Report (58) \5'y
dani_els
Revision#2 AR CHIT EC TS
January 11, 2019 2145 Ford Parkway, Suite 301
Saint Paul, Minnesota 55116
Re: Morphe#040 651.690.5525
Washington Square www.finn-daniels.com
9577 SW Washington Square Rd.
Tigard, OR 97223
The following revisions amend the construction documents previously issued for bid. Notify all plan
holders and incorporate the bulletin items into your construction documents.This bulletin forms a part
of the contract documents and modifies the original specifications, plans, and detail drawings. If costs
are involved due to the enclosed bulletin items, whether credits or charges, such shall be computed and
forwarded to the Morphe Project Manager for approval prior to effecting the change(s). If there are any
questions regarding these changes please contact Kelsey Irlbeck with Finn Daniels Architects at
651.888.6893
Site Revision—01.11.2019:
Item# Description Location
1 Added revision to drawing index Sheet A000—Updated Drawing Index
2 Updated storefront configuration to Sheet A030—Updated plan to show new storefront configuration
accommodate the landlord's
structural members to remain Sheet A200—Updated plan to show new storefront configuration
Sheet A210—Updated plan to show new storefront configuration
Sheet A220—Updated plan at storefront per new storefront
configuration
Sheet A230—Updated plan at storefront per new storefront
configuration
Sheet A300—Updated plan at storefront per new storefront
configuration, revised keynote 11
Sheet A400—Revised elevations 1, 2, and 3/Added keynote 24
Sheet A500—Revised storefront elevation and plan
Sheet A510—Revised sections/Added keynote 21
Sheet A520—Revised details 1, 6, 7, and 16/added detail 8/
added keynotes 32, 33, 34, and 35
Sheet E100—Revised plan at storefront
Sheet E200—Revised plan at storefront
Sheet S-201 —Revised plan and structural layout at storefront
Sheet S-301 —Revised sections and detail 3 per plan changes
ws «
3 Updated electrical at cashwrap Sheet A230—Revised symbols at cashrwap to show correct
receptacle type
Sheet E100—Revised plan at cashwrap
4 Added Unistrut details per RFI 2 Sheet A300—Added details 2 and 3/rearranged page to
accommodate additional details
5 Changed glazing size and added Sheet A500—Added glazing clips to storefront elevation/
glazing clips modified keynotes 12 and 14
6 Removed Wattstopper—added Sheet E001 —Removed wattstopper reference from
lighting contactors responsibility schedule
Sheet E100—Removed keynote 4, removed wattstopper panel
from plan
Sheet E200—Removed keynote 10/removed wattstopper panel
from plan/revised keynotes 8 and 15
Sheet E300—Added switch bamk detail 1 /Replaced
wattstopper detail with lighting contactor detail
Sheet E400—Removed wattsto..er from riser diagram
7 General tenant changes Sheet E100—Revised keynotes 3, 12, 14, 19, 28, and 34
Sheet E200—Revised general notes/revised lighting control
matrix
Sheet E300—Revised floor box detail
End
eiElder-Jones
PERMIT SERVICE
1120 East 80th Street,#211
Bloomington,MN 55420-1498
Phone:(952)854-2854•Fax:(952)854-4909
TRANSMITTAL
2/1/2019
To: TOM HOCHSTATTER/BUILDING DIVISION 503-718-2432 MORPHE
CITY OF TIGARD WASHINGTON SQUARE
13125 SW HALL BLVD TIGARD, OR
TIGARD, OR 97223 BUP2018-00329
218-617
TOM HOCHSTATTER/BUILDING DIVISION,
I HAVE ENCLOSED THE FOLLOWING FOR THE ABOVE REFERENCED PROJECT AND
WOULD LIKE TO RESUBMIT FOR REVIEW AND APPROVAL.
-THREE SETS OF PLAN CAHNGES
-COMPLETED TRANSMITTAL FORM
-TWO COPIES OF THE REVISION BULLETION FROM THE ARCHITECT
PLEASE DIRECT ANY COMMENTS OR QUESTIONS TO MY ATTENTION.
