Permit (16) FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
1111
= Transmittal Letter
T 1 G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: /�Ir %�„ c�1s}q�t�r DATE RECEIVED:
DEPT: BUILDING DIVISION
FROM: ?rt) ( ecf 111e, MAR - , 9
COMPANY: Tr i car c� /a rchile
PHONE: Gil 3 - 69 T 2 -a 22 Z . (p By:
RE: COS? c - 91.6 J5 S, 6U• W�sh1�,`dal, S 7, i ' o
(Site Address) J ` �r)��/o - b O 3 3 /
(Permit Number)
Cg-P4' - I V�csh � �w� 54iVit. CO 1 7, and O Q of 122
Project name or subdivision name and lot number) f
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
Additional set(s) of plans. i Revisions: -&'V /- J %i /0 el •
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS: /6- c/,-e,--),- r� Q,P,7L by,-e r-r, Jk b,ry
4"95, 7h-e prrkneY,-LL/ rt.4 PdYi 1 ,,r" t-wLt $i v>, h<>f he fr!%t
l nnrn s ate, , /v)e1-et-- ir.1 n d w-c_ .511, •sled /0.er e {�
a /h 6.4/ , -e/eel,1co( / , huh-,/4,.-,g sty- .4,4si, 't
FOR OFFICE USE ONLY
Route to Permit Tec ician: Date: :?-- i <- )q Initials: ii
Fees Due>ja Ye ❑No Fee Description• ount Due:
!/ 4n4 —
$
Special
Instructions: /
Reprint Permit(per PE): ❑ Yes N ❑ Done
Applicant Notified: ( jl Date: 3 I i I7i� Initials:
I:\Building\Forms\TransmittalLetter-RJevvisions.doc 05/25/2012
E
TRICARICOufn 1
ARCHITECTURE AND DESIGN PC
Casper Washington Sq. — REVISION, 9. .h. m� .:v�
JOB INFORMATION
Location: Casper-Washington Square
City, State: Portland, OR
Date: 02.26.2019
Job No.: 180292
DISTRIBUTION
Melody Hill, Alex Schwam Casper
Phil Plake James Barb Construction
Justin Glennon, James Andrus The Andrus Group
Mario and Carla Permits Today
ITEMS
No. Sheet Description
1 C000 Updated cover sheet. Added millwork shop drawings, revised the drawing index, and
updated the tenant and expeditor contact information.
2 G003 Changed the color of the accessibility signage from brass to blue with contrasting
letters.
3 G004 The Queen Gray and Queen Blue trial rooms are no longer elevated and will not have
stairs. All trial room fixtures will be on the ground. The egress path has not changed.
Added key note 16 for the fur out of back wall. Move back sales wall 9"toward the
4 A101 storefront due to existing pipes on back wall. Adjusted the dimension of the floor
power/data receptacles due to the rear wall move.
Adjusted the dimension of the grid, due to the rear wall shift. Updated the L2 light spec
5 A102 based on Casper direction for new light spec. GC to coordinate with lighting vendor as
required.Adjusted the ceiling height to be lower at 13'-3" aff vs 13'-6" aff per field
conditions.
Added keynote 7-for data rack. Added Keynote 8-for conduit run from wall to back of
6 1 A103 trial room.Adjusted the dimension of the power for the steamer outlet due to the rear
i i wall shift.
7 A104 Omitted stairs from Queen Gray and Queen Blue trial rooms. Added dimensions to the
plan for adaptation for the millworker.
Moved finish transition tags per the rear wall shift. Adjusted the transition tags where
8 A105 the entry into the Queen Gray trial room changed to the front vs. the side (since the
stairs where removed).
Revised the elevations per the Queen Gray and Queen Blue trial rooms no longer being
9 A201 elevated. No trial rooms will have stairs. All trial room fixtures will be on the ground,
except the storefront display trial-which is for display and has one small step.
10 A601- Added the Storefront Trial RH millwork shop drawings to the set for reference only.
A603 These are the same millwork shop drawing that the DOB reviewed and approved.
11 A604- Added the Yellow Trial King millwork shop drawings to the set for reference only. These
A606 are the same millwork shop drawing that the DOB reviewed and approved.
