Loading...
PFI2018-00342 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT lir, COMMUNITY DEVELOPMENT Permit#: PF12018-00342 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 12/27/2018 Parcel: SEG2357 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to 9469 SW Brentwood PI. Replace and repair underground facilities. PGE job M2495683. Owner: FEES Description Date Amount PFI Permit Fee 12/27/2018 $300.00 PHONE: Contractor: PHONE.- FAX- Applicant: HONE:FAX:Applicant: DESHAWN WILLIAMS 10800 SW AVERY ST TUALATIN, OR 97062 PHONE: 503-718-6301 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: Issued By: .L Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00342 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District) and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.) as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. Brady Bullinger is the inspector assigned to this permit(503) 718-2611 PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard DEC 13 2018 PUBLIC WORKS — ENGINEERING CITY OF TIGARD `/FN _1 g Public FacilityImprovcmcrit (PFIYPermit 'TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) TYPE 1–Franchise Utility-W'orl: Check one:V Utilities ❑Sidewalk/driveway approach ❑ Street improvements performed by NVVN, PGE Detailed description: Replace and repair underground facilities and/or utility agency. ❑ TYPE 2—Sidewalk/Driveway,/Sewer PGE Job M2495683 Work performed for the purpose of: - Sidewalk installation or repair. • Driveway approach installation Property address/location(s): 9469 SW Brentwood PI and/or repair Tigard, OR 97224 • Sanitary sewer lateral installation and/or main line tap Portland General Electric ❑ TYPE 3—Full scale Development Applicant: Work performed with Land use Address: 10800 SW Avery St approval which includes any of City/state: Tualatin, OR Gip: 97062 the following: Phone: 503-718-6301 Email: preregcoord@pgn.com - Subdivisions or Partitions Contact name: Deshawn Williams Phone: 503-718-6301 • Street widening - Mainline insrallation for Sariitall Contractor: Potelco sewer, Storm sewer, Tigard water 76668 and/or Tigard Water Service Area CCB#: Expiration: Address: 14103 Stewart RD SUBMIT COMPLETED APPLICATION TO: City/state: Sumner, WA Zip: 98390 City of Tigard Phone: (503) 863-7067 Email: jmlenhart@potelco.net Planning/Engineering 13125 SW Hall Blvd. Contact name: Joe Lenhart Phone: 503-991-1517 Tigard,OR 97223 Applications for"minor work in riglit-ref--way" N/A only may be emailed to: Engineer: rowpermitsCtigard-or.gov Address: FOR STAFF IJSE ONLY City/state: Zip: II,,..,, ,,,,, ,�22 Phone: Email: Case No.: DFA%zolb r �3 Contact name: Application submittal fee(.007%of Engineer's Estimate) $ Estimated value of work is required(if over$5,000):$ Additional fees: $ &0 (within the public right-of-way) Application accepted: a— Is work related to a LAND-USE DECISION? ❑ Yes V No By: K Q Date: Application reviewed: If so,please specify (Nff.,P,SDR., SUB,etc.) case #: !