THANK YOU
TIM SCHENK
ELDER-JONES
952-345-6040
timsCcilelderiones.corn
'nn daniels
Revision#2 A R CHIT EC TS
January 11, 2019 2145 Ford Parkway, Suite 301
Saint Paul, Minnesota 55116
Re: Morphe#040 651.690.5525
Washington Square www.finn-daniels,com
9577 SW Washington Square Rd.
Tigard, OR 97223
The following revisions amend the construction documents previously issued for bid. Notify all plan
holders and incorporate the bulletin items into your construction documents.This bulletin forms a part
of the contract documents and modifies the original specifications, plans, and detail drawings. If costs
are involved due to the enclosed bulletin items, whether credits or charges, such shall be computed and
forwarded to the Morphe Project Manager for approval prior to effecting the change(s). If there are any
questions regarding these changes please contact Kelsey Irlbeck with Finn Daniels Architects at
651.888.6893
Site Revision—01.11.2019:
Item# Description Location
1 Added revision to drawing index Sheet A000—Updated Drawing Index
2 Updated storefront configuration to Sheet A030 Updated plan to show new storefront configuration
accommodate the landlord's
structural members to remain Sheet A200—Updated plan to show new storefront configuration
Sheet A210—Updated plan to show new storefront configuration
Sheet A220—Updated plan at storefront per new storefront
configuration
Sheet A230—Updated plan at storefront per new storefront
configuration
Sheet A300—Updated plan at storefront per new storefront
configuration, revised keynote 11
Sheet A400—Revised elevations 1, 2, and 3/Added keynote 24
Sheet A500—Revised storefront elevation and plan
Sheet A510—Revised sections/Added keynote 21
Sheet A520—Revised details 1, 6, 7, and 16/added detail 8/
added keynotes 32, 33, 34, and 35
Sheet E100—Revised plan at storefront
Sheet E200—Revised plan at storefront
Sheet S-201 —Revised plan and structural layout at storefront
Sheet S-301 —Revised sections and detail 3 per plan changes
• •
3 Updated electrical at cashwrap Sheet A230—Revised symbols at cashrwap to show correct
receptacle type
Sheet E100—Revised plan at cashwrap
4 Added Unistrut details per RFI 2 Sheet A300—Added details 2 and 3/rearranged page to
accommodate additional details
5 Changed glazing size and added Sheet A500—Added glazing clips to storefront elevation/
glazing clips modified keynotes 12 and 14
6 Removed Wattstopper—added Sheet E001 —Removed wattstopper reference from
lighting contactors responsibility schedule
Sheet E100—Removed keynote 4, removed wattstopper panel
from plan
Sheet E200—Removed keynote 10/removed wattstopper panel
from plan/revised keynotes 8 and 15
Sheet E300—Added switch bamk detail 1 /Replaced
wattstopper detail with lighting contactor detail
Sheet E400—Removed wattstopper from riser diagram
7 General tenant changes Sheet E100—Revised keynotes 3, 12, 14, 19, 28, and 34
Sheet E200—Revised general notes/revised lighting control
matrix
Sheet E300—Revised floor box detail
End
4
fkindanlels
Revision #2 A R CHIT ECTS
January 11, 2019 2145 Ford Parkway, Suite 301
Saint Paul, Minnesota 55116
Re: Morphe#040 651.690.5525
Washington Square www.finn-daniels.com
9577 SW Washington Square Rd.
Tigard, OR 97223
The following revisions amend the construction documents previously issued for bid. Notify all plan
holders and incorporate the bulletin items into your construction documents.This bulletin forms a part
of the contract documents and modifies the original specifications, plans, and detail drawings. If costs
are involved due to the enclosed bulletin items, whether credits or charges, such shall be computed and