12 A607- Added the Pink Trial King millwork shop drawings to the set for reference only. These
A609 are the same millwork shop drawing that the DOB reviewed and approved.
502 VALLEY ROAD 766 SHREWSBURY AVENUE,STE 403 6503 ALASAN COVE
WAYNE,NJ 07470 TINTON FALLS,NJ 07724 AUSTIN,TX 78730 P 973.692.0222 F973 692 0223 INFO@TRICARICO.COM
TRICARICO.COM
f 1
TRICARICOTIM ARCHITECTURE AND DESIGN PC
A610 Added the Gray Trial Queen millwork shop drawings to the set for reference only. The
13 A612 Queen Gray trial room is no longer elevated and will not have stairs. All trial room
fixtures will be on the ground.
A613- Added the Blue Trial Queen millwork shop drawings to the set for reference only. The
14 A615 Queen Blue trial room is no longer elevated and will not have stairs. All trial room
fixtures will be on the ground.
SUMMARY
Per Casper's request, we made revisions to the Construction Drawings dated 11.14.2018. The
primary reason for the revision is that Casper has decided to no longer elevate the trial rooms
and has omitted the stairs from these. The millwork shop drawings had been submitted to the
Dept. of Building via 11x17 formats and had included the structural engineers review stamp.
Those millwork shop drawings were approved by the Dept. of Building on 1.31.2019.
We have included the approved shop drawings in the attached pdfs for (3) of the trial rooms
(Storefront, Yellow and Pink). We have replaced the other (2) elevated millwork shop drawings
for the (2) trial rooms which will no longer have stairs (Gray and Blue) and have added these to
the set for reference. The intent is that these will have the same attachment details as
required.
Please review the detailed description above for more information. See also the pdfs of the
sheets associated with the changes. The sheets changes have been clouded with a revision
delta 1.
Please let us know if you have any questions.
Regards,
Denise Ambicki
Project Manager
Tricarico Architecture and Design PC
502 Valley Road, Wayne, NJ 07470
502 VALLEY ROAD 766 SHREWSBURY AVENUE,STE 403 6503 ALASAN COVE
WAYNE,NJ 07470 TINTON FALLS,NJ 07724 AUSTIN,TX 78730 P 973.692.0222 F 973.692.0223 INFO@TRICARICO.COM
TRICARICO.COM
TRICARICO ARCHITECTURE AND DESIGN PC
Casper Washington Sq. -. 11 mow
�.
JOB INFORMATION
Location: Casper-Washington Square
City, State: Portland, OR
Date: 02.26.2019
Job No.: 180292
DISTRIBUTION
Melody Hill, Alex Schwam Casper
Phil Plake James Barb Construction
Justin Glennon, James Andrus The Andrus Group
Mario and Carla Permits Today
ITEMS
No. Sheet Description
1 C000 Updated cover sheet. Added millwork shop drawings, revised the drawing index, and
updated the tenant and expeditor contact information.
2 G003 Changed the color of the accessibility signage from brass to blue with contrasting
letters.
3 G004 The Queen Gray and Queen Blue trial rooms are no longer elevated and will not have
stairs. All trial room fixtures will be on the ground. The egress path has not changed.
Added key note 16 for the fur out of back wall. Move back sales wall 9"toward the
4 A101 storefront due to existing pipes on back wall. Adjusted the dimension of the floor
power/data receptacles due to the rear wall move.
Adjusted the dimension of the grid, due to the rear wall shift. Updated the L2 light spec
5 A102 based on Casper direction for new light spec. GC to coordinate with lighting vendor as
required.Adjusted the ceiling height to be lower at 13'-3"aff vs 13'-6"aff per field
conditions.
Added keynote 7-for data rack. Added Keynote 8-for conduit run from wall to back of
6 A103 trial room.Adjusted the dimension of the power for the steamer outlet due to the rear
wall shift.
7 A104 Omitted stairs from Queen Gray and Queen Blue trial rooms. Added dimensions to the
plan for adaptation for the millworker.
Moved finish transition tags per the rear wall shift. Adjusted the transition tags where
8 A105 the entry into the Queen Gray trial room changed to the front vs. the side (since the
stairs where removed).
