINS AND 1 FT.VERTICAL SEPARATION BELOW. WL 1 VT-551(NEW 660}: 11190 `'?e. ©10955 157x5 •9C, 157^.r. (2)ELBOW KIT-JKTD CABLE-#2AL • 2.MAINTAIN 1 FT.SEPARATION FROM CITY OF TIGARD • /Install: 1 SUMMERFIELDAPARTMENT HOMES '`A f 10955 VT-7258 CATCH BASINS. (3)ELBOW KIT-JKTD CABLE-#1/0AL MANAGER:KENDRA CRUIKSHANK '70955 105.,5 13..15 B 50 17472 .- ELBOW KIT-JKTD CABLE-#2AL 503-884-1891 PD-71H7 '' sTsroe ,o,� 2.USE 45`/90'BENDS,FOR OPEN BOTTOM VAULTS. 70955 10945 10945 10935 15785 9 FIELD CUT BEND ABOVE GRADE TO PROVIDE SLACK FOR ' NOTE:INSTALLED IN DURHAM A(M2495561) ���,p, _ 7'. 1091515715 y'�'1yy SWITCHING.(PULL TENSIONS ASSUME 90"BEND). /0' tiv ` 9y4.REPLACE GROUND RODS IF EXCESSIVE CORROSION IS PA 75 660210905Or106.-'-- � 76771t 15785 `mss` <'�. DISCOVERED DURING CONSTRUCTION. / Open PD-7568 :18/9:1-4::::' -10 •PD�99f2 �?D / 1 '�;, � �N TRENCH CROSSING 5.GROUND ABANDONED CABLE PER LC22035-7. 11055515835 ��o �940 - 10 56tos7s losfis 6.CHECKCOORDINATIONOFSTREETLIGHT FUSING. e160940 10930 10930 ,`O" Nf♦ :',/ ,- � .4. 3035010940 10830 10930 ; 29.4 4 . `� ,979 • 5VT-7289 ,sR,: THINK / SAFETY 1.\ PD-8025•/'35-,�' yy SUMMER'IELD BROOKSIDE CONDO'S 355'1` 4- SO• 550 17404 r B 50 236111 HOA-DOUG HOSMANEK ss, '0,(1.. . • WL 3 PD-7917 10960 •10960 10960 h eommuM Com 355 OD 15640 \IRS j Install: u9 M // (2)ELBOW KIT-JKTD CABLE-#2AL �' p 15850 Remove.-: Q T P-"" (2)ELBOW KIT-JKTD CABLE-#2AL 10910 6 `� eti ,,,I''' ANY DEVIATION FROM THIS DESIGN MUST PD-7570 NOTE'OPEN BOTTOM VAULT "- 10970 • 10920 s 23000 9000 9 .'fiS 1 0 BE APPROVED BY THE PGE PROJECT MANAGER - ilo7li 10970 PD•8024 L-" A 50 29531 - B 2 PId s:::1,,,�2 ATTENTION: CALL 822 BEFORE YOU DIG lO' 11 Open S ` 0' e OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED A 10965 Q040 il �(�10 a PD-8023Vi, 30 J 10550 10880 10840 10820 I THROUGH 952.001-0090 YOU MAY OBTAIN COPIES OFlir 25'-4 THE OREGON UTILITY 15 1990 10840 B 50 23802 10820 NOTIFICATION CENTTHE RULES BY ER ADMINISTRATION 0(502.232.19871 25'1 + .6 25-4 19 '081[ 10820 10620 2lC20 4 B 25 52962 TO REQUEST UTILITY LOCATES CALL THE DREG°, RRRa111n1Y�01RL ur M 1180• 19900 B 25 48466 po-6 19y0 1010_ C 26 62657 N U71LITY N071FICATION CENTER,BII A7 LEAST CBA before y011 ♦ 1880- . 