PFI2018-00342 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
lir, COMMUNITY DEVELOPMENT Permit#: PF12018-00342
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 12/27/2018
Parcel: SEG2357
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: Adjacent to 9469 SW Brentwood PI. Replace and repair underground facilities. PGE job M2495683.
Owner: FEES
Description Date Amount
PFI Permit Fee 12/27/2018 $300.00
PHONE:
Contractor:
PHONE.-
FAX-
Applicant:
HONE:FAX:Applicant:
DESHAWN WILLIAMS
10800 SW AVERY ST
TUALATIN, OR 97062
PHONE: 503-718-6301
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature:
Issued By: .L
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12018-00342
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District) and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.) as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit. Brady Bullinger is the inspector assigned to this permit(503)
718-2611
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice
RECEIVED
City of Tigard DEC 13 2018
PUBLIC WORKS — ENGINEERING CITY OF TIGARD
`/FN
_1
g
Public FacilityImprovcmcrit (PFIYPermit
'TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way)
TYPE 1–Franchise Utility-W'orl:
Check one:V Utilities ❑Sidewalk/driveway approach ❑ Street improvements performed by NVVN, PGE
Detailed description: Replace and repair underground facilities and/or utility agency.
❑ TYPE 2—Sidewalk/Driveway,/Sewer
PGE Job M2495683 Work performed for the purpose of:
- Sidewalk installation or repair.
• Driveway approach installation
Property address/location(s): 9469 SW Brentwood PI and/or repair
Tigard, OR 97224 • Sanitary sewer lateral installation
and/or main line tap
Portland General Electric ❑ TYPE 3—Full scale Development
Applicant: Work performed with Land use
Address: 10800 SW Avery St approval which includes any of
City/state: Tualatin, OR Gip: 97062 the following:
Phone: 503-718-6301 Email: preregcoord@pgn.com - Subdivisions or Partitions
Contact name: Deshawn Williams Phone: 503-718-6301 • Street widening
- Mainline insrallation for Sariitall
Contractor: Potelco sewer, Storm sewer, Tigard water
76668 and/or Tigard Water Service Area
CCB#: Expiration:
Address: 14103 Stewart RD SUBMIT COMPLETED APPLICATION TO:
City/state: Sumner, WA Zip: 98390 City of Tigard
Phone: (503) 863-7067 Email: jmlenhart@potelco.net Planning/Engineering
13125 SW Hall Blvd.
Contact name: Joe Lenhart Phone: 503-991-1517 Tigard,OR 97223
Applications for"minor work in riglit-ref--way"
N/A only may be emailed to:
Engineer: rowpermitsCtigard-or.gov
Address:
FOR STAFF IJSE ONLY
City/state: Zip: II,,..,, ,,,,, ,�22
Phone: Email: Case No.: DFA%zolb r �3
Contact name: Application submittal fee(.007%of
Engineer's Estimate) $
Estimated value of work is required(if over$5,000):$ Additional fees: $ &0
(within the public right-of-way) Application accepted:
a—
Is work related to a LAND-USE DECISION? ❑ Yes V No By: K Q Date:
Application reviewed:
If so,please specify (Nff.,P,SDR., SUB,etc.) case #: !�
By: Date:
Is work related to a BUILDING PERMIT"? ❑ Yes ❑ No Applicant notified: L n
If so,please specify(BUILDING PERMII�case#: By: Date: 1�
I:\ENG\PermitApplications\pfi_application Rev.10/16/2017
City ofTigard - 13125 SW Hall Blvd. - Tigard,Oregon 97223 • www.tigard-or.gov - 503-718-2421 - Page I of4
APPLICANTS
NOTE: Person specified as `applicant" shall be designated"Permittee"and shall provide financial assurance for work,if
required by the cite pursuant to TMC 15.041.140.
