Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PFI2019-00011
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 7111 a • COMMUNITY DEVELOPMENT Permit#: PFI2019-00011 T t G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 01/28/2019 Parcel: SEG2160 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Comcast Project Description: Comcast proposes to bore/trench to place(2)-2"conduits for a total of 934'and overlash along existing aerial facilities for a total of 344'within City of Tigard ROW Owner: FEES Description Date Amount PFI Permit Fee 01/17/2019 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: ALEX SI LANTI EV 11308 SW 68TH PKWY TIGARD, OR 97223 PHONE: 503-941-8656 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: �( Issued By: M Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00011 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice . . RECEIVED City of Tigard JAN 0 9 2019 '1 PUBLIC WORKS --- ENGINEERING CITY OF TIGARD 114 It Yt 1...ialokill Public Facility Improvement (11TIMParG TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) ❑ TYPE 1—Franchise Utility Work Check one: ❑ Utilities 0 Sidewalk/driveway approach 0 Streetimprovements performed by N\\N, PGE �P proposes Detailed description: Comcast �- lace oses to bore/trench to ro 2 2"conduits and/or utility agency. for a total of 934'and overlash along existing aerial facilities for a total of ❑ TYPE 2—Sidewalk/Driveway/Sewer Work performed for the purpose of: 344'within City of Tigard ROW. • Sidewalk installation or repair. SW 109th Ave&SW Highland Dr to • Driveway approach installation Property address/location(s): g and/or repair SW Royalty Pkwy&SW Kable St �..e &/(.e 0 • Sanitary sewer lateral installation and/or main line tap Alicanr: Comcast ❑ TYPE 3—Full scale Development 1 P Work performed with Land use Address: 11308 SW 68th Parkway approval which includes any of City/state: Tigard,OR Zip: 97223 the following: Phone: (503)596-3733 Email: Aiexander_Silantiev@comcast.com • Subdivisions or Partitions •Alex Silantiev (503)941-8656 Street widening Contact name: Phone: • Mainline installation for Sanitary Contractor: Paramount Utility Corporation sewer, Storm sewer, Tigard water and/or Tigard Water Service Area CCB#: 213318 Expiration: 01/17/2019 Address: 27560 Hwy 212 Unit B SUBMIT COMPLETED APPLICATION TO: Cite/stare: Boring,OR Zip: 97009 City of Tigard Phone: (360)349-9894 rennins aramountutilit .com Planning/Engineering Email: 1 g @p y 13125 SW Hall Blvd. Contact name: Rick Jennings Phone: (360)349-9894 Tigard,OR 97223 Applications 611"tutor work in right-of-way" 1 n`sneer: K&B Technical Solutions only may be entailed to: Address: 6566 SE Lake Rd rowperrnits(ti tigard-or.gov Milwaukee,OR 97222 FOR STAFF USE ONT.Y City/state: Zip: Phone: (971)282-6759 Email: Shane_Langley@kbmail.net Case No.: ?f' Of9--neo!r Contact name: Shane Langley Application submittal fee(.007%of Engineer's Estimate) S Estimated value of work is required(if over$5,000):$ Additional fees: S --3dd--- (within (within the public right-of-way) Application a cepted: r (� iBy: Date:_ ly 1 / / c1 Is work related to a LAND-USE DECISION. ❑ Yes ❑ No Applic• .- ed: If so, please specify(MLP,SDR,SUB, etc.) case #: ' 0V/ft' By i Date: Is work related to a BUILDING PERMIT? ❑ Yes ❑ No Ap ca t notified: If so,please specify(BUILDING PERMIT)case#: By Date: /11 i 9 1 ) I:\ENG\PermitApplications\p6_application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of APPLICANTS NOTE: Person specified as`Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S)SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions anti limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. 