Revised the elevations per the Queen Gray and Queen Blue trial rooms no longer being
9 A201 elevated. No trial rooms will have stairs. All trial room fixtures will be on the ground,
except the storefront display trial-which is for display and has one small step.
10 A601- Added the Storefront Trial RH millwork shop drawings to the set for reference only.
A603 These are the same millwork shop drawing that the DOB reviewed and approved.
11 A604- Added the Yellow Trial King millwork shop drawings to the set for reference only. These
A606 are the same millwork shop drawing that the DOB reviewed and approved.
12 A607- Added the Pink Trial King millwork shop drawings to the set for reference only. These
A609 are the same millwork shop drawing that the DOB reviewed and approved.
502 VALLEY ROAD 766 SHREWSBURY AVENUE,STE 403 6503 ALASAN COVE
WAYNE,NJ 07470 TINTON FALLS,NJ 07724 AUSTIN,TX 78730 P 973 692 0222 F 973.692,0223 INFO@TRICARICO.COM
TRICARICO.COM
TRICARICOilifir . . , ARCHITECTURE AND DESIGN PC
r\k-1 ),
Added the Gray Trial Queen millwork shop drawings to the set for reference only. The
13 A610- Queen Gray trial room is no longer elevated and will not have stairs. All trial room
A612 fixtures will be on the ground.
A613- Added the Blue Trial Queen millwork shop drawings to the set for reference only. The
14 A615 Queen Blue trial room is no longer elevated and will not have stairs. All trial room
fixtures will be on the ground.
SUMMARY
Per Casper's request, we made revisions to the Construction Drawings dated 11.14.2018. The
primary reason for the revision is that Casper has decided to no longer elevate the trial rooms
and has omitted the stairs from these. The millwork shop drawings had been submitted to the
Dept. of Building via 11x17 formats and had included the structural engineers review stamp.
Those millwork shop drawings were approved by the Dept. of Building on 1.31.2019.
We have included the approved shop drawings in the attached pdfs for (3) of the trial rooms
(Storefront, Yellow and Pink). We have replaced the other (2) elevated millwork shop drawings
for the (2) trial rooms which will no longer have stairs (Gray and Blue) and have added these to
the set for reference. The intent is that these will have the same attachment details as
required.
Please review the detailed description above for more information. See also the pdfs of the
sheets associated with the changes. The sheets changes have been clouded with a revision
delta 1.
Please let us know if you have any questions.
Regards,
Denise Ambicki
Project Manager
Tricarico Architecture and Design PC
502 Valley Road, Wayne, NJ 07470
502 VALLEY ROAD 766 SHREWSBURY AVENUE,STE 403 6503 ALASAN COVE
WAYNE,NJ 07470 TINTON FALLS,NJ 07724 AUSTIN,TX 78730 P 973.692.0222 F 9/3.692.0223 INFO"=:-TRiCARICO.COM
CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2018-00331
TTGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/04/2019
Parcel: 151260000300
Jurisdiction: Tigard
Site address: 9685 SW WASHINGTON SQUARE RD C07
Project: Casper Subdivision: None Lot: None
Project Description: Tenant improvement for new tenant.
Contractor: JAMES M BARB CONSTRUCTION Owner: PPR WASHINGTON SQUARE LLC
10701 RANCHITOS RD NE PO BOX 847
ALBUQUERQUE, NM 87122 CARLSBAD, CA 92018
PHONE: 505-883-3666 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 02/04/2019 $2,253.55
Demolition
Occupancy Grp: B Occupancy Load: 24 12%State Surcharge-Building 02/04/2019 $270.43
Dwelling Units: Plan Review 11/26/2018 $1,464.81
Stories: Height: ft DC Provision Review,COM New-Bldg 02/04/2019 $194.00
Bedrooms: Bathrooms: Plan Review-Fire Life Safety 02/04/2019 $901.42
Value: $290,000 Info Process/Archiving-Lg$2.00(over 02/04/2019 $58.00
11x17)
Metro Const.Excise Tax 02/04/2019 $348.00
Floor Areas:
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $5,490.21
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Cod-s a ' all her applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issua if .rk is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification/ r. hose rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 50 or .800.332.2344.