� By: Date: Is work related to a BUILDING PERMIT"? ❑ Yes ❑ No Applicant notified: L n If so,please specify(BUILDING PERMII�case#: By: Date: 1� I:\ENG\PermitApplications\pfi_application Rev.10/16/2017 City ofTigard - 13125 SW Hall Blvd. - Tigard,Oregon 97223 • www.tigard-or.gov - 503-718-2421 - Page I of4 APPLICANTS NOTE: Person specified as `applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the cite pursuant to TMC 15.041.140. With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the. owner. The owner(s)must sign this application ui the space provided or submit a written authorization with this application. Franchised Utilities arc not required to obtain the owners signature on the application BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT: • flue above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject propert • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. Steve Hursh 12/13/2018 ,=applicant/authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SW Hall Bhrd. • Tigard,Oregon 97223 • ww-,vtigard-or.gov 503-718-2421 Page 2 of DEVELOPMENT ENGINEERING FEESFOR STAFF USE ONLY Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL REQUIREMENTS APPLICATION FEE Part 1: Required submittal fee$300.00 (nnuni munn) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch (including information below) Engineer's estimate X 2%Plan Review ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following n-pes of work: Design Plans • Sidewalk repair (less than 20 lineal feet) (C,sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,:kbbreviation,Legend • Ditch cleanuig that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • V'eep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance maybe ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (e us tom er deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm Nater Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SW Hall Bhrd. • Tigard,Oregon 97223 • w•wwtigard-or.gov • 503-718-2421 • Page 3 of4 5 SAMPLE SKETCH: Edge of Pavement ! Ditch Streetligfit ! 4 ■ ■ ■a■i■ ..�■i■ ��i■ T" 7M—17 fr54vweI-lne . I N Existing House • -=' I Existing i I >1 Drive ay 01 ot C� rti I f • .0 I 1f 1 2 I a ■ I Existing Shop Powerpole j o . o — 7ieper-ty Line- I I . � . Fire Hydrant(FH) I I ! I I Scale: 'I'=30' � I I I I I I ! I I I I I ! � MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable): North arrow Property lines & dimension Slope or= property Street &street name(s) Existing building, structures Utility & street-light poles Proposed work Existing curb or edge Trees Existing S/\X-'or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SW'Hall Blvd. • Tigard,Oregon 97223 - wwwtigard-or.gov 503-718-2421 Page 4of4 1 VT-, 9 Wsw I Invall:pN: I Nn ELBOW qr-MTD