21 1C''`'`' 2 BUSINESS GAYS PRIOR TO EXCAVATION AA•OCC•780• ♦264 Pf1E CON8TRUCJION DRAIYRBO ABC 2/0 AL 1890 "1WL 4 PD-8025: ,�-5 - AA88CC 750AL AS-BUILT VERIFICATION 6 NES, VIOUiTIONS CORREC Ti:. Install: �3 AA88CC48DAL (2)ELBOW KIT-JKTD CABLE-#2AL SW DURHAM RD ----- Foramen: Date: 8 2AL Remove: PD-1 General Foreman: Dote: (2)ELBOW KIT-JKTD CABLE-#2AL AB.2.AL (Wishes o1,Iy rpglwsA b RHY con.ltnAlbA changes) SDPNOTE.OPEN BOTTOM VAULT 10932 C2 1-15A B 50 293 3 W-6 PO 2 M/ENG RE1n2GILE AccouNr IASBUILT 070ESIGNER: NQ B 167 2655 I r 1000007834 J M2495607 WL 6 PD-8024: 11/142018 1 in=80 R 1070001 PD-26 B 76 9642 Install: 57 ELBOW KIT-JKTD CABLE-#2AL 30'-Unknown C 100 5514 UNJACKETED CABLE REPLACEMENT-DURHAM NORTH B-2.980 FT (2) U - CIRCUIT SIZE 16,85 20051 PD-9537 KING CITY-SUMMERFIELD t7 x 22 M WL 7 PD-5023: ♦ �E LOCAnoN M.' Install: 15850 SW HIGHLAND CT,TIGARD,OR,97224 (2)ELBOW KIT-JKTD CABLE-#2AL 1 (2)ELBOW KIT-JKTD CABLE-#2AL 4 DESCRIPTION J F 11 PRIMARY UG SEGMENTS SHEET Remo,1.: COUNTY SECTIONS WORK WI711 NOTE:CREATE NEW OPEN, (2)ELBOW KIT-JKTD CABLE-#2AL N WASHINGTON'021100 IAS NOTED 1 OF 4 0 45 90 180 Feet STAND OFF CABLE FROM PD-8023 L sum. DESI8500 PHONE LIRAWNBY OPEN BOTTOM VAULT NOTE:OPEN BOTTOM VAULT '^F.""''..M1FR PHL MERRIMAN 971-804-3579IHEIDI BOOMER It I l I 1 I I I X0292 t— ,.nzi,o"s, CPQRILAND GENERAL ELECTRIC CO.-ALL RIGHTS RE5E80E0 1—LINE DIAGRAM ris:Z. I f7,PD-9155 C w i�TVT-6993 jC W!S6a C N fN47PD•7794 1,,_44.11 c P 7365 PC".3, 527 fi,—C GPD.77c3 G .71 00 666 ''.;0 VT-07 C w 67)62 ABC -6610 B 1 VT-45 A W.7279 �C, G P-0 •' VT•7265 u .72120 A A 100 6613 •.3°1 un A 1 w)�7wy7V'r-7—St.7'A . ,f, ABC m ABC C 600 1124 :1IA 100 7012 pD-05 G„ ,..!....1.80 l �(y _ry VTdB35 -09 24004 100 77)6 0 r PL-7821 A 66 H663-.,�. �• 6 66 16260VT-0906 T -9015 8759 y i -�• ,� 166)fN AIN HN •728 64-661 12:37)' A N 172 VT-09123 ABC A 76 VT-0754 PD.76712 PD-821 ABC ABC ¶2010 C2 1-IDD A PD.7918 9_7,A Sw 227{68662 16VT•7282 WORK C21-11C yr-06, "1 Au4H1 PL-3014 0— LY65 ,0 VEA Asc n:1 B , < w o66 Ba 67830PDiNs B 1 wPD 7917 ¢ a 76{1006472 A w 2 PD-7675ABC f00{23 PD-7568PD P[MS PL-t 590 _PD-8123 B 7e 77 {6676 i 76{wI m e VT-075 �' C 1616616 G A76 46 A00f Pp.7677 Ae 7569 P,,,, e. B w 17 VT-72119 ..../4° w 26422 9 PD-7571 (jv�"w 53601 B N 12tNVT-8710 V1-8748 Pl?T57C p 7p 0 VT-071 131,660.66404 VT 751 ' a PL-6262 00 2 1 PD-6014 B....Vt., A N i leg= p-7575 a B w 2 e Tr 4•r 802312 N 12614 .9 750 A N 11721 VTfi75jA w 20677 ••.4 P P1-10. 