Loading...
Report (58) \5'y dani_els Revision#2 AR CHIT EC TS January 11, 2019 2145 Ford Parkway, Suite 301 Saint Paul, Minnesota 55116 Re: Morphe#040 651.690.5525 Washington Square www.finn-daniels.com 9577 SW Washington Square Rd. Tigard, OR 97223 The following revisions amend the construction documents previously issued for bid. Notify all plan holders and incorporate the bulletin items into your construction documents.This bulletin forms a part of the contract documents and modifies the original specifications, plans, and detail drawings. If costs are involved due to the enclosed bulletin items, whether credits or charges, such shall be computed and forwarded to the Morphe Project Manager for approval prior to effecting the change(s). If there are any questions regarding these changes please contact Kelsey Irlbeck with Finn Daniels Architects at 651.888.6893 Site Revision—01.11.2019: Item# Description Location 1 Added revision to drawing index Sheet A000—Updated Drawing Index 2 Updated storefront configuration to Sheet A030—Updated plan to show new storefront configuration accommodate the landlord's structural members to remain Sheet A200—Updated plan to show new storefront configuration Sheet A210—Updated plan to show new storefront configuration Sheet A220—Updated plan at storefront per new storefront configuration Sheet A230—Updated plan at storefront per new storefront configuration Sheet A300—Updated plan at storefront per new storefront configuration, revised keynote 11 Sheet A400—Revised elevations 1, 2, and 3/Added keynote 24 Sheet A500—Revised storefront elevation and plan Sheet A510—Revised sections/Added keynote 21 Sheet A520—Revised details 1, 6, 7, and 16/added detail 8/ added keynotes 32, 33, 34, and 35 Sheet E100—Revised plan at storefront Sheet E200—Revised plan at storefront Sheet S-201 —Revised plan and structural layout at storefront Sheet S-301 —Revised sections and detail 3 per plan changes ws « 3 Updated electrical at cashwrap Sheet A230—Revised symbols at cashrwap to show correct receptacle type Sheet E100—Revised plan at cashwrap 4 Added Unistrut details per RFI 2 Sheet A300—Added details 2 and 3/rearranged page to accommodate additional details 5 Changed glazing size and added Sheet A500—Added glazing clips to storefront elevation/ glazing clips modified keynotes 12 and 14 6 Removed Wattstopper—added Sheet E001 —Removed wattstopper reference from lighting contactors responsibility schedule Sheet E100—Removed keynote 4, removed wattstopper panel from plan Sheet E200—Removed keynote 10/removed wattstopper panel from plan/revised keynotes 8 and 15 Sheet E300—Added switch bamk detail 1 /Replaced wattstopper detail with lighting contactor detail Sheet E400—Removed wattsto..er from riser diagram 7 General tenant changes Sheet E100—Revised keynotes 3, 12, 14, 19, 28, and 34 Sheet E200—Revised general notes/revised lighting control matrix Sheet E300—Revised floor box detail End eiElder-Jones PERMIT SERVICE 1120 East 80th Street,#211 Bloomington,MN 55420-1498 Phone:(952)854-2854•Fax:(952)854-4909 TRANSMITTAL 2/1/2019 To: TOM HOCHSTATTER/BUILDING DIVISION 503-718-2432 MORPHE CITY OF TIGARD WASHINGTON SQUARE 13125 SW HALL BLVD TIGARD, OR TIGARD, OR 97223 BUP2018-00329 218-617 TOM HOCHSTATTER/BUILDING DIVISION, I HAVE ENCLOSED THE FOLLOWING FOR THE ABOVE REFERENCED PROJECT AND WOULD LIKE TO RESUBMIT FOR REVIEW AND APPROVAL. -THREE SETS OF PLAN CAHNGES -COMPLETED TRANSMITTAL FORM -TWO COPIES OF THE REVISION BULLETION FROM THE ARCHITECT PLEASE DIRECT ANY COMMENTS OR QUESTIONS TO MY ATTENTION. THANK YOU TIM SCHENK ELDER-JONES 952-345-6040 