ueLE-Ru o nw ELBOW la"JIRD CABLE' 12AL Namw ........fuefFrreelsaeser Rem eSNt (2)ELBOW AOT•JKTD CABLE 02AL EL.6CW gT•JKTD GBLF-pK CSO M7fNOTE'TRANSFORMER TRANSFERRED FROM CO TOW CONWC/O✓tS NN{ NOTE:TRANSFORMER TRANSFERRED FROM BE TO CO. < !W{AKffIN OR WL II VT-2111NEW VAULTI'. ��_����• LL•rtw{4K~� ! Fent + fm•1tar�iF I' rs C6021e71 a,U Instal: • _....... wmasnwa+ rrsrua ossa • Fon,[ u Mm{• • 9U3M89-VAULT CONC.56`4N112OD 11510Tr �n Comm pt NN N+ csD x1656 9039640-caNO DBL NON3uP VLr uD ssxN112 ns9n�l4 -....... -w.♦.r L IOVT-lW(NEW VAULT): nm LATERAL TAP UNTO PS-3 PHASE -------- aro�+a rr1 •s Fw Nge9 M >W SMF SM (6)ELBOW gT•JKTD CABLE-IJ➢AL __... u•eRNRnreu pm $MOM DBLNON-MUPV2.ODUV{7T NN NN NN Sw +ua m Y,o ,aN EL80•V KR-JI(TDUBIE-�lAl S TERAIL AP UMT BL NON HA VLT UD 56YN11T 571L6T/1M (8 DW T CAP LATFJIAL TAP UNIT•4 PS3 PHASE SISe °f°0 fear.v u..eo.ee wsse,umw., (61El8CWgT-JKTDCABIE-1.OAL 77 tm ,{Y{ (31EL0CNICT-JKTDILIE-0741 I n C9Uf1A4ENT 3 OUST C.. i ,Nx WL9V-Mi. Ltx VT-T]06: O susru..{n.c na .vww ri,r sn.na. MaW In 3U ELBOW KST-JKIII CABLF112AL 3U39054-DOVER.CULT,CONIC,STEEL GRATE VEMEO, / su nruPu.w-..rr Nx Ramwe: Se'1ITO CABLE -X2AL 01 ELBOW gT•JKiD CABLE RAL MFt r- e01• (2)ELBOW qT-JKTO CABLE PNL I Remwe. - nr.rzw wawa rrw+ I . SW9654-COVER.VAULT.CONC,STEELCRATE.VENTED. NOTE-.TRANSFORMER TRANSFERRED FROM AB TO C0 CMN rrs.wu.,u.wauro•m v wr,w4 38.1 I TD CA.ISOIhO6lJe)ELBOW qT-MTD CARIE-0241 NOTE'BORE UNDER FOC NOTE'.BORE?-2 I IYN 1 BEHINDCURB If NOTE:TRANSFORMER TRANSFERRED FROM CB TO BB ,Mu Le VT-1 W. W° 131 ELBOW qT-JKTD CABLE-IJOAL I 4 ,w•° ElBQV10T-JKTD CABLE-02AL N' 1M�ri B ]]r1e N w{ Remo.. (3)ELSOW qT.JKTD GBLFRAL _ nf[o ••SdIA9YJ:RFEl1JW 1['•• ISp�f AOWINM NORM Y Nff w � c6e�61 M ,MN Awn wLsvra.: JK w 5R"� , LUN InsW. p, eN1H/6 O1. SKN »•N e[oo (2)ELSOWIOT• TDCABLE-F2AL Hse Ramo.e: ISONN 9TH ELBOW ICT-JKTD CABLE•RAL �F e •N tAT 1 CNC! IW ■Y N n wl[ leex •2Np!ySol- ----------------- 'A 1834 nms v,-[•,a �L•1M VLII •__.L'L I,l:;: _-NC,NM•_IIX•' B1.L-tir •ON • - I vFlxf ri♦ n NN I nm C2 1.11D Fw Flw Yle +1`Nn t Y ,Na vA RE UNDER CUR 4416X1 Iw{v IN A5011N6 —.4-4481—VAULT). r9i ...-VAULT CONC.56'66Y 42001lV.04 _ 3 W98N-LDNG.NON-SLIP VLT LID 5613618' s•nxN v{elN •°N I LATERAL TAP UNTO POS-t Pw1SE A100.145 ,•, + III s{so NOTE:BORE?-T 131 ELBOW QT-JKTD CABLE- .w ,wl x ,•,Jj��t 1{e{ x44 Ym_ 11 BEWND CURB OUST LAP we n 7 Nn 11111 ,wf I ,{ n» Fwr I ,sAe e66Xa1 g L7 yr-1x2: W11 ASO1p59� NqN. Nm ___•s�; »„s {� arnx{ A-13g (2)ELBOW WT.JKTDCABLE-RAL i0•e° ,elN °1A 3 ■vim }, Rem we: yY _. ,wF 2 EIHOW KR-JKTD CABLE/UL � �°za ai ,N tms iw KWSERIVDP I 1[m[ £ ,wN + WL 2 VT.14925: 4 rM 9»tN: NOTE:BORE?