6f.6027001 B V A 60 14711 PLY 7�tl _ 6 2644465 0 "11 ABC�ABC V7 P0.TT.7 N•a ��7 V1•10 P1Y12 �- N c 5PL•1B Pl-{58930 P 1 PD-62 ABC ABL: ' ABC+,1" .A ._ N ANY VT 6 w 70164 ��P�_�P�L-•-2-. �'9546�� • e w C Zi uffr � �' ABC•A8C A8G g��C ABC - BP PD•26 •- - 166 6614PLY9537 A,fM 4434 1 A t 16 P421 0 120 240 480 Feet v 200A 1-1-171-7-.1-1-1,--1,-,1_ �i dvrai Y.i IL C21-1413 66. a n f — B:.f> N ANY DEVIATION FROM THIS DESIGN MUST BE APPROVED BY THE PGE PROJECT_MANAGEJ� nENnDN: CALL 811 BEFORE YOU DIG // \ �RfGON LAW REOWRES YDU TO FOLLOW RULES ADOPTED THINK 8Y THE OREGON UTILITY NOTIFICATION CENTER. 8ai.11 70005E RULES ARE SET FORTH/N OAR 951-007-0010 V SAFETY TRROUGR952001-0090YOUMAYOBTAIN COPIES OF TRF RULES BY CALLING rMf OREGON UTIL IiY \FIRS j NOTIFICATION CENTER ADMINISTRATION P 002-232-19821 ■■ TO REQUEST until,LOCATES CALL THE OREGON befall rs below UTILITY NOTIFICATION CENTER,811 AT LEAST aRY11 2,,,,,f,DAYS PRIOR TO EXCAVATION POE CONS7RUC7600 MAYANS AS-BUILT VERIFICATION&NESC VIO TIONS CORRECTED Foreman: Dear General Forman: Date: (519^0000 art mgt...RSM construct.charges) SDPMENG REVIEW IASBUILT BY DESIGNER.' 1A4, 346L.E COfR4l NO 11/14/2018 (1 in=50 R r AL1070001 rWO 1000007834 1 M2495607 77, \ UNJACKETED CABLE REPLACEMENT-DURHAM NORTH B-2,980 FT GRCUl7 AZE KING CITY-SUMMERFIELD l 17 0 22 PGE/ LOGITONS 15850 W HIGHLAND CT,TIGARD,OR,97224 DESCRIPTION 11 PRIMARY UG SEGMENTS SHEET COUNTY 1SECTIONS WORK WITH WASHINGTON C21100 1 2 OF 4 sM'."' 'DESIGN 8Y PRLN/E DRAWN BY "--'"7'" PHIL MERRIMAN 971.804.35791 HEIDI BOOMER ,=asRPea ae•rir C PORTLAND GENERN.ELECT-FOC co.-ALL RIGHTS RESERVED NOTES WL1 VT-581 WL5 PD-8022 LEGEND A °A ` NEW 660 VAULT (,DP MEQ EXISTING OPEN S5 0-14,40 e 02ESTAIEED IN BET j-r,-,'_-�_5�..., �. '"4"1/124M5'5611 ueNw NaRTN A - Arno- BOTTOM PP16Kbku / -TI-1 I--� N24M5561) �4 WNUS ONSNED ROQf �R'W�ORMER PAD VAULT 11 4 i .. T'_:='" eaI°°rri 1f #2 EPR in 2 HDPE CONDUIT � ��� e. e-DEET(MIN) ✓� 111ANSPw-PCE ---- ---- }}AATE�O5Npppp ' II'1IS"' tIIIN1ESi PULL l PJE PINAD�� 11Ca RH EACH PVC. \,�1� I' -�FRONT OF RAD SECpgARr -- 3fa 1/O EPR in 4"HDPE CONDUIT �`i° _JNOUIi -w`R~TO T ® -�JPD-8025 NOTES: t• • 1. MUST MAINTAIN 5 FT. HORIZONTAL SEPARATION FROM �6 r II' ° WATER MAINS AND 1 FT. VERTICAL SEPARATION BELOW. Q�,,„,1` TI -7 1 P.A.. 2. MAINTAIN 1 FT SEPARATION FROM CITY OF TIGARD •(0.0 J TDE.J SINGLE-PHASE TRANSFORMER PAD- CATCH BASINS. PD-8024 CONDUIT CONFIGURATION 3. USE 45'/90'BENDS, FOR OPEN BOTTOM VAULTS. FIELD CUT BEND ABOVE GRADE TO PROVIDE SLACK FOR SWITCHING. (PULL TENSIONS ASSUME 90'BEND). 