timsCcilelderiones.corn 'nn daniels Revision#2 A R CHIT EC TS January 11, 2019 2145 Ford Parkway, Suite 301 Saint Paul, Minnesota 55116 Re: Morphe#040 651.690.5525 Washington Square www.finn-daniels,com 9577 SW Washington Square Rd. Tigard, OR 97223 The following revisions amend the construction documents previously issued for bid. Notify all plan holders and incorporate the bulletin items into your construction documents.This bulletin forms a part of the contract documents and modifies the original specifications, plans, and detail drawings. If costs are involved due to the enclosed bulletin items, whether credits or charges, such shall be computed and forwarded to the Morphe Project Manager for approval prior to effecting the change(s). If there are any questions regarding these changes please contact Kelsey Irlbeck with Finn Daniels Architects at 651.888.6893 Site Revision—01.11.2019: Item# Description Location 1 Added revision to drawing index Sheet A000—Updated Drawing Index 2 Updated storefront configuration to Sheet A030 Updated plan to show new storefront configuration accommodate the landlord's structural members to remain Sheet A200—Updated plan to show new storefront configuration Sheet A210—Updated plan to show new storefront configuration Sheet A220—Updated plan at storefront per new storefront configuration Sheet A230—Updated plan at storefront per new storefront configuration Sheet A300—Updated plan at storefront per new storefront configuration, revised keynote 11 Sheet A400—Revised elevations 1, 2, and 3/Added keynote 24 Sheet A500—Revised storefront elevation and plan Sheet A510—Revised sections/Added keynote 21 Sheet A520—Revised details 1, 6, 7, and 16/added detail 8/ added keynotes 32, 33, 34, and 35 Sheet E100—Revised plan at storefront Sheet E200—Revised plan at storefront Sheet S-201 —Revised plan and structural layout at storefront Sheet S-301 —Revised sections and detail 3 per plan changes • • 3 Updated electrical at cashwrap Sheet A230—Revised symbols at cashrwap to show correct receptacle type Sheet E100—Revised plan at cashwrap 4 Added Unistrut details per RFI 2 Sheet A300—Added details 2 and 3/rearranged page to accommodate additional details 5 Changed glazing size and added Sheet A500—Added glazing clips to storefront elevation/ glazing clips modified keynotes 12 and 14 6 Removed Wattstopper—added Sheet E001 —Removed wattstopper reference from lighting contactors responsibility schedule Sheet E100—Removed keynote 4, removed wattstopper panel from plan Sheet E200—Removed keynote 10/removed wattstopper panel from plan/revised keynotes 8 and 15 Sheet E300—Added switch bamk detail 1 /Replaced wattstopper detail with lighting contactor detail Sheet E400—Removed wattstopper from riser diagram 7 General tenant changes Sheet E100—Revised keynotes 3, 12, 14, 19, 28, and 34 Sheet E200—Revised general notes/revised lighting control matrix Sheet E300—Revised floor box detail End 4 fkindanlels Revision #2 A R CHIT ECTS January 11, 2019 2145 Ford Parkway, Suite 301 Saint Paul, Minnesota 55116 Re: Morphe#040 651.690.5525 Washington Square www.finn-daniels.com 9577 SW Washington Square Rd. Tigard, OR 97223 The following revisions amend the construction documents previously issued for bid. Notify all plan holders and incorporate the bulletin items into your construction documents.This bulletin forms a part of the contract documents and modifies the original specifications, plans, and detail drawings. If costs are involved due to the enclosed bulletin items, whether credits or charges, such shall be computed and forwarded to the Morphe Project