Loading...
Permit (87) CITY OF TIGARD BUILDING PERMIT 1111 COMMUNITY DEVELOPMENT Permit#: BUP2019-00016 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/07/2019 Parcel: 1 S 1260000300 Jurisdiction: Tigard Site address: 9585 SW WASHINGTON SQUARE RD Project: AT&T Subdivision: None Lot: None Project Description: 100 sq.ft. kiosk including retail fixtures,flooring,and prefabricated finishes. Contractor: ROEBBELEN CONTRACTING INC Owner: PPR WASHINGTON SQUARE LLC 1241 HAWKS FLIGHT CT PO BOX 847 ELDORADO HILLS, CA 95762 CARLSBAD, CA 92018 PHONE: 916-939-4000 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 02/04/2019 $241.01 Demolition Occupancy Grp: M Occupancy Load: 3 12%State Surcharge-Building 02/04/2019 $28.92 Dwelling Units: 0 Plan Review 01/25/2019 $156.66 Stories: 0 Height: 0 ft DC Provision Review, COM New-Bldg 02/04/2019 $194.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 02/04/2019 $6.00 Value: $11,000 11x17) Info Process/Archiving-Lg$2.00(over 02/04/2019 $6.00 11x17) Floor Areas: Total Area: 150 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $632.59 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION' Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a co. . - - or direct questions to OUNC by calling 503.232.1987 or 0.332.2344. Issued By: -errlittee.S.igj ture: - —, rte` — Ca 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial FOR OFFICE USE ONLY . City of Tigard ' .. Deis Ci Pemut No.:067�I/�_ `ce 13125 SW Hall Blvd.,Tigard OR 97223 plan Reyvi Other Permit: O Phone: 503.718.2439 Fax: 503.598.1960 Date/By: )1:1 g-I C T I G A R D �p�on Line: 503.639.4175 JAN 1 7 2019 Date Ready/By: / loris: ® See Page 2 for Internet: www.tigard-or.gov Notified/Method: l 3)/I-1 , 75 Supplemental Information TYPE op3itsmic REUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction 0 Demolition re)4 iitiiPermit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ►1 Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ElAccessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:9585 SW Washington Sq.Rd. New dwelling area: square feet City/State/ZIP:Portland,Oregon 97223 Garage/carport area: square feet Suite/bldgiapt.no.: Project name:ATT Kiosk Covered porch area square feet Cross street/directions to job site:SW GreenBurg RD Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Installation of free standing ATT Kiosk in common/public area of center.Kiosk Valuation: $$11,000.00 measures 10'x10'&includes retail fixtures,flooring&prefabricated fmishings Existing building area: square feet New building area: 100 square feet 0 PROPERTY OWNER ❑ TENANT Number of stories: Name:AT&T Mobility Type of construction: Address:4404 Goose Rock Dr. Occupancy groups: City/State/ZIP:Indianapolis,In.46239 Existing: Phone:(317)919-7600 Fax:( ) New: M 0 APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* Business name:Property Service (Please refer to fee schedule) Structural plan review fee(or deposit): Contact name:Gary Palmer Address:POB 23534 FLS plan review fee(if applicable): Total fees due upon application: (5?0,.G 6,_ City/State/ZIP:Eugene,Oregon 97402 Phone:(541)603-4191 Fax::( ) Amount received: E-mail:psexpediting®aim.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name:Roebbelem Contractiong Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:1241 Hawks Flight Drive Solar Installation Specialty Code checklist City/State/Z1P:El Dorado Hills,CA.95762 Permit fee(includes plan review $180.00 and administrative fees): Phone:(916)939-4000 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lie.:124156 (A I i.3 pi/ /� Total fee due upon application: $201.60 Authorized signature: 4 \ This permit application expires if a permit is not obtained V j \ within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Print name: 0 Date: y+� Service Board. I:1Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Property Service RECEIVED Building Permit Expediting Consulting& Management JAN 1 7 2019 Post Office Box 23534 ,r.r Eugene, Oregon 97402 OF-Plat t >�r January ir, 2019 City of Tigard Oregon Building Dept./Permit Center 13125 SW Hall Blvd. Tigard, Oregon 97223 To Whom it May Concern : Enclosed area sets of plans, permit application 8t related departmental documents for a kiosk project at the Washington Square Center. I'd like to have the enclosed submitted into plan review for approval 8t permits, if you have any questions my contact information is as follows: Gary Palmer 541-603-4191 psexpeditinq(&aim.com I will follow up with the permit center once this has been delivered for plan check fees 81.to answer any questions. Thank you, Gary Palmer City of Tigard 11111 " COMMUNITY DEVELOPMENT DEPARTMENT T 1 CARD Building Permit Review — Commercial - No Land Use (- , Building Permit #: a,,,,,,/,_66b,,, Site Address: ISN S`w \ARIS d Suite/Bldg#:i vruc a Suite/Bid #: Project Name: A11 Kick (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review n' Proposal: 1^41-xlttII LL 0C "344,ing` STT b k in Cim,keihabl'it a of Ctrl, ki7ik rtitkpiti to '`10 nr & 1 .t✓�(.S K-`Ai 1-11-1v/t-I j TIal"sj ,1 pt.Pl6rr2411 .�'j1�1i1hiky, Existing Business Activity: 1 Proposed Business Activity: Saty 0r+11,- til II/Verify site address/suite#exists and active in permit syste . er Terrace Neighborhood: ❑ Yes No Ver [ining: kV C rmitted Use: I� Yes ❑ No ❑ Spec Space lIX Co firm no land use required. usiness License: / Exists: CI Yes Lid No,applicant notified to obtain business license Notes: Approved by Planning: )Lo..nvvtttt CP - Date: I-L9`(9 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: / / Site Plans: ## idt Building Plans: # Building Permit#: L `ter building permit#above. Workflow Routing: 13---Ptinning E- Coordinator u ing Workflow Sign-off: gYS�gn- f for Planning(include notes from planning review) Route Application Documents: wilding: original permit application,site plans,building plans,engineer and Qo beam calculations and trust details,if applicable,etc. Notes: J&Cc i Cje / yr l 0, / -, l cd✓ :..; ii /igrs,V dA/ / ag' '''. r, b+r By Permit Technician: Date: /AO/ > 1 1:\Building\Forms\BIdgPermitRvw COM NoLandUse 060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: /VSDC Fees Entered: Wash Co Trans Dev Tax: es ❑ N/A Tigard Trans SDC: I .Yes ❑ N/A Parks SDC: [ Yes ❑ N/A OK to Issue Permit Approved by Permit Coordinator: Date: 7/3//'r I:\Building\Forms\BldgPermitRvw_COM_NoLandUse_070915.docx