Loading...
Report -eac• Capitol RECEIVED Electric Co., Inc. JAN 7 2019 CITY OF fIGARO January 3, 2019 BUILDING DIVISION Plans Examiner City of Tigard Building Services 13125 SW Hall Blvd. Tigard, OR 97223 Re: Tenant Fire Alarm System Additions Compass Oncology Tigard Corporate Center Building A 12123 SW 69th Avenue Tigard, OR 97223 Please find attached building and electrical permit applications, three sets of plans, calculations, and product submittals for the fire alarm tenant improvements at the address shown above. Occupancy Group: B The fire alarm system design includes the following: 1. Relocate the existing FCI FACP behind the front entry desk. 2. Reuse the existing 2 phone lines for offsite communication. 3. Relocate (1) manual pull station near the front entry. 4. Relocate (2) existing duct smoke detectors and (2) fire smoke dampers. 5. Install new ADA synchronized fire alarm notification devices in the tenant space including (30) horn strobes & (103) strobes. 6. We will pre-test the fire alarm devices prior to requesting a final fire alarm inspection. Please contact me if you have questions or comments. Respectful) , Shane Tercek Project Manager/Estimator Fire/Life Safety Division Capitol Electric Company, Inc. (503) 262-0405 Direct shane@cepdx.com NICET Level III, Fire Alarm Systems #140599 11401 NE Marx • Portland, Oregon 97220-1041 • 503-255-9488 • Fax 503-257-7121 CCB# 48748 • www.capitolelectricco,corn Turner Submittal #28 31 00-4.0 RECEIVED 28 31 00 - Fire Detection & Alarm System JAN 7 2019 Turner Construction-Portland Project: 181019-Compass Oncology-Westside Cancer Center 1155 SW Morrison St.,Suite 600 CITY OF E IGARD 12123 SW 69th Ave Portland,Oregon 97205 BUILDING DIVISION Portland,Oregon 97223 Phone:(503)226-9825 283100-04 Fire Alarm System - Resubmittal SPEC SECTION: 28 31 00-Fire Detection&Alarm System SUBMITTAL MANAGER: Eric Mishler(Turner-Portland) STATUS: Open DATE CREATED: 12/14/2018 ISSUE DATE: 12/14/2018 REVISION: 0 RESPONSIBLE Capitol Electric RECEIVED FROM: John Uhl CONTRACTOR: RECEIVED DATE: 12/12/2018 SUBMIT BY: 12/14/2018 FINAL DUE DATE: 12/28/2018 LOCATION: SUB JOB: COST CODE: APPROVERS: Steven Castaneda(Corgan) BALL IN COURT: Steven Castaneda(Corgan) DISTRIBUTION: Ryan Haggerty (American Heating),Mark Morton (Chown Hardware),Steve McCourtney (Delta Fire),Michael Schneider (Turtle Mountain) ,Eric Montoya (American Heating),Aaron Davies (Dallas Glass),Kraig Goode (Dallas Glass),John Uhl (Capitol Electric),Ann Westelin (Metro Overhead Door),Sean Dyer (American Heating),Barry Kenfield (Metro Overhead Door),Tom Eback (Turtle Mountain),John Tuttle (American Heating),Scott Unholz (Capitol Electric), Brent Bodwell (Dallas Glass) DESCRIPTION: Revised fire alarm system submittal including all revisions required per design team.Please review for general conformance with design intent and provide engineer stamp on each floor plan. Please expedite review as revisions included are minor and response time has schedule impacts. ATTACHMENTS: 983100-04 Fire Alarm System-Resubmittal pdf SUBMITTAL WORKFLOW RETURNED NAME SUBMITTER/ SENT DATE DUE DATE RESPONSE ATTACHMENTS COMMENTS APPROVER DATE • Steven Castaneda Approver 12/28/2018 Pending BY DATE COPIES TO Turner Construction-Portland Page 1 of 1 Printed On: 12/14/2018 03:53 PM NNSI ) iEC JAN 7 2019 EIVED CITY OF TIGARO SUBMITTAL COMMENTS BUILDINGDIVISION EXCEPTIONS NOTED X NOTED [ ] RESUBMIT FOR RECORD Project Name: McKesson Tigard Cancer center [ I NO RESUBMISSION REQUIRED REVISE AND RESUBMIT WSP I USA ID# REVIEWED FOR INFORMATION ONLY Date Received UNREVIEWED Corrections or comments made on the shop drawings during this review do not relieve Description 283100-04 Fire Alarm System - Resubmittal contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of Action: NO EXCEPTIONS NOTED this part of the project and general compliance with the information given in the contract documents. The contractor is responsible for providing all information Fabrication,manufacture,or construction may proceedproviding submittal necessary for this review: confirming and correlating all quantities and dimensions: selecting fabrication processes, techniques and sequences of construction; complies with the Contract Documents. coordinating work with that of other trades and performing work in a safe and satisfactory manner. Notations on this drawing do not authorize changes to the contract documents without written authorization from the owner's representatives. WSP USA RAMYADEVI PRAKASAM 12/26/2018 Comments Additional Reviews by: WSP Response: 1. Confirm the finish with the architect. 2. Confirm the system address and Labeling methodology with the owner.