-3' el4f (2]ELBOWgT-JKTDCABLE-RAL BEHIND CURB >�• eP Remwy ,[ pn Ym x 4 2 E CVVFQT-JKTDUBLE L -RAL 'snF+* {Nt n n NOTE9 BXP1� I •,, ,tn1 W7 foe 1{0 Remora18PD-T1.MUST MVHTAN 5 FT.HORIZONTAL SEPARATION FROM AN RS E1,KMJKTDCAM_Ei RAL WATER MAINS AND I FT.VERTICAL SEPARATION IBE— FL e . Fo�W y VT-1x1'. INSpw 2.NNNTAw 1 FT.9EPARATION FROM CItt OF DGPRD ,ema ZB w 1{ Ingl: Jove ,t CATCH BASNIL (-2)ELBOW AOT-JKM CABLE-RAL QL 1 VT-14924: • ne ).USE)C N'SENDS,FOR OPEN BOTTOM VAULTS. VV Npel'. fleF Ra!31 ELBOW KIT-JKTD CABLE-0241 ' Itw I WTCHI G.lN LLBONSIONS ASSUME VIDE SUCK FOR 2a (2)ELBOW KIT-JKTp CABLE-RAL tm � I'F 51NTCHING.IPULL TENSIONS ASSUME 90'BEND7. RemwF: e,r[ 121 ELBOW qT-JCO CABLE- for , ebttl7 4.REPLACE ED U NODURA ROCS IF EXCESSIVE CORROSION i6 ,[A[ eeM• DISCOVERED DURING CONSTPUCTgH. eere NOTE:BORE?-3 ri ,NN 433<� AN19{N BEHIND CURB NM S.GROUND ABANDONED CABLE PER LC220]lr, {see C 15 56016 1•m , [°•° R , 8.CHECK CODRgMAIIDII OF STREET LIGHT FUSING. ,eiw ,•s,m n,o .;,�` ,YI{ nor L15 Pe1N1' ri SIMS Instal. _ 411 ari1S ELBOW qT-JKTD CABLE trNI Remwe: ,sore n er'T• D4 ELBOW qT-JKTD CABLE RAL N AFM MRSNOTE;FUASFORMERTRANSFERRED FM 8801614 FROM 80 TO AO f„ "v2 •'° wm wst wA w,e wNte{1e ,ans y .NOTE.SPANREPLACEDIN s�4 IISII NOTE BORE?-3' 3� WO.4243212' vxxm n < Y BE NDC ,ef s� »ses yye AN 2�9» »m _A76 Mall 3a tfN{ k n,o .ri u1 Cs02DNe ABC 75440 a ,smo p 1fm w» Asn 2 ro, ,141 Iowa wN Mm pN flee wm wm w,o wm ,w,e s-too,N BwwlSl •,NN �. CX53016 . MFN -,ylM � FFFtIw,naF "'• x,wn aecwa m OS C1d 10®T m K se0y �° ,m tri ewT ,NN Ass pY 82581Pp2� {•ll�wn vc�r ,sa>o Yw I ,[r[ � uvn B B 5015510 sa WL]VT-14923'. aw N{W s11. sae ,eow SWB854-COVER.VAULT.CONC,STEEL GRATE.VENTED,56'X56')(6'.(5048308-LAI BOW IGT-JKTD CABLE-02AL w,. •Y ,•an • Nu)ELSU38X4-COVER,VAULT CONIC,STEEL GRATE.VENTED.SB'XSS'AE.(SN Ld) C21-148 ,ww R ELBOW qT-JKTD OASLFRAL efa nsX ,,,x +N•• C I-14A 61030p1T INS • e662ewnn �+•.-' 1M°• ' sw MARa u pee ­_ C-24 �sY B 50 2Aaa f MMY y<41 FeFOen e •OI00 tNN ,e,•o »n MN tw wm w,o nro ww ,t•» N„ F°°e pA Iw SW MARTNAdr w IRAN 1{ne ,•rJ , 0 N N 1N F4 wN1♦F. ,[m ssoa f4f Ars rwa 1 ♦BSO 4_ � } 1-LINE DIAGRAM SIT raw •�•• W wn 6W1 I it sr i-�'""¢ ANY DEVL1710N FROM!F6 DESIGN MVS! ffAef'R_OF@_6Y THE PGE PROJECT MANAGER l w _ s-Tic Ry1+ •• C2 t.Ftp I SAFETY '°` _ 1I1aW I �ry FIRST �S,MSeFJAK I r• 1 lIMl__FY K ? '`•Q:,•,anY Nbti1C AREA MRS, W LYnY L +�� � � Iv,uJale n=e91 1er155t ,NDD5r64 94e1 fwyf-te eErEO r..,.REPLALEYFM.DYRHAII NCRTH J-I4mR rtIXIWOCIr'I-STVJDOWOOO LO s0.i1 a eA' Few AJ9Y �E/e�f1Y 6PL TFMA0.0R.<>21• F of 216+ G 1� • C2 F-1!A F. - \ WWIMOTON CMC CI1,ID C]11N 0211.8 YIINeN IVOFI Myr N a Of3HA5WJW Nli1N]e HELI e00YE0. LEGEND 14"M2495688 DURHAM NORTH K ----------- 10#2 EPR in 2"HDPE CONDUIT * 30 110 EPR in 4"HDPE CONDUIT VT-211 I I /'� VT-7358 t WM MAMTAM a R.HWrUpMtTIT�AL1L WARATKIN FROM VT-7380 :MARe AIO T R. FROM MWIFIN IMOW ) i AM 1 R.