With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the.
owner. The owner(s)must sign this application ui the space provided or submit a written authorization with this application. Franchised
Utilities arc not required to obtain the owners signature on the application
BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT:
• flue above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
propert
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
Steve Hursh 12/13/2018
,=applicant/authorized Agent's signature Print name Date
SIGNATURES of each owner of the subject property, if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard 13125 SW Hall Bhrd. • Tigard,Oregon 97223 • ww-,vtigard-or.gov 503-718-2421 Page 2 of
DEVELOPMENT ENGINEERING FEESFOR STAFF USE ONLY
Public Facility Improvement(PFI)Permit: DETAILED
SUBMITTAL
REQUIREMENTS
APPLICATION FEE
Part 1: Required submittal fee$300.00 (nnuni munn) FRANCHISE UTILITY AND SIDEWALK/
DRIVEWAY AND UTILITY
PERMIT FEE CONNECTIONS,ETC.
Part 2: All non-water system improvements (work in the right of way)
Engineer's estimate X 5%(less$300.00 minimum
submittal fee) Sketch
(including information below)
Engineer's estimate X 2%Plan Review
❑ Dimensions
WATER SYSTEM FEE ❑ Street Name
Part 3: All public water system improvements ❑ Site Address
Engineer's estimate X 12%
FULL SCALE DEVELOPMENT
PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements)
There will be no permit fee charged,or assurance required
for the following n-pes of work: Design Plans
• Sidewalk repair (less than 20 lineal feet) (C,sets,24x36 or 22x34)
• Relocate or replace mailbox ❑ Cover—Site,Vicinity,:kbbreviation,Legend
• Ditch cleanuig that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.)
• V'eep hole repair ❑ Street(Plan,Profile)
• Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile)
• Lawn sprinkler system installation or repair ❑ Water Quality Facilities
• Street tree pruning or planting ❑ Grading
• Planter strip landscape maintenance ❑ Landscaping/Tree Plan
• Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas,
Storm,Sanitary,Water,Signage,Street Lights,etc)
❑ Details
Note: A cash/bond assurance maybe ❑ Traffic Sight Distance
required per TMC 15.04.140. ❑ Signing and Striping
(e us tom er deposit) ❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm Nater Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design(if applicable)
❑ Water Department Approval
❑ Engineer's Construction Estimate
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard 13125 SW Hall Bhrd. • Tigard,Oregon 97223 • w•wwtigard-or.gov • 503-718-2421 • Page 3 of4
5
SAMPLE SKETCH:
Edge of Pavement
!
Ditch
Streetligfit ! 4 ■ ■ ■a■i■ ..�■i■ ��i■
T" 7M—17 fr54vweI-lne
. I N Existing House •
-=' I Existing
i I >1 Drive ay
01
ot
C� rti I f
•
.0 I 1f 1 2 I a ■
I Existing Shop
Powerpole
j o . o
— 7ieper-ty Line-
I I . �
. Fire Hydrant(FH)
I
I ! I
I Scale: 'I'=30'
� I I
I I
I I !
I I
I I
I ! �
MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable):
North arrow Property lines & dimension Slope or= property
Street &street name(s) Existing building, structures Utility & street-light poles
Proposed work Existing curb or edge Trees
Existing S/\X-'or of pavement Existing utility locations
D/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard 13125 SW'Hall Blvd. • Tigard,Oregon 97223 - wwwtigard-or.gov 503-718-2421 Page 4of4
1 VT-, 9
Wsw I
Invall:pN: I Nn ELBOW qr-MTD ueLE-Ru o nw
ELBOW la"JIRD CABLE'
12AL Namw ........fuefFrreelsaeser
Rem eSNt (2)ELBOW AOT•JKTD CABLE 02AL
EL.6CW gT•JKTD GBLF-pK CSO M7fNOTE'TRANSFORMER TRANSFERRED FROM CO TOW
CONWC/O✓tS
NN{ NOTE:TRANSFORMER TRANSFERRED FROM BE TO CO. < !W{AKffIN OR WL II VT-2111NEW VAULTI'. ��_����• LL•rtw{4K~�
! Fent + fm•1tar�iF I'