4. REPLACE GROUND RODS IF EXCESSIVE CORROSION IS WL2 PD-7916 (TOP MEM) WL6 PD-8024 WL9 VT-7268 DISCOVERED DURING CONSTRUCTION. EXISTING OPEN BOTTOM VAULT EXISTING OPEN N EXISTING VAULT 5. GROUND ABANDONED CABLE PER LC22035-7. N, 'ri50 BOTTOM 6. CHECK COORDINATION OF STREET LIGHT FUSING. n.rircINq PAD `yi MINUS CRUSHED Rorx /°R25D-2125 VAULT ...;•'...=.-: -,.y ~•:, a2"150" 6"DEEP(INN) �/' TRAMSPAD-PGL {`-� TRANSEORMER PAD y4 p,(tlFISNED ROp�//RASO-2115 ` 21"rri" 4<.'''((>11 , ^6� e-t>�(MRI) ' TRANSPw-PGF ,.-----' ' OPENING M PAD V mow.or PAD ' �. �/� 2"rzs" OPENING 1;PAO\— e6• �p ,,' 'tSCCONDAR 2"j ►• M'DUI• PRIMARY 0. O _ COMOUITI '} - . - F O• ;---,- 0 d• NOTES PRIMAR; - - ys • 1. vwETs ro N WL11 VT-7266 caNDu�r:;'- A.rwRRl 1 0 O SET AT G.A,0, TO .p-- TO I 0 O A�62,P,PRmm er P EXISTING VAULT VT-581 P'N :I �� N PD-7917 S°. ,_ °O GAR i°,IT I4 e' Neat (INSTALLED 0080 er y� g dR1 Na+'TNA FRONT of PAD :NDT R'MRMNIy ��6g�j Win= ��Ro�cD ebRv�1�. 2.TOP OF UP TO itliaPoss M2465561) vwl APAv ET A EYNAL PAZ. SINGLE-PHASE1•;> TRANSFORMER PAD- TO TO TRANSFORMER PAD- `''' } ST Ie O.DD NOT CROSS CONDUIT CONFIGURATION }.R{ M D?,Prc �• ,.DO NOT C (TDP NEVI) PD-8023 PD-8022 CONDUIT CONFIGURATION �� �m'1/GEAS`i1N) µSST�MpAp1 '. 42' WITEACH PVC ' WL3 PD-7917' (TDP. WL7 PD-8023 WL10 VT-7267 •0 � EXISTING OPEN BOTTOM VAULTI EXISTING OPEN �. EXISTING VAULT _ p a UO I/ Ni `m2A sowa"ti BOTTOM 56 ,„. ,.. r, 4 Meas CRUSE.RDac /.Is T,Ir VAULT �u='_.- r r N 6”DEEP(MINI ANS•AD-POF 0 D `- A2"50" `�"MINUS CRUSHED ROCK �,17_33RIA'SR P1D z'"rri" ,58)62 6"DEEP(MINI YRANSRAD-PCE ,!OPENING M PAD ♦ ♦ (' •' 7 i.•... • .n. '17- NRB 21"125'• �• ,'� y/ r0 OPCNING IN PAtl�� —, - O••0 �'(o A..=.' f: Ill d ,NY NOTES: PRIMARY 6•m • '0 O• 1. V/T0.1�ro TD cDNA •_ 0 O 5[T T APPROVED er PDE -7916 � I O a P O )ilii Mow'OF PAo I.- e MINIMUM S°•BIW l- 56' TAT '. `ILII'- BY ME. SINGLE-PHASE TRANSFORMER PAD- `✓W SINGLE-PHASE 611,'OVA"' �N ro' CONDUIT CONFIGURATION TO TO TRANSFORMER PAD- me EM9 VT 7269 PD-8024 CONDUIT CONFIGURATION § C w EAa. ,,, c, CALL 811 BEFORE YOU DIG ATTENTION.' OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED THINK BY THE OREGON UTILITY NOTIFICATION CENTER. (TOPIAEM) WL4 PD-b025 WL8 Vf-7269 THOSE RULES ARE SET FORTH IN OAR 952-001-0010 N EXISTING OPEN EXISTING VAULT SAFETY THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF ��� Gr.s r :1'44 ::::::::::› THE RULES BY CALLING THE OREGON UTILITY �i R-MM15 CRUSHED ROCK TPANS"dRI.PAD BOTTOM N fFIRST! NOTIFICATION CENTER ADMINISTRATION 503-232-1987 6-DFEP(MINI "/ SPMA-POE VAULT ( 1 TO REQUEST UTILITY LOCATES,CALL THE OREGON Know what's below O UTILITY BUSINESS DAYS PRIOR TO EXCAVATION. 811 AT ST 9 ..„..445;c n PAD ' Call before you dig. -,,,, 1• ,I- ,Q0„,,6 PGE CONSTRUCTION DRAWING SDPM/ENG REVIEW IAS-BUILT BY DESIGNER: 00 00 10r. NOTES. p 6E AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED III o -CRO• . SET AT LDCAi10115_ °Q Oy I6APEINIOKED BY RCE This document accurately represents FIELD construction. LIS-MINIMUM - . O o a D vt Y�ALD .l� S° i-ll- �e A 6r P. Foreman: Date: W 6--_- dva OSS GF: - - Date: TO TO SINGLE-PHASE vwryt5T 5pp PD-8022 PD-791 CONDUIT CONFIGURATION )EM PUl DATE. 11/14/2018 SCALE:NTS I ACCOUNT.1070001 I AWO 1000007834 I,OB No.M2495607 ileMG EAO1 TITLE UNJACKETED CABLE REPLACEMENT-DURHAM NORTH B-2,980 FT Road Side 24” i' ., Field Side CIRCUIT. SIZE _ / ' s°aic01 LEGEND KING CITY-SUMMERFIELD 17X22 ]D- / Tr24ench T Mln j 0 Gas Utillt,ee PGE LOCATION cover 46• PGE wlmaryy 15850 SW HIGHLAND CT,TIGARD,OR,97224 Trench O SacInsid°DuctC�l° DESCRIPTION: �� oteic°/CATV N. 11 PRIMARY UG SEGMENTS ®BDckrill COUNTY. SECTION(S) WORK WITH: SHEET I 1Select Bocktill SUNSET WASHINGTON C21100 - 2OF4 12' Illal2'Min L I lrr"dEorthtM LINE CENTER DESIGN BY PHONE DRAWN BY: Min 24' 4950 NW 235TH AVE. PHIL MERRIMAN 971-804-3579 HEIDI BOOMER Joint Up Mainline Trench HILLSBORO,OR 97124 ®PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED 1-2"8L 1-4"M2495615 LEGEND DURHAM NORTH C IP-1 VT-7266 - -- 10#2 EPR in 2" HDPE CONDUIT t 2-2" M2495615 1-2 M2495615 DURHAM NORTH C DURHAM NORTH C —1-4" M2495661 30 1/0 EPR in 4" HDPE CONDUIT I -- I it DURHAM NORTH E VT-581 — (INSTALLED IN `\\ II DURHAM NORTH A ] 1P-6 M2495561) , \ VT-7267 ' ` TRENCH-FOOT TABLE 1-4" M2495561 L' PD-7916—I\ \ DURHAM NORTH A \ \N LOCATION SIZE QTY CONDUIT LENGTH LENGTH N, (in) DESIGN ACTUAL VT-7268 FROM TO (ft) (ft) N PD-7917 VT581 Ip1 2 1 90 IP1 IP6 4 1 320 TRANSFORMER LOADING - PD-8022 IPI PD7916 2 1 85 PHASE SIZE COM 8W NEW? P07916 P07917 2 1 235 PD7917 IP2 2 1 11.5 B 50 22363 83 YES \4,-- IP2 P08025 2 2 165 IP-5—\ 1P2 P08022 2 1 130 8 75 61590 101 NO IP-2 PD8022 IP3 2 1 270 B 50 23801 45 I NO IP3 IP4 2 2 25 B 75 7719 91 NO PD-8025- IP4 PD8024 2 2 80 B 50 23809 54 NO IP4 PD8023 2 2 50 B 50 23802 40 NO Rood Side 24" r P.11 Side IP3 IPS 2 1 225 8 50 17494 49 NO C\—VT-7269 Ps VT7269 2 2 35 - B so 17472 37 NO �. VA 24. Soa "DPD-8024 IPS VT7268 2 1 275 B 50 27818 43 NO Trench 0 Gos Utilities VT7268 VT7267 2 1 215 Cove Trench d eDuct VT7267 IP6 2 1 135 � aTelco/CAN IP-3 IP6 VT7266 2 1 55 ®Beck ISI IP-4—7\\-->i4k 4 1 ■ Q ) (Select Beckrill 12' 12'Min O E nturoed Min 24' PD-8023 Joint Use IAoinline Trench TOTAL 2505 PRIMARY CABLE&CONDUIT TABLE CONDUIT PRIMARY CABLES ASBUILT INFORMATION CALL 811 BEFORE YOU DIG LOCATION ATTENTION: SIZE QTY LENGTH LENGTH PULL PULL CABLE QUANTITY LENGTH LENGTH Foreman-Complete OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED (in) DESIGN ACTUAL REV DESIGN ACTUAL — THINK BY THE OREGON UTILITY NOTIFICATION CENTER. FROM TO (ft) (ft) (Ibs) (lbs) Size&Type M of Runs (ft) (ft) NOTES THOSE RULES ARE SET FORTH IN OAR 952-001 0010 SAFETY THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF VT581 VT7266 4 1 465 450 357 1/0 AL EPR TPX 1 510 THE RULES BY CALLING THE OREGON UTILITY „...--. y.0 VT581 PD7916 2 1 175 28 32 M2 AL EPR 1 195 FIRST! NOTIFICATION CENTER ADMINISTRATION O(503-232-1987) PD7916 PD7917 2 1 235 36 36 M2 AL EPR 1 260 ii_(TY LOCATES.CALL THE OREGON Know what's below UTILITY NOTIFICATION CENTER,811 AT LEAST PD7917 PD8025 2 1 280 47 41 M2 AL EPR 1 310 2 BUSINESS DAYS PRIOR TO EXCAVATION Call before you dig. PD8025 PD8022 2 1 295 58 43 #2 AL EPR 1 325 PGE CONSTRUCTION DRAWING PD8022 PD8024 2 1 375 72 72 M2 AL EPR 1 415 SDPM/ENG REVIEW: i AS-BUILT BY DESIGNER: PD8024 PD8023 2 1 130 22 23 #2 AL EPR 1 130 . PD8023 VT7269 2 1 310 57 55 M2ALEPR 1 340 AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED VT7269 VT7268 2 1 310 54 58 #2 AL EPR 1 340 This document accurately represen!s FIELD construction VT7268 VT7267 2 1 215 33 33 #2ALEPR 1 235 Foreman: _ __ Date: VT7267 V17266 2 1 190 30 30 M2 AL EPR 1 210 GF: Date: DATE 1 1/1 4/201 8 SCALE NTS IACCOUNT.1070001 (AW”.1000007834 I✓OBNO.M2495607 1 TITLE II Total 2" 251.5 #2 AL EPR , 2760 UNJACKETED CABLE REPLACEMENT-DURHAM NORTH B-2,980 FT 4" 465 1/0 AL EPR TPX 510 ! CIRCUIT SIZE KING CITYSUMMERFIELD 17X22 Grand Totals 2980 3270 rG E rC LOCATION • 15850 SW HIGHLAND CT,TIGARD,OR,97224 NOTES: NDESCRIPTION 1. MUST MAINTAIN 5 FT. HORIZONTAL SEPARATION FROM WATER MAINS AND 1 FT. VERTICAL SEPARATION BELOW. 