=PARAIgN Ory Oi 1gAl1O CATCH MSM& a USE 40'/W BEIM FOR OPOI BOTTOM VAULIS, FDD OUT foo ASOW ORAoe TO FROM MACK FOR 50TO 64(MILL 70000 ASSAXR 6END1 4.RVU09 ORO"RM IF EXCESSM NRROS�II IS colarrolucraL a NAND�BD CRAW PRELCfED20-]. VT-71 VT-7361 VT-155 II VT-7359 INBOOMM a OCCK TK ORBMAt10N OF STREET LMT FV73XC. --� I IP.9 � I ) I VT-7364 VT-7362 \ n n I I IP-2 VT-7363 --- I 1 PD-7508 \�VT-248 , VT-14925 I I IP-1 I I I I � I � I VT-14924 VT-14923 � ---------J it PRIMARY CABLE&CONDUIT TABLE TRENCH-FOOT TABLE ASRAaRr AMRFW6 ASIITM'OANTNIN COMM mr-gymIauTNM Im Am umm mom ruu ND GME Usorm LeN rrN 8 Orr um"Lewnl 1m) Rues ACIYAL Rev Oa1BN Acnes FX•.AI.I'o..rb. a")le IRI Oe4 AcnRU es PFAU To ((U IRI INFI IMI BSBT,w IN IN lom 140 VT. vt.A 1 I M x x Atu m `"•"'R' "' TRANSFORMER LOADING Vr• W-34M 7 1 Au AS AS Uu AD M •f-3416 LON w- yr-16 x I 3a IN 1Q nu em n VF.l m 1 ml MAIN sfM we JLV"ANVW n-um W.>ts vT-Mf PF?m 2 1 D D "a w W441 Tem L A D AD1lAIUO+bAwFl NO vT-SRI TY 2 1 ll*m 33 31 UAL 1D vT-sem m 1 A D AD]MM117CM ) NO id yr-TIM vT-7m 7 1 BIT ]7 M RAL m n W-�7 Im K-TIM vF71U 2 1 Im 25 25 AM 1T/ n YT m A 75 l0l] l NO of-TIQ K-Ifs 7 1 ]! D ON ffi A 10 ASp1]ee]OOILewlwn NO W.n W-105 . 1 ]e1 O] la Al ]x0 �'� R. 1 A Se ADr035 f NO W-I14 W.lam 2 1 m 25 ]I UAL 2m vT-TIM M x 21 A D ADri7llO NO vTJI 1R-T1U 2 1 ]s u iS UAL I" N'� IA D ASOMM(A0L1tlwINN NO YT.T vPT1 x U71 yr-1f1 rr.rle r 1 10A U a UAl 12. Af Ks c D cDroMf No vT-O vF.lu A 1 AD m m u m A vrTw C D CD 5]111 uc— NO vFTIM yr-]u 2 1 IT M MAL IU �ffi K.T� ID1No"IN=1 21.75 NO W-730 vT w-au H-Tffi 1 TANLINH!A 134 In Imu N EXISTNG VAULT N ENSnNG VAULT N EIASTNC VAIAT r vo MMapm War, RAFT I AI I a° �E' aA MIX ex— L ����XX r � Off' EMSRNG­0wm Off' ila'&(:r< lD�' to CA51NC 'smc ul A WLD - N S77-PI f TOe A 7 4 T-2 ♦ �,j'~- �MBr IAF h kaw rO�' ISA `4, aA r s � 'T37 WON r4' air �IL A:A 3• 2h` ,4 e `6E ' •::A P aRT.161' r 5 � .4 � �6161L[ ti e—Ar �o r �' to'1`' of O �Yje, .rr i un "wsn �vAul - 1� N - N X1311 C vAVI L+�N ER$NG O�r,Mnr ■RLl{LL 0�'_ ♦ iYBdAI! Nl a sai".vr..A... err L.wXMwa iRT1{j! ­Yq iJlral� e11//1IR brow- .� A� GALL 311 BEFORE YOV ONI how— I iE 1^ii�' wFOoxuwAcaiw3s wurorouavmXea APorrm r4'AA a f;g ,Ao RTO lA• I ai _ THINK 11NrosemAes pro mmiFamrm+a • y • • --... SAFETY 1101011BNrIS2dp1AOAA Fees AMr mTANGVPls o' RA; .� R�e3 • nrAutswoLUAw THE OREDcwum7lr r Xr r r e • FIRST! rwTrunar+ceNlmAOMIVSTRArroNeroT-vl-1Mn �v O�FlEWecI✓rM1:'v L.^OCrHi rHNs� O�W N O� �ro�-2� IIIIIvvOI.ILa IMry HICtrWvn r: �•�w C 1tlU3/Nk SS Oars F'H:O rRY^U 40. PGE CONSTRUCTION DRAWINGoM1 SDPMENG REVIEW: AS8U/LTBYDESIGNER' �XIA� % AS-BUILT VERIFICATION d NESC VIOLATIONS CORRECTED EXISTWG VAULT N EI531NNNNG VAULT ln�e acinnant aa'w ,nP.ex"rtls FIELD can err �♦ `( � Fore_ DAN: GF- DAN: Mrs a�+�'T.lmaool A�l00000]e]A +�-wxa33ee] K P I• S IPA I r w VHIACNETED CABLE REPLACEMENT-DURIWANOIMJ-4A75R �S' a ` KING CTTVSVMMERFIELD �LXAO �, �` •: SY /op ou a _ LWSS Sw BRENTWOOD 0..TNiAAD.O0.97224 AJA1� / �P(E A ww ,1"10 INET(12)SPANS R2 AL:(2)SPANS 1/0 AL:(I)W4 VAULT;(2)S77 VAULT tQ�' MWO�IIAR coven HDrw MIN: `o wASGAv4E WASHAraTON C21A11 C.L21110.C211U,C111Aa 11xAMeee 77 uNE arose OA.WNAr. W W sweOEfituAx NO.DE3HANN wllilAMS 50Y]15A'1m NEIDI BOOMER wAsoNnue oR]ro7P OPoRNAr00F7A�NAL FrEcrwc Ln.