3-Zar" 4-4" Applicant/Authors gent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date • PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • 'Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 ^293!4210 I $ (R+'25 $ END UNDERGROUND CONSTRUCTION AT a EXISTING UTILITY POLE IN CITY OF TIGARD ROW • SEE SHEET RP2 FOR AERIAL DETAIL w i B S fz a • I- 0 14999 • 9 rn U) BORE AND PLACE(2)-2"CONDUITS f A MIN OF 36"BELOW GRADE 8 I (TYPICAL) > $ 15400 1 R I)) .>-'- 1 i \4 4,�\L�i ST �,�_�\ 1 s�1��` \ .Dry 1 1 L. wow waw rtow�'aow roc sem ..-,,,,\ \ ro< wax rot— \,q,, oc 10950 I �\ c„ SW NEVE STL t�L�-wL REMOVE AND REPLACE(2)-5'X5' ..1_. \,:.,f,1, 2 FLAG OF SIDEWALK FOR BORE PIT '> E , roc r _ EXISTING PEDESTAL-te l r 6. 5 -5 x of s/�r-FOC FOC----r.---T____---"'c sl y, g l ir 15495 P °x'�^ax Spar\ I ; i c 1 : 4 1-- : 1.:R r j i 11 ` Q 10874 10828� � � I I15580 uI I - - ` REMOVE AND REPLACE(1)5'X5' •-j,:1,-;-' \ S .-FLAG OF SIDEWALK FOR BORE PIT 1 ' f 15510 R 15515 N EXISTING PEDESTAL ': x t& 10855 Th.,- W i REMOVE AND REPLACE(1)-5'X5' /" FLAG OF SIDEWALK FOR BORE PIT o I — EXISTING PEDESTAL ' he . S \ — — ` — S ` A R u 15530 V 7 x r ......—......._.._.. f 15525 15'FROM SEWER...I - 3LY FROM SEW( -- es >< I 9'FROMWATER...... i K ^w iii . _. ,EsF-4 4gi i g , _ 10665 111t0 2 i k rt1akl1 I won�x)S S N aatl MI5 DDf I _ xJs�f'°'\g �D 15550 H pn O� �Lf ` o W R= I.� z- c______WILLO C/ _ \ J 1111 I zp �°,-----!-----t- 1 3 / 10875 p m JS`'a"--1 I S N I / \ Q,��j 1 IAD ,_______,-----______________—.0 — waw / }I\ g -tmn D m " G }{ REMOVE AND REPLACE(1}5'X5' m O A m BORE AND PLACE(2}2'CONDUITS A l FLAG OF SIDEWALK FOR BORE PIT O Z r^ MIN OF 36"BELOW GRADE 1 Q n O a ?(.-I (TYPICAL) 15550 \ / / j 0 O p / BEGIN CONSTRUCTION AT EXISTING ••,`; " \ / F CG NO OT mo PEDESTAL IN CITY OF TIGARD ROW '�• W p m p / 15565 • S s %9 r??, ,, A N, .','-.--------A. . ".- c) CQ V\ \ • b %,.(1C z > m il ..,, DESIGN 8Y X d B TECHNICAL SOLUTIONS C s 15525 SW 109TH AVE DALE DESCRPT1ON DESIGN DRAWN C O M C A S T • TIGARD,OR 97224 A OWAB'19 CABLE/FIRER PLANT EXTENSION S.L. B.M. o g T TECHNICAL SOLUTIONS Y $ V 6 Contact:Alex Silantiev - - - - 62955 Phone: 503 941-8656 ' PO BOX 2529,Clackamas,OR 97015 Office-(503)fi50-6041 Ext.212 CABLE/FIBER PLANT EXTENSION Atex_Silantiev@comcast.com Email:Shane_Langley@kbmall.net - - - - CITY OF TIGARD ROW PERMIT DRAWING / w\..H / • / 14999 / W 44,,,,, ���"�L7C[ \qp. // o- ` \ r N, µJ Nc., iF`w' V� /41 1 1 1 \NO `V i',ow BpW---1" P •EN END AERIAL OVERLASH AT EXISTING UTILITY \ POLE IN CITY OF TIGARD ROW �O�P� _..„-7 SEE SHEET RP3 FOR UNDERGROUND.DETAIL S\1\\ NN 139 urd1 11 ®*:'S 10888 1 $ 1 _ ea. 1 10856 y Mpb bAb MOa� 1 / B w ROW v Ili / 1 / 1 / • 1 / I1 / Moa Moa 1 1 / 3 j / I I 4 • • 394;;0'1'::2 t. 10832 (,'y I O H —1-———— m 0 14999 • f ct 1 i ;i • E I BEGIN AERIAL OVERLASH AT EXISTING UTILITY POLE IN CITY OF TIGARD ROW SEE SHEET RP1 FOR UNDERGROUND DETAIL 15400 2 933509522 ;2 y*25 a s \4O ry Ski, ---,,,/VA \p N \ M NpbJ ) i SE \y 'C'A q_ /ppN a'``te �r 0 70� D ` \.wpm I SCALE: 1"=40' DESIGN BY K A B TECHNICAL$GLUTTONS Ci �t�� © �� DESCRIPTION DESIGN DRAWN 15400 SW 109TH AVE CO" CAST TIGARD,OR 97224 O ; T. TECHNICAL SOLUTIONS 01rU&19 CABLE/FIBER PLANT EXTENSION S.L. B.M. ET: 6 6 Contact:Alex Silantiev p0 BOX 2529.Clackamas,OR 97015 62955 N) Phone:(503)941-8656 - - CABLE/FIBER PLANT EXTENSION Office-(503)650-6041 Ext.212 Alex_Silantiev@comcast.com Email:Snane_Lan3ley@kbmall.net - - - CITY OF TIGARD ROW PERMIT DRAWING f s, §1 / / _.. �-'I 2 I ; i / I" --,14- Pt; ',0;$i Ilei# > 4 R I +Tr ,,i1,11: ,^ ' i/ , ; ,t '_1. c„_....,_. - ,,,...17; 7 w ea I/ R ' � x A w O N, Q r Emnq Ay zP // R OAN 1S OT- / ° 9, Z� r0 1Si +\ O m m r-,1 z F e Z 5 m // R Ao O Lr I / .