11 PRIMARY UG SEGMENTS 2. MAINTAIN 1 FT SEPARATION FROM CITY OF TIGARD CATCH BASINS. COUNTY SECTION(SI WORK WI, SHEET 3. USE 45'/90'BENDS, FOR OPEN BOTTOM VAULTS. FIELD CUT BEND ABOVE GRADE TO PROVIDE SLACK FOR SWITCHING. (PULL SUNSET WASHINGTON C2110D AS NOTED APPA TENSIONS ASSUME 90'BEND). LINE CENTER DESIGN8Y PHONE DRAWN BY 4. REPLACE GROUND RODS IF EXCESSIVE CORROSION IS DISCOVERED DURING CONSTRUCTION. 4950 NW 235TH AVE. PHIL MERRIMAN 971-804-3579 HEIDI BOOMER 5. GROUND ABANDONED CABLE PER LC22035-7. HILLSBORO,OR 97124 6. CHECK COORDINATION OF STREET LIGHT FUSING. ©PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED a Page 84 2011 Edition It Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way N roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4)should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 December 2011 2011 Edition Page 85 N Stationary Lane Closure with Flagging Diagram 320CD N co C ccc3�cO \ I O w O / N \, rn CO CO icc CO CD 1LI CD� UJ CC o I- a Q •• i___, . . ,_ __, •• UO, ,. A • ���/��� co 0 � • / / A T I � � I. 1� o_,_ Q, © giv • m j fO Ls Ci) k flo • c-• E •• If .• 0p` �/V • 4 CD 0 I ,.. 1L 4 47—I 1 YO . 1 / w aO C1• O IYO m a_w1 1 v cc U5 �� \.i- Sign Spacing and Buffer Lengths(feet) 5 1 ..... /LL, c Posted Spacing Between Signs Buffer Q Speed A B C Space \ z cc Td O 20 50 25 100 100 100 75 30 100 35 125 40 350 350 350 150 O O 45 180 CC 3 i 50 500 500 500 210 55 250 December 2011 Chapter 5 Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities,traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths(feet) 0 a Posted Spacing Between Signs Buffer Speed A B C Space 20 50 25 100 100 100 75 30 100 35 125 40 350 350 350 150 45 180 50 500 500 500 210 55 250 Chapter 5 December 2011 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 ROAD WORK AHEAD (OPe0�0 t KIAD AHEAD BE B PREPARED TO STOP B A (Optional) • 1001t.Minx. • • PREP n. ROAD ' TO STOP WORK • AHEAD A BBC -- - Buffer - ~ • •• • ~' -► �, �' -► • K K K K • — 1008 M.LH I CBB A I ROAD BE WORK PREP •,. • AHEAD TO STOP • 100 R P t. AHEAD • ROAD • (Ove A BE PREP -. TO STOP B (Optbna) 1 t ROADAHEAD ROAD WORE AHEAD December 2011 Chapter 5