forwarded to the Morphe Project Manager for approval prior to effecting the change(s). If there are any
questions regarding these changes please contact Kelsey Irlbeck with Finn Daniels Architects at
651.888.6893
Site Revision—01.11.2019:
Item# Description Location
1 Added revision to drawing index Sheet A000—Updated Drawing Index
2 Updated storefront configuration to Sheet A030—Updated plan to show new storefront configuration
accommodate the landlord's
structural members to remain Sheet A200—Updated plan to show new storefront configuration
Sheet A210—Updated plan to show new storefront configuration
Sheet A220—Updated plan at storefront per new storefront
configuration
Sheet A230—Updated plan at storefront per new storefront
configuration
Sheet A300—Updated plan at storefront per new storefront
configuration, revised keynote 11
Sheet A400—Revised elevations 1, 2, and 3/Added keynote 24
Sheet A500—Revised storefront elevation and plan
Sheet A510—Revised sections/Added keynote 21
Sheet A520—Revised details 1, 6, 7, and 16/added detail 8/
added keynotes 32, 33, 34, and 35
Sheet E100—Revised plan at storefront
Sheet E200—Revised plan at storefront
Sheet S-201 —Revised plan and structural layout at storefront
Sheet S-301 —Revised sections and detail 3 per plan changes
a r
3 Updated electrical at cashwrap Sheet A230—Revised symbols at cashrwap to show correct
receptacle type
Sheet El 00—Revised plan at cashwrap
4 Added Unistrut details per RFI 2 Sheet A300—Added details 2 and 3/rearranged page to
accommodate additional details
5 Changed glazing size and added Sheet A500—Added glazing clips to storefront elevation /
glazing clips modified keynotes 12 and 14
6 Removed Wattstopper—added Sheet E001 —Removed wattstopper reference from
lighting contactors responsibility schedule
Sheet El 00—Removed keynote 4, removed wattstopper panel
from plan
Sheet E200—Removed keynote 10/removed wattstopper panel
from plan/revised keynotes 8 and 15
Sheet E300—Added switch bamk detail 1 /Replaced
wattstopper detail with lighting contactor detail
Sheet E400—Removed wattstopper from riser diagram
7 General tenant changes Sheet E100—Revised keynotes 3, 12, 14, 19, 28, and 34
Sheet E200—Revised general notes/revised lighting control
matrix
Sheet E300—Revised floor box detail
End
FOR OFFICE USE ONLY-SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard ' COMMUNITY DEVELOPMENT DEPARTMENT
I "I 3 4 Transmittal Letter
T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: To C•yS S-Al-r="2 DATE RECJI��VED:
DEPT: BUILDING DIVISION R E(>; J /...1)
FEB 4 2019
FROM: fl tA 5G t4eNV-. CI OF 6 IGARD
#B1. .,..)NG DIVISION
COMPANY: C(...OEQ - SOr-AES
PHONE: S'52 :345 •GO4k-a By:5
SPncG 60"1
RE: c1511 5 W. WAS t-4Irk,tar( 5QJa1Z Ro Fve-zsi Z 043Zc:
(Site Address) (Permit Number)
_) (Project name or subdivision name and lot number)
Pr- ATTACHED ARE THE FOLLOWING ITEMS:
C : Description: „ , , ' opi
opleses: Description:
Additional set(s) of plans. 0) S Revisions: IZeI t seo RAN t PrAGES Gr1ta'4
Cross section(s) and details. ` Wall bracing and/or lateral analysis.
Floor/roof framing. I 1 Basement and retaining walls.
0 Beam calculations. Engineer's calculations.
Other(explain):
et REMARKS: PCjNc1 GtI(GCS , )LC/NSE Ars(ac4le0 ��'V15 bor� Qv LLErii.t.
AW,„„!': \. \\\p\\\\ '1, \i,iiii,�''. ,\',, °,'\ ,° ' FOR OFFICEUSE ONLY:,
Routed to Permit Te • ician: Date: 1„- 12- ) Initials.
Fees Due: ® es ❑ No Fee Description: y Amount
uue•
\ *****k \ *********1
\ \ \\ \ \\
Special
Inst 5, tions:
Reprint Permit(per PE): [' Yes f 14 No El Done
Applicant Notified: ,l4--- Date: ,2 41,1.2fi Initials,:K
I:\Building\Fonns\TransmittalLetter-Revisions.doc 05/25/2012