� p A - / D n m m O i' .$' rr-� N p CA, ' .. / mZ m A 1ASmm�o N cnm8oQ /// � m80 o R' t m , / � x r_0?..;,., //:// �+° ONi s° S' .• o A /// ,c4.�a 71 2• `; •; P m r;01 R /N , ., ,,, / Z ,„ //I 1 ,,,,, /.. e ,DO �zm : / n / r OO/1/ riil m D / m0 \ ' r m i:Iiii? Q ?, n 8 I i4 1 2 ? R I \ `, • R A II � \\ R \\\ \ 1 '. \\\ • 31.\\,/ R \ ,x.6-6 z:. \\ g y R \ :\\-\ - '\\'8, r______________, \\\ , ,,, PO! 4` \ .\9 \\ \A s\ z 4 \ 4 \r \\\ "OM N \\\ ' MON_ MpI i MOtl MON \S/N `ROW MOM MOM MON MOM s ♦. \C� �OC__S/N_ d03 M03 \ rOC�_SAY,--,,, Or 1 a. c� rQC roc 4 Q moi% \ Oil - I g vD ,/O vO s 4 c L SW 109TH AVE ,, to v n m _cis-_ c/L A-c,a... c C-1.-14; Q QQ -. EDV y Z m n c z , --R-,_ i 1 Moa MON I 2g—f3 O �'T' MON -_---MDb-- MOM-- MON I. m /i ) V7. Tom- AFDC MON A�-A-MON /l,` N,Q Z CS / •ao, S/M. _�rOC rDL I� ,0c -5"), -E-,i, N cv £?y R tr M—� M��—Motl S�MOM 'j 'n / MOM -C-?: Az P tiggm .4/ r7 i > i= . 7/ T. y,, DESIGN BY N 6 B TECHNICAL SOLUTIONS z �� , tt� 10888 SW KABLE ST DATE DESCRIPTION DESIGN DRAWN N R 10 C O M C A S T TIGARD,OR 97224 m D1I09'19 CABLE/FIBER RUNT EXTENSION S.L. B.M. a ; � m. TECHNICAL SOLUTIONS w 6 Contact:Alex Sllantiev PO aox 2529.Clackamas,OR 97015 - - - 62955 CO Phone:(503)941-8656 Office-(503)650-6041 Ext.212 - - - - CABLE/FIBER PLANT EXTENSION 3I Alex_Sitantiev@comcast.com EeAII:Shane Langleyjkbmall.net - - - CITY OF TIGARD ROW PERMIT DRAWING Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way N roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT) with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3— Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340 — Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4) should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the "Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 September 2016 2011 Edition Page 85 N Stationary Lane Closure with Flagging Diagram 320 CDN j C ., \ o ` o o •,,,,,f, X co to m '�o� 't $ c aiLL Wmo_a~m , m \ w0 A I— \y �, ¢ .,\,\\/,/ ..„...PZI • CD c • UI • • c. a s *0E. ---.� I o o U -- m� t m •I 2 O�%� <� I 5E r n',_ . ... 3 • 1..., d, • „, > ,P6 • m 0 •• 1 • ,. . I, �, _ •.... • .. d E • m °$ I.• . .., _ 0 • 03o I elm0 � Igym/ —ycc 0 mw�11v o / (n U / \ Or i^Sign Spacini;and Buffer Lengths{feed1tV \Posted Spacing Between Signs "Buffer" Z o ctsCSpeed A B C Space �,; g 0 O 20 50 Z Cr Q O 25 100 100 100 75 30 100 - 40 350 350 350 150 0 \ 45 180 Or 50 500 500 500 210 \:C ¢ 55 250 60 285 65 700 700 700 325 70 365 September 2016 Chapter 5 Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths (feet) N Posted Spacing Between Signs "Buffer" Speed A B C Space co 20 50 25 100 100 100 75 30 100 35 125 350 350 350 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 _ 70 365 Chapter 5 September 2016 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 ROAD WORK AHEAD ONE 1 1 (optional) now A AHEAD RE B PREPARED - TO STOP . W B A (Optional) • • ONE UNE . BE ROAD • 1001.Max. PREPARED ROAD I_ • TO STOP! • WORK AHEAD I A B B C E . •• . CD vrsv • 0 • -• 100 ft.Max. I I'1 C B B A I1 1 TT ROAD BE • WORK PREPARED • AHEAD TO STOP 100 R.Max. ONE LANE • ROAD • AHEADTt • (optional) A V V ' BBE PREPARED TO STOP B (Optional) M 1 ONE LANE 1 1 • ROAD C AHEAD ROAD i WORK AHEAD September 2016 Chapter 5