Report cCl+n l.,' 7409 SW Tech Center Dr,Ste. 145
Tigard,OR 97223
Ph:503-443-3799 Fax:503-620-2748
503.443.3799 Special Inspection
Final Report
Date: 12-21-18 Job# 18-8422
Permit#BUP2018-00259
Mail To: Project:
HPS CONSTRUCTION COMCAST TIGARD DIESEL TANK
PO BOX 890 11308 SW 68TH PARKWAY
CORNELIUS, OR 97113 TIGARD,OR 97223
JOB#COMCAST AST TIGARD
To Whom It May Concern:
ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or
Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed
For the following:
Concrete Construction
Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf
of ACS that work was performed to the best of my knowledge, in accordance with approved plans,
specifications,and the applicable codes and standards for the jurisdiction.
-6P\0(724 Ad,
Approved by:
Bob Brown/President
BB/sa
•'a,,
4
YE't'41(1 �A' i'{° .a,i131#sl;fa , hC.:a,.ax.eisdo_a.. .
ACCREDITED