Loading...
Report (11) , ,. -??,,,,-,?-- \,s- cc.-3.---A-v). r 1 S ` fig P; ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS Itt ';:- NO. 111) <f DATE: April 3, 2017 - ED ® PROJECT TITLE: Interstate Roofing— Permit # BUP2016-002701 ' y� 15065 SW 74th Ave, �/ Tigard, OR APR 4 2017 PROJECT NUMBER: 130 184.01 CITY��TIGARD Chris Walker TO: City of Tigard—Attn: Dan Nelson, SR. Plan RePPJDING DIVISION 15895 SW 72ND AVE Yorke & Curtis General Contractors SUITE 200 PORTLAND,OR 97224 The following instructions, clarifications, or revisions are to be incorporated into the drawings and specifications. Only items noted are revised, all other items are to remain unchanged. PHONE:503,226.1285 FAX:503.226.1670 Revisions noted update the approved building permit drawings. Revisions are clouded and noted INFO©CIDAINC.COM with a Delta 6. Revisions noted below are briefly summarized by individual sheets. This issue WINW.CIDAINC.COM includes the Architectural (A series), Tenant Improvement(T series) and Structural (S series). ARCHITECTURAL SET CS I —Cover Sheet: - Building code summary updated to account for realignment of 3-hour wall. - Drawing index updated for this release. FLS sheets shifted in the drawing set and index to be part of General section instead of middle of A-sheets. - Deferred submittal list updated. FLS I — Fire Life Safety—Code Summary: - Area calculations updated for 3-hour wall alignment and correction of W=30', instead of 32.5' previously noted, in frontage calculation. d FLS 2— Fire Life Safety—Plan: - Revision to plan to account for realignment of 3-hour wall. - Added all interior rooms to the occupant load table. A0.1 —Architectural Site Plan: - Wheelstops previously added to address planning comments (Delta 5) - Vegetated corridor fence previously added to address CWS comments (Delta 5) - Gate between existing building location and new building revised to I 6'total width swing gate. A0.2—Site Details: - Wheelstop detail previously added to address planning comments (Delta 5) - Bollard dimensions adjusted to clarify size conflict in set and dimensional placement. A1.1 — First Floor Plan: - Revision to plan to account for realignment of 3-hour wall. - Entry modified layout. - Interior wall at Hallway I I 1 adjusted to concrete tilt panel in lieu of CMU. ARCHITECTURE A1.2—Second Floor Plan: ENGINEERING - Revision to plan to account for realignment of 3-hour wall. t PLANNING - Entry modified layout. INTERIORS r A I.3 — Roof Plan: - Entry layout modified for roof placement at covered entry. ' I A2.I — Elevations: - Entry elevation updated for concrete panel at 2"d floor level for entry roof attachment. ® - Glazed portions of overhead doors removed. - Storefront elevations at Type E sill increased from 0"to 34" above finish floor. - 2" reveal called out. - Reveal detail added - Window elevation tags corrected to correlate to A6.2 window type elevations. 15895 SW 72ND AVE - Alternate concrete panel finish detail (3/A2.1) removed from project. SUITE 200 PORTLAND,OR 97224 A2.2— Elevations: Glazed portions of overhead doors removed. PHONE:503,226.1285 _ Storefront elevations at Type E sill increased from 0"to 34" above finish floor. FAX:503.226.1670 - 2" reveal called out. INFO@CIDAINC.COM - Window elevation tags corrected to correlate to A6.2 window type elevations. WWW.CIDAINC.COM A3.1— Building Section: - Window sill height updated to 34" AFF - Entry modification for roof to concrete panel layout. A4.1 —Wall Sections: - Added compensating head information at full height 3-hour rated wall, A4.2—Wall Sections: - Entry wall section modified for roof placement at covered entry. Added Grid Designation of 3.9 at entry panel. A5.I —Door Schedule & Details: - Entry door 100-A size adjusted to a single 3' storefront door in lieu of pair with 6'total s. width. - Added missing door 201-A at upper level to rated stair way. A6.I — Roof Details: - No modifications A6.2—Window Types and Exterior Details: - Window type A noted to have single entry door in lieu of pair storefront door. - Window type H removed from project - Window type C updated layout - Window type E updated for 34" sill height. - Added sill callout details. - New entry canopy roof structure added as details 9 through 11. A6.3 — Exterior Details: - Entry canopy modifications to panel and roof resulted in no longer needing these details. ARCHITECTURE A8.1 —Stair Plan and Details: E EERI - Stair#2 (I-hour rated back stair) revised for wood framed stringers, riser, and treads. PLANNING A8.2—Stair Plan and Details: INTERIORS , ... pm - Stair #I (lobby stair) revised for concrete pan filled treads in lieu of reclaimed wood 14 treads. J TENANT IMPROVEMENT SET - T I.1 — Floor Plans and Interior Wall Types: iii - Alignment of 3-hour wall previously noted updated along with updated room layouts associated with straightening of this wall. - ti T I.2— Finish Plans & Schedules: - 3-hour wall alignment 15895 SW 72ND AVE - Additional finish keynotes added for vending machines and whiteboard. SUITE 200 - Ceiling heights in schedule revised to 9' in lieu of 9'-6"typical. PORTLAND,OR 97224 T2.I — Reflected Ceiling and Details: PHONE:503.226.1285 _ Update to ceiling layouts at rooms impacted by 3-hour wall realignment. FAX:503.226.1670 INFO@CIDAