Permit CITY OF TIGARD BUILDING PERMIT
1111 ,-
I COMMUNITY DEVELOPMENT Permit#: BUP2019-00020
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/29/2019
T i� '�l'`1} 9 Parcel: 2S101 DD00500
Jurisdiction: Tigard
Site address: 6755 SW SANDBURG ST
Project: Reece Security Subdivision: SALEM FREEWAY SUBDIVISION Lot: 2
Project Description: Interior demolition in preparation for future building addition. Demolition includes interior walls,doors,and
plumbing fixtures.
Contractor: YORKE&CURTIS Owner: REECE HOLDINGS LLC
4480 SW 101ST AVE 25977 SW CANYON CREEK RD, STE E
BEAVERTON, OR 97005 WILSONVILLE, OR 97070
PHONE: 646-2123 PHONE: 503-803-7673
FAX: FAX 643-5531
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: DEM Type of Const: DC Provision Review,COM TI-Ping 01/29/2019 $98.00
Occupancy Grp: Occupancy Load: Permit Fee-Additions,Alterations, 01/29/2019 $509.05
Demolition
Dwelling Units: 0 Plan Review 01/29/2019 $330.88
Stories: 0 Height: 0 ft Info Process/Archiving-Lg$2.00(over 01/29/2019 $4.00
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $30,000
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $941.93
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You—obtain a copy of the rules or direct questions to OUNC by calling or 1.800.332.2344.
g 503.
Issued By: Al 7 , y --mil ee Signature: � a/��Al
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercialnit e,,' ` fi '' FOR OFFICE USE ONLY
City of Tigard Received /
DateB : d � � ._
NWII
11 111 q 13125 SW Hall Blvd.,Tigard,OR 97223 )~ 2 2019 Plan Review , , II' -
M Phone: 503.718.2439 Fax: 503.598.1960 .,_, Date/B : Other Permit:
T[GA R D Inspection Line: 503.639.4175 s Date Ready/By: Juris: 0 See Page 2 for
Internet: www.tigard-or.gov ; _ 7`;: —r.,) Notified/Method: Supplemental Information
s
TYPE OF WORK REQUIRED DATA:1-ANI)2-FAMILY DWELLING
0 New construction ®Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:6755 SW Sandburg st. New dwelling area: square feet
City/State/ZIP:Tigard,Oregon 97224 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Reece Security Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
End of Sandburg St cul de sac off SW 72nd Ave. Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.:500 Permit fees*are based on the value of the work performed.
Tax map/parcel no.:2S101DD 00500 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Interior and canopy demolition in preparation for future building addition. Valuation: $$30,000.00
Demolition includes interior walls,doors,and plumbing fixtures. Existing building area: 10512 square feet
New building area: N/A square feet
0 PROPERTY OWNER 0 TENANT` Number of stories: 1
Name:Reece Holdings Type of construction: VB
Address:25977 NE Butteville Road Occupancy groups:
City/State/ZIP:Aurora,Oregon 97002 Existing: B
Phone:(503)803-7673 Fax:( )
New: B
0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
Business name:Cida,Inc. {Please refer to
jee schedule)
Structural plan review fee(or deposit):
Contact name:Leslie Jones
FLS plan review fee(if applicable):
Address:15895 SW 72°d Ave
City/State/ZIP:Portland Oregon 97224 Total fees due upon application:
Amount received:
Phone:(503)226-1285 Fax: :( )
E-mail:LeslieJ@cidainc.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System.
Business name:Yorke&Curtis Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:4480 SW 1018`Ave Solar Installation Specialty Code checklist.
City/State/ZIP:Beaverton Oregon 97005 Permit fee(includes plan review $180.00
and administrative fees):
Phone:(503)646-2123 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lic.:55644 /, -
r Total fee due upon application: $201.60
Authorized signature: ,rte, This permit application expires if a permit is not obtained
��J^ . _,..---t___, This
-)
within 180 days after it has been accepted as complete.
Print name: Lest,e ,, ,,
,, Date: j(2.' J I-1 * Fee methodology set by Tri-County Building Industry
I` Service Board.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
City of Tigard
INCOMMUNITY DEVELOPMENT DEPARTMENT
T I G A R D Building Permit Review — Commercial - No Land U s e
Building Permit #: t(10/10/ -J—000-20
Site Address: (Q16 s \ni &kil ,b.(Ai Suite/Bldg#:
Project Name: Reece Secant
(Name of commercial business o c pying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: l y LW[IY, C&r(10.
Existing Business Activity: Njt.
Proposed Business Activity: l
Verify site address/suite# exists and active in permit system.
E iRiver Terrace Neighborhood: ❑ Yes � No
IA Zoning: C- P
Permitted Use: ❑ Yes ❑ No g Spec Space
1 Confirm no land use required.
-Business License:
Exists: ❑ Yes No,applicant notified to obtain business license
(AppeaeGrl
)t1l'�G� - - ( �
StZO 1 g-woo2 I A pp1 tC-vt- w%1 dYJ�
tiI
Approved by Planning: AnN&O—CeiPLDate: I `2R I 19
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: l l Q`9 /! 5
Site Plans: # 'd' a
Building Plans: # „Z
Building Permit#: §.-Enter building permit#above.
Workflow Routing: Tanning oor a r Building
Workflow Sign-off: Sign-off for Planning(include notes from planning review)
Route Application Documents: Building: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes: Tki-kr/ �r `/ -u-r riot l� • Jar-/ /7�' ��ihu7�/ lc ►�GVGc/ -1-71/9;
By Permit Technician: Date: /
I:\Building\Forms\B1dgPermitRvw COM_NoLandUse 060116.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: "Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
0 SDC Fees Entered: Wash Co Trans D--` ax: 0 Yes 0 N/A
Tigard Trans . DC: 0 Yes 0 N/A
Parks i C: 0 Yes 0 N/A
❑ OK to Issue Permit
Approved by Per Coordinator: Date:
I:\Building\Forms\BldgPermitRvw_COM_NoLandUse_070915.docx