rs C6021e71 a,U Instal: • _....... wmasnwa+
rrsrua ossa
• Fon,[
u Mm{• • 9U3M89-VAULT CONC.56`4N112OD 11510Tr �n
Comm pt NN
N+ csD x1656 9039640-caNO DBL NON3uP VLr uD ssxN112 ns9n�l4 -....... -w.♦.r
L IOVT-lW(NEW VAULT): nm LATERAL TAP UNTO PS-3 PHASE -------- aro�+a rr1
•s
Fw Nge9 M >W SMF SM (6)ELBOW gT•JKTD CABLE-IJ➢AL
__... u•eRNRnreu
pm
$MOM DBLNON-MUPV2.ODUV{7T NN NN NN Sw +ua m Y,o ,aN EL80•V KR-JI(TDUBIE-�lAl
S TERAIL AP UMT BL NON HA VLT UD 56YN11T 571L6T/1M (8 DW T CAP
LATFJIAL TAP UNIT•4 PS3 PHASE SISe °f°0 fear.v u..eo.ee wsse,umw.,
(61El8CWgT-JKTDCABIE-1.OAL 77 tm ,{Y{
(31EL0CNICT-JKTDILIE-0741 I n C9Uf1A4ENT
3 OUST C..
i ,Nx
WL9V-Mi. Ltx VT-T]06: O susru..{n.c na .vww ri,r sn.na.
MaW In 3U
ELBOW KST-JKIII CABLF112AL 3U39054-DOVER.CULT,CONIC,STEEL GRATE VEMEO, / su nruPu.w-..rr
Nx Ramwe: Se'1ITO CABLE
-X2AL 01
ELBOW gT•JKiD CABLE RAL MFt r-
e01• (2)ELBOW qT-JKTO CABLE PNL I Remwe. - nr.rzw wawa rrw+
I . SW9654-COVER.VAULT.CONC,STEELCRATE.VENTED.
NOTE-.TRANSFORMER TRANSFERRED FROM AB TO C0 CMN rrs.wu.,u.wauro•m v wr,w4
38.1 I TD CA.ISOIhO6lJe)ELBOW qT-MTD CARIE-0241
NOTE'BORE UNDER FOC NOTE'.BORE?-2 I IYN 1
BEHINDCURB If NOTE:TRANSFORMER TRANSFERRED FROM CB TO BB ,Mu
Le VT-1
W. W°
131 ELBOW qT-JKTD CABLE-IJOAL I 4 ,w•°
ElBQV10T-JKTD CABLE-02AL N'
1M�ri
B ]]r1e
N
w{
Remo..
(3)ELSOW qT.JKTD GBLFRAL _ nf[o
••SdIA9YJ:RFEl1JW 1['•• ISp�f AOWINM NORM
Y Nff
w
� c6e�61 M ,MN Awn
wLsvra.: JK
w 5R"� , LUN InsW.
p, eN1H/6 O1. SKN »•N e[oo (2)ELSOWIOT• TDCABLE-F2AL Hse
Ramo.e:
ISONN 9TH ELBOW ICT-JKTD CABLE•RAL
�F
e •N
tAT 1 CNC!
IW ■Y N n wl[ leex
•2Np!ySol-
-----------------
'A 1834 nms
v,-[•,a �L•1M VLII •__.L'L I,l:;: _-NC,NM•_IIX•' B1.L-tir
•ON • - I vFlxf
ri♦
n NN I nm
C2 1.11D
Fw Flw Yle +1`Nn
t
Y
,Na vA
RE UNDER CUR 4416X1 Iw{v IN A5011N6 —.4-4481—VAULT).
r9i
...-VAULT CONC.56'66Y 42001lV.04
_ 3 W98N-LDNG.NON-SLIP VLT LID 5613618'
s•nxN v{elN •°N I LATERAL TAP UNTO POS-t Pw1SE
A100.145 ,•, + III s{so NOTE:BORE?-T 131 ELBOW QT-JKTD CABLE-
.w ,wl x ,•,Jj��t 1{e{ x44 Ym_ 11 BEWND CURB OUST LAP
we n 7 Nn
11111 ,wf I ,{
n» Fwr I ,sAe e66Xa1
g
L7 yr-1x2:
W11 ASO1p59�
NqN. Nm ___•s�; »„s {� arnx{
A-13g (2)ELBOW WT.JKTDCABLE-RAL i0•e° ,elN °1A 3 ■vim
}, Rem we: yY
_. ,wF 2 EIHOW KR-JKTD CABLE/UL � �°za ai ,N tms
iw KWSERIVDP I 1[m[ £ ,wN +
WL 2 VT.14925: 4 rM
9»tN: NOTE:BORE?-3' el4f
(2]ELBOWgT-JKTDCABLE-RAL BEHIND CURB >�•
eP Remwy ,[
pn Ym x 4 2 E CVVFQT-JKTDUBLE L
-RAL 'snF+* {Nt n n NOTE9
BXP1� I •,, ,tn1 W7
foe 1{0 Remora18PD-T1.MUST MVHTAN 5 FT.HORIZONTAL SEPARATION FROM
AN RS E1,KMJKTDCAM_Ei RAL WATER MAINS AND I FT.VERTICAL SEPARATION IBE—
FL e .
Fo�W
y VT-1x1'. INSpw 2.NNNTAw 1 FT.9EPARATION FROM CItt OF DGPRD
,ema ZB w 1{ Ingl: Jove ,t CATCH BASNIL
(-2)ELBOW AOT-JKM CABLE-RAL
QL 1 VT-14924: • ne ).USE)C N'SENDS,FOR OPEN BOTTOM VAULTS.
VV Npel'. fleF Ra!31 ELBOW KIT-JKTD CABLE-0241 ' Itw I WTCHI G.lN LLBONSIONS ASSUME
VIDE SUCK FOR
2a (2)ELBOW KIT-JKTp CABLE-RAL tm � I'F 51NTCHING.IPULL TENSIONS ASSUME 90'BEND7.
RemwF:
e,r[ 121 ELBOW qT-JCO CABLE- for , ebttl7 4.REPLACE ED U NODURA ROCS IF EXCESSIVE CORROSION i6
,[A[ eeM• DISCOVERED DURING CONSTPUCTgH.
eere NOTE:BORE?-3 ri ,NN
433<� AN19{N BEHIND CURB NM S.GROUND ABANDONED CABLE PER LC220]lr,
{see
C 15 56016 1•m , [°•° R , 8.CHECK CODRgMAIIDII OF STREET LIGHT FUSING.
,eiw ,•s,m n,o .;,�` ,YI{ nor L15 Pe1N1'
ri
SIMS Instal.
_ 411 ari1S ELBOW qT-JKTD CABLE trNI
Remwe:
,sore n er'T• D4 ELBOW qT-JKTD CABLE RAL
N
AFM
MRSNOTE;FUASFORMERTRANSFERRED
FM 8801614 FROM 80 TO AO
f„ "v2 •'° wm wst wA w,e wNte{1e
,ans y .NOTE.SPANREPLACEDIN s�4 IISII NOTE BORE?-3'
3� WO.4243212' vxxm n < Y BE NDC
,ef s� »ses
yye AN 2�9» »m _A76 Mall
3a tfN{ k n,o .ri
u1
Cs02DNe
ABC 75440 a ,smo p 1fm
w» Asn 2
ro, ,141 Iowa wN Mm pN flee wm wm w,o wm ,w,e
s-too,N BwwlSl
•,NN �. CX53016 . MFN
-,ylM � FFFtIw,naF
"'• x,wn aecwa
m OS C1d 10®T
m K se0y �° ,m tri ewT ,NN
Ass pY 82581Pp2� {•ll�wn vc�r ,sa>o Yw I ,[r[ � uvn B
B 5015510
sa WL]VT-14923'.
aw N{W
s11. sae ,eow SWB854-COVER.VAULT.CONC,STEEL GRATE.VENTED,56'X56')(6'.(5048308-LAI
BOW IGT-JKTD CABLE-02AL
w,. •Y ,•an • Nu)ELSU38X4-COVER,VAULT CONIC,STEEL GRATE.VENTED.SB'XSS'AE.(SN Ld)
C21-148 ,ww R ELBOW qT-JKTD OASLFRAL
efa nsX ,,,x +N••
C I-14A
61030p1T
INS
• e662ewnn �+•.-' 1M°• ' sw MARa u
pee
_ C-24 �sY B 50 2Aaa
f MMY y<41 FeFOen
e •OI00 tNN ,e,•o »n MN tw wm w,o nro ww ,t•» N„
F°°e pA Iw SW MARTNAdr w
IRAN 1{ne ,•rJ ,
0 N N 1N F4 wN1♦F. ,[m ssoa f4f Ars rwa 1
♦BSO
4_ � } 1-LINE DIAGRAM
SIT
raw
•�•• W wn
6W1 I it
sr
i-�'""¢
ANY DEVL1710N FROM!F6 DESIGN MVS!
ffAef'R_OF@_6Y THE PGE PROJECT MANAGER
l
w _
s-Tic Ry1+ •• C2 t.Ftp
I SAFETY '°`
_ 1I1aW I �ry FIRST �S,MSeFJAK
I r• 1 lIMl__FY
K ? '`•Q:,•,anY Nbti1C
AREA MRS,
W
LYnY L
+�� � � Iv,uJale n=e91 1er155t ,NDD5r64 94e1
fwyf-te eErEO r..,.REPLALEYFM.DYRHAII NCRTH J-I4mR
rtIXIWOCIr'I-STVJDOWOOO LO s0.i1
a eA' Few AJ9Y �E/e�f1Y 6PL TFMA0.0R.<>21•
F of 216+ G 1� • C2 F-1!A F. - \ WWIMOTON CMC CI1,ID C]11N 0211.8 YIINeN IVOFI
Myr N a Of3HA5WJW Nli1N]e HELI e00YE0.
LEGEND
14"M2495688
DURHAM NORTH K ----------- 10#2 EPR in 2"HDPE CONDUIT
* 30 110 EPR in 4"HDPE CONDUIT
VT-211 I
I
/'� VT-7358 t WM MAMTAM a R.HWrUpMtTIT�AL1L WARATKIN FROM
VT-7380 :MARe AIO T R. FROM MWIFIN IMOW
)
i AM 1 R.=PARAIgN Ory Oi 1gAl1O
CATCH MSM&
a USE 40'/W BEIM FOR OPOI BOTTOM VAULIS,
FDD OUT foo ASOW ORAoe TO FROM MACK
FOR 50TO 64(MILL 70000 ASSAXR 6END1
4.RVU09 ORO"RM IF EXCESSM NRROS�II IS
colarrolucraL
a NAND�BD CRAW PRELCfED20-].
VT-71 VT-7361 VT-155 II VT-7359 INBOOMM a OCCK TK ORBMAt10N OF STREET LMT FV73XC.
--�
I IP.9 �
I
)
I
VT-7364
VT-7362 \
n
n
I I
IP-2
VT-7363 ---
I
1
PD-7508
\�VT-248 ,
VT-14925
I
I
IP-1 I I
I
I
� I
� I
VT-14924
VT-14923
� ---------J
it
PRIMARY CABLE&CONDUIT TABLE TRENCH-FOOT TABLE
ASRAaRr AMRFW6 ASIITM'OANTNIN COMM
mr-gymIauTNM Im Am umm mom ruu ND GME Usorm LeN rrN 8 Orr um"Lewnl
1m) Rues ACIYAL Rev Oa1BN Acnes FX•.AI.I'o..rb. a")le IRI Oe4 AcnRU
es
PFAU To ((U IRI INFI IMI BSBT,w IN IN lom 140
VT. vt.A 1 I M x x Atu m `"•"'R' "' TRANSFORMER LOADING
Vr• W-34M 7 1 Au AS AS Uu AD M •f-3416
LON
w- yr-16 x I 3a IN 1Q nu em n VF.l m 1 ml MAIN sfM we JLV"ANVW
n-um W.>ts
vT-Mf PF?m 2 1 D D "a w W441 Tem L A D AD1lAIUO+bAwFl NO
vT-SRI TY 2 1 ll*m 33 31 UAL 1D vT-sem m 1 A D AD]MM117CM ) NO
id
yr-TIM vT-7m 7 1 BIT ]7 M RAL m n W-�7 Im
K-TIM vF71U 2 1 Im 25 25 AM 1T/ n YT m A 75 l0l] l NO
of-TIQ K-Ifs 7 1 ]! D ON ffi A 10 ASp1]ee]OOILewlwn NO
W.n W-105 . 1 ]e1 O] la Al ]x0 �'� R. 1 A Se ADr035 f NO