Issued By: Permittee Signature:
Call 503.639.4175 by 7:00 a.m,for the next available in p ion date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
,1114 • Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family-Additions or Alterations
TI G A R D 13125 SW Hall Blvd. •Tigard,Oregon 97223 •503.718.2439• =w.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE(ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done, 290 0 0 0 0
excluding painting and wallpapering. [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 72,500.00
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line[2]of Valuation Computation): $
The Landlord, Macerich, has indicated that items a through f above are accessible.
The tenant space is fully accessible.
I:\B ulding\Permits\BUP_COM_PemiltApp.doc Rev.12/18/2014
r �
11 Building Division
Plan Submittal Requirements
T I G A R D Commercial&Multi-Family-New,Additions or Alterations
1. SITE PLAN (fully dimensional,drawn to scale) labeled with:
A. ® map&tax lot# /1 project name ►,t site address ® suite number
►1 zoning ►1 applicant name L phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the"Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans,details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey,and full set of architecture drawings.
I:\Building\Permits\BUP-COM PenmtApp.doc 03/03/2011
Building Division
.11
Plan Submittal Requirement Matrix
T G A R D Commercial&Multi-Family-New,Additions or Alterations
Type of Submittal #of Plans
(Includes new,additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing(site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing(building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval,the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County,and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Pemuts\BUP-COM PermitApp.doc 03/03/2011
City of Tigard
'I COMMUNITY DEVELOPMENT DEPARTMENT
■
T 1 c a R o Building Permit Review — Commercial - With Land Use
Building Permit #: L u/a,0/'—ail_;3/
Site Address: 9 �S „cI) 1 - � Suite/Bldg#: 007
n
Project Name: 620-C�T
(Name f commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: 77f n g - j
ILI Verifysite address/suite#exists and active inpermit s ste
Y
II ever Terrace Neighborhood: ❑ Yes No
1• and Use Case#: /(/T fl/Jf 0--0 ie 6()6 g
Pla atch Approved Land Use:
Site Plan \ ndscape Plan ether:
Cban Forestry Plan '\Mevation Plan
Building Height: Maximum Height •2OV ft- Actual Height /VC) e
.nditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance
►1 Business Licen :
Exists: LIQ Yes ❑ No,applicant notified to obtain business license
P ' ublic Facilities Improvement(PFI)Permit:
Required: ❑ Yes,applicant was notified No Applied For: ❑ Yes ❑ No,stop intake
Notes:
Approved by Planning: j % Date: AN Ot
Revisions (after Building Submittal only) Reviewer Date
Revision 1: A r
❑ pp oved CI Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: ///2 //f
Site Plans: # .
Building Plans: # --
Building Permit#: , Enter building permit#above.
Workflow Routing: [--'Planning ❑ Engineering C ermit Coordinator iaTBuilding
Workflow Sign-off: [Sign-off for Planning(include notes from planning review)
Route Application Documents: uilding: original permit application, site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
(4) 4/1
By Permit Technician: ' Date: //,Z /�
I:\Building\Fonns\B1dgPermitRvw_COM_W ithLandUse_060116.docx
Engineering Review
❑ Slope at building pad:
❑ PFI Permit#:
❑ Conditions "Met"prior to issuance of building permit
❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
❑ Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes ❑ No
Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No
LIDA Facility on lot: ❑ Yes ❑ No
❑ NOT Approved by Engineering: Date
,
Notes:
IN
Approved by Engineering: Date:
Revisions (after Building Su - ittal only) Reviewer Date
Revision 1: 0 Appr.-ed ❑ Not Approved
Revision 2: 0 % .proved ❑ Not Approved
Revision 3: d Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
li;DC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes Eir-N/A
Tigard Trans SDC: ❑ Yes �N/A �Q —1:- Lc-Ai--
Gra 5 1.7G-s -
Parks SDC: ❑ Yes N/A
OK to Issue Permit e/
Approved by Permit Coordinator: ��ate: 'll ;'f Cd
I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_070915.docx
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
9685 SW WASHINGTON SQUARE RD C07,
TIGARD, OR, 97223
Record Type: Record ID:
Commercial - Building BUP2018-00331
Inspection Type: Inspector:
299 Final inspection Jeff Grove
Result:
PASS - CofO
Comments:
Violation Summary:
Inspector Contractor