-Au worm RE]fAAEP I_______________________ __------- i y,� 1 I ♦CT cncn � rN, WWNNa0 cn o U, o cn o cn o m tn CL M �, Single Flagger Operation (Optional) O `� ! for Low Volumes EE (Optional ) � PREPARED ONE LANE , {►♦ i TO STOP ROAD („ C (ADT < 400) AHEAD O cn o >-0 �' O o O `0 0 �' F�AccER I BE ONE LANE 5 R�. PREPARED 11 Ae � c ;� I ROAD TO STOP AHEAD U1 W W ¢ i 1 mile O Ut O � '� c ♦- max. ♦� CD O O O i Dov o 0 0 o-u-7 �je •��-�f0.- 0 I ROAD C7 CCD ; 000 OO cn r WORK 0 U1 W cQ (D c �a e �A I AHEAD (/) 0 0 0 n ( (Q ; �ff i Protection Vehicle wlTMA(both Optional) --n eE 1f 11 See Chapter 4 I PREPARED Cn a. CD i ONE LANE TO STOP N N UI-0 C j i ROAC U1 — CD Ul N O U1 O W -1� AHEAD 000 O(n0 0 m (Optional) A B B C II ----------------------------------------------------------------------------------- I 1 mile max. 00 0 0 00 0 o°° �--=� 000 �r 0 0 o C B B A 7-I Buffer Protection Vehicle ROAD w/TMA(both Optional) WORK See Chapter 4 � AHEAD BE O ROAD E PREPARED Two Flagger Operation ai AHEAD TO STOP ER W � (Optional) O 0 2 www.invarion.com Stationary Lane Closure with Flagging Diagram 324 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT) with good sight distance as discussed below. 1 . Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3 — Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340 — Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4) should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the "Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. www.invarion.com Lane Closure at Intersection with Flagging Diagram 620 ROAD WORK -<,",AHEAD ONE LANE t (Optional) ROAD AHEAD B BE PREPARED TO STOP • B A (Optional) • 4n ONE LANE ROAD BE AHEAD ROAD 100 ft.Max. c PREPARED WORK TO STOP AHEAD A B B C 0 O ♦.. 0 0 O 0 0 0 100 ft.Max. O It A • B V if BE PREPARED TO STOP B (Optional) ONE LANE j ROAD AHEAD C ROAD WORK AHEAD H �i www.invarion.com Lane Closure at Intersection with Flagging Diagram 620 ROAD WORK AHEAD ONE LANE 1 t (Optional) ROAD ♦� AHEAD B BE PREPARED TO STOP • B A 100 ft.Max. I Buffer SR_► < 9 NuA 0 100 ft.Max. C B B A 0 ROAD BE WORK O PREPARED 100 ft.Max. AHEAD TO STOP • ONE LANE ROAD AHEAD (Optional) A ♦ • B BE PREPARED TO STOP B (Optional) ♦ ONE LANE j ROAD AHEAD C ROAD WORK AHEAD www.invarion.com Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1 . During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer —- Speed A B C Space ERRATA: 20 50 25 100 100 100 75 Supplement Table 30 100 35 350 350 350 125 Updated: February 12, 40 150 2015 45 180 By:ODOT Traffic-Raodway 50 500 500 500 210 section 55 250 Signs Spacing and Buffer Lengths (feet) Supplement Posted Spacing Between Signs Buffer to Speed A B G Space 60 285 65 700 700 700 325 70 365