W-I14 W.lam 2 1 m 25 ]I UAL 2m vT-TIM M x 21 A D ADri7llO NO
vTJI 1R-T1U 2 1 ]s u iS UAL I" N'� IA D ASOMM(A0L1tlwINN NO
YT.T vPT1 x U71 yr-1f1 rr.rle r 1 10A U a UAl 12. Af Ks c D cDroMf No
vT-O vF.lu A 1 AD m m u m A vrTw C D CD 5]111 uc— NO
vFTIM yr-]u 2 1 IT M MAL IU �ffi K.T� ID1No"IN=1 21.75 NO
W-730 vT
w-au H-Tffi 1
TANLINH!A 134
In Imu
N EXISTNG VAULT N ENSnNG VAULT N EIASTNC VAIAT
r vo
MMapm
War,
RAFT I AI I a° �E' aA
MIX
ex—
L ����XX r �
Off' EMSRNG0wm Off' ila'&(:r< lD�'
to
CA51NC 'smc ul A WLD - N S77-PI f TOe A 7 4 T-2
♦ �,j'~- �MBr IAF h kaw
rO�'
ISA `4, aA r s � 'T37
WON
r4' air �IL A:A 3• 2h` ,4 e `6E
' •::A P aRT.161' r 5 � .4 � �6161L[ ti e—Ar �o r
�' to'1`' of O �Yje,
.rr i un
"wsn
�vAul - 1� N - N X1311 C vAVI L+�N ER$NG O�r,Mnr
■RLl{LL 0�'_ ♦ iYBdAI! Nl a sai".vr..A...
err L.wXMwa iRT1{j! Yq
iJlral� e11//1IR brow- .� A� GALL 311 BEFORE YOV ONI
how— I iE 1^ii�' wFOoxuwAcaiw3s wurorouavmXea APorrm
r4'AA a f;g ,Ao RTO lA• I ai _ THINK 11NrosemAes pro mmiFamrm+a
• y • • --... SAFETY 1101011BNrIS2dp1AOAA Fees AMr mTANGVPls o'
RA; .� R�e3 • nrAutswoLUAw THE OREDcwum7lr
r Xr r r e • FIRST! rwTrunar+ceNlmAOMIVSTRArroNeroT-vl-1Mn
�v O�FlEWecI✓rM1:'v L.^OCrHi rHNs�
O�W
N
O� �ro�-2� IIIIIvvOI.ILa IMry HICtrWvn r: �•�w
C
1tlU3/Nk SS Oars F'H:O rRY^U 40.
PGE CONSTRUCTION DRAWINGoM1
SDPMENG REVIEW: AS8U/LTBYDESIGNER'
�XIA� % AS-BUILT VERIFICATION d NESC VIOLATIONS CORRECTED
EXISTWG VAULT N EI531NNNNG VAULT ln�e acinnant aa'w ,nP.ex"rtls FIELD can err
�♦ `( � Fore_ DAN:
GF- DAN:
Mrs a�+�'T.lmaool A�l00000]e]A +�-wxa33ee]
K P I• S IPA I r w VHIACNETED CABLE REPLACEMENT-DURIWANOIMJ-4A75R
�S' a ` KING CTTVSVMMERFIELD �LXAO
�, �` •: SY
/op
ou a
_ LWSS Sw BRENTWOOD 0..TNiAAD.O0.97224
AJA1� /
�P(E A ww
,1"10 INET(12)SPANS R2 AL:(2)SPANS 1/0 AL:(I)W4 VAULT;(2)S77 VAULT
tQ�' MWO�IIAR coven HDrw MIN:
`o wASGAv4E WASHAraTON C21A11 C.L21110.C211U,C111Aa 11xAMeee 77
uNE arose OA.WNAr.