Manager for approval prior to effecting the change(s). If there are any questions regarding these changes please contact Kelsey Irlbeck with Finn Daniels Architects at 651.888.6893 Site Revision—01.11.2019: Item# Description Location 1 Added revision to drawing index Sheet A000—Updated Drawing Index 2 Updated storefront configuration to Sheet A030—Updated plan to show new storefront configuration accommodate the landlord's structural members to remain Sheet A200—Updated plan to show new storefront configuration Sheet A210—Updated plan to show new storefront configuration Sheet A220—Updated plan at storefront per new storefront configuration Sheet A230—Updated plan at storefront per new storefront configuration Sheet A300—Updated plan at storefront per new storefront configuration, revised keynote 11 Sheet A400—Revised elevations 1, 2, and 3/Added keynote 24 Sheet A500—Revised storefront elevation and plan Sheet A510—Revised sections/Added keynote 21 Sheet A520—Revised details 1, 6, 7, and 16/added detail 8/ added keynotes 32, 33, 34, and 35 Sheet E100—Revised plan at storefront Sheet E200—Revised plan at storefront Sheet S-201 —Revised plan and structural layout at storefront Sheet S-301 —Revised sections and detail 3 per plan changes a r 3 Updated electrical at cashwrap Sheet A230—Revised symbols at cashrwap to show correct receptacle type Sheet El 00—Revised plan at cashwrap 4 Added Unistrut details per RFI 2 Sheet A300—Added details 2 and 3/rearranged page to accommodate additional details 5 Changed glazing size and added Sheet A500—Added glazing clips to storefront elevation / glazing clips modified keynotes 12 and 14 6 Removed Wattstopper—added Sheet E001 —Removed wattstopper reference from lighting contactors responsibility schedule Sheet El 00—Removed keynote 4, removed wattstopper panel from plan Sheet E200—Removed keynote 10/removed wattstopper panel from plan/revised keynotes 8 and 15 Sheet E300—Added switch bamk detail 1 /Replaced wattstopper detail with lighting contactor detail Sheet E400—Removed wattstopper from riser diagram 7 General tenant changes Sheet E100—Revised keynotes 3, 12, 14, 19, 28, and 34 Sheet E200—Revised general notes/revised lighting control matrix Sheet E300—Revised floor box detail End FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard ' COMMUNITY DEVELOPMENT DEPARTMENT I "I 3 4 Transmittal Letter T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: To C•yS S-Al-r="2 DATE RECJI��VED: DEPT: BUILDING DIVISION R E(>; J /...1) FEB 4 2019 FROM: fl tA 5G t4eNV-. CI OF 6 IGARD #B1. .,..)NG DIVISION COMPANY: C(...OEQ - SOr-AES PHONE: S'52 :345 •GO4k-a By:5 SPncG 60"1 RE: c1511 5 W. WAS t-4Irk,tar( 5QJa1Z Ro Fve-zsi Z 043Zc: (Site Address) (Permit Number) _) (Project name or subdivision name and lot number) Pr- ATTACHED ARE THE FOLLOWING ITEMS: C : Description: „ , , ' opi opleses: Description: Additional set(s) of plans. 0) S Revisions: IZeI t seo RAN t PrAGES Gr1ta'4 Cross section(s) and details. ` Wall bracing and/or lateral analysis. Floor/roof framing. I 1 Basement and retaining walls. 0 Beam calculations. Engineer's calculations. Other(explain): et REMARKS: PCjNc1 GtI(GCS , )LC/NSE Ars(ac4le0 ��'V15 bor� Qv LLErii.t. AW,„„!': \. \\\p\\\\ '1, \i,iiii,�''. ,\',, °,'\ ,° ' FOR OFFICEUSE ONLY:, Routed to Permit Te • ician: Date: 1„- 12- ) Initials. Fees Due: ® es ❑ No Fee Description: y Amount uue• \ *****k \ *********1 \ \ \\ \ \\ Special Inst 5, tions: Reprint Permit(per PE): [' Yes f 14 No El Done Applicant Notified: ,l4--- Date: ,2 41,1.2fi Initials,:K I:\Building\Fonns\TransmittalLetter-Revisions.doc 05/25/2012