Loading...
Plans (73) \-xt.kac PROJECT NOTES 1, COSCO FIRE WORK TO CONSIST OF THE INSTALLATION OF DRY PENDENT SPRINKLERS IN A NEW FREEZER/COOLER. 2. COSCO FIRE TO START AT EXISTING OVERHEAD SYSTEM. 3. NEW OCCUPANCY TO BE ORDINARY HAZARD 2. 4. ALL PIPING AND HANGERS TO BE INSTALLED PER NFPA 13 (2013). 5. ALL MATERIALS TO BE LISTED FOR FIRE SPRINKLER USE, RECEIVED FEB 1 9 2019 SW SANDBURG ST. CITY OF TIGARD BUILDING DIVISION • EXIS . -1/2 Ir COOLER FREEZER EXIST. 1-1/2 2- - - - - - CFP AREA OF WORK FIRE SPRINKLER PLAN VICINITY MAP 1/8' = 1'-0' N.T.S. HEAD CRIME WAD ESCUTCH PHI (360) 883-6383 FAX: (360) 883-6390 CLIENT SYR WAIF SIN NEWEL TYPE SIZE SIZE FINISH FINISH TElf CITY APEX LABS • VIKDE VK176 IOCROFAST OR FRY In 1/2' K5.6 CFR CFR 200* 6 . (AO • • 6700 SW SANDBURG ST. . 40. 0$ •• • COSCO TIGARD, OR 97223 "0004. 4PROJECT 6 46 46 4°• •''' e Fire Protection IIMBER 1901-2202 FIRE PROTECTION AND LIFE SAFETY SPECIALISTS PRIlEcT APEX LABS DESIGNER DATE 2501 SE COLUMBIA WAY SUITE 100 FURNO 02/15/19 VANCOUVER, WA. 98661 6700 SW SANDBURG ST. SHEET SPRINKLER HEADS USED TOM 6 TIGARD, DR 97223 WA# COSCOFPHONM wn.COSCOFIRE.cori DR* 67508 1 OF 1 FP-1