W W sweOEfituAx NO.DE3HANN wllilAMS 50Y]15A'1m NEIDI BOOMER
wAsoNnue oR]ro7P OPoRNAr00F7A�NAL FrEcrwc Ln.-Au worm RE]fAAEP
I_______________________ __------- i
y,� 1 I ♦CT
cncn � rN, WWNNa0
cn o U, o cn o cn o m
tn
CL M �, Single Flagger Operation (Optional)
O
`� ! for Low Volumes EE (Optional
) �
PREPARED ONE LANE , {►♦
i TO STOP ROAD
(„ C (ADT < 400) AHEAD
O cn o >-0 �'
O o O `0
0 �' F�AccER I BE ONE LANE
5 R�. PREPARED
11 Ae � c ;� I ROAD
TO STOP AHEAD
U1 W W ¢ i 1 mile
O Ut O � '� c ♦- max. ♦� CD
O O O i Dov o 0 0 o-u-7
�je •��-�f0.-
0
I ROAD C7
CCD ; 000 OO
cn r WORK 0
U1 W cQ (D c �a e �A I
AHEAD (/)
0 0 0 n ( (Q ; �ff
i Protection Vehicle
wlTMA(both Optional)
--n eE 1f 11 See Chapter 4
I PREPARED
Cn a. CD i ONE LANE TO STOP
N N UI-0 C j i ROAC
U1 — CD Ul N O U1 O W -1� AHEAD
000 O(n0 0 m
(Optional) A B B C
II
----------------------------------------------------------------------------------- I
1 mile
max.
00 0 0 00 0
o°° �--=� 000 �r
0 0
o
C B B A
7-I Buffer
Protection Vehicle
ROAD w/TMA(both Optional)
WORK See Chapter 4 �
AHEAD
BE
O ROAD E PREPARED Two Flagger Operation ai
AHEAD TO STOP ER
W �
(Optional) O
0
2
www.invarion.com
Stationary Lane Closure with Flagging Diagram 324
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT) with good
sight distance as discussed below.
1 . Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3 — Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340 — Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the "Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
www.invarion.com
Lane Closure at Intersection with Flagging Diagram 620
ROAD
WORK
-<,",AHEAD
ONE LANE t
(Optional) ROAD
AHEAD
B
BE
PREPARED
TO STOP
• B
A (Optional)
•
4n ONE LANE
ROAD
BE AHEAD ROAD
100 ft.Max. c PREPARED WORK
TO STOP AHEAD
A B B C
0
O ♦..
0
0
O
0
0
0
100 ft.Max.
O
It
A •
B
V if BE
PREPARED
TO STOP
B (Optional)
ONE LANE
j ROAD
AHEAD
C
ROAD
WORK
AHEAD
H
�i
www.invarion.com
Lane Closure at Intersection with Flagging Diagram 620
ROAD
WORK
AHEAD
ONE LANE 1 t
(Optional) ROAD ♦�
AHEAD
B
BE
PREPARED
TO STOP
• B
A
100 ft.Max.
I
Buffer
SR_► < 9
NuA 0
100 ft.Max.
C B B A
0
ROAD BE
WORK O
PREPARED 100 ft.Max.
AHEAD TO STOP •
ONE LANE
ROAD
AHEAD
(Optional) A
♦ •
B
BE
PREPARED
TO STOP
B (Optional)
♦ ONE LANE
j ROAD
AHEAD
C
ROAD
WORK
AHEAD
www.invarion.com
Lane Closure at Intersection with Flagging Diagram 620
Diagram 620 covers work within an intersection when normal traffic control
must be interrupted. Work vehicles may or may not be in the work space.
1 . During flagging, traffic signals shall be turned off. Contact the road
jurisdiction for approval and assistance (see Chapter 3).
2. For multi-lane facilities, traffic approaching the intersection shall be
reduced to a single lane on each approach. See Chapter 3 for
information on flagging through intersections.
3. There should be one flagger for each approach. One flagger may
control two adjacent approaches if sight distance, low volumes on side
roads, and flagger position allows for safe operation and clear direction
to motorists. For low traffic volume intersections (fewer than 400
entering vehicles per day), one flagger may be used.
4. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues may be expected.
Sign Spacing and Buffer Lengths (feet)
Posted Spacing Between Signs Buffer —-
Speed A B C Space ERRATA:
20 50
25 100 100 100 75 Supplement Table
30 100
35 350 350 350 125 Updated: February 12,
40 150 2015
45 180 By:ODOT Traffic-Raodway
50 500 500 500 210 section
55 250
Signs Spacing and Buffer Lengths (feet) Supplement
Posted Spacing Between Signs Buffer to
Speed A B G Space
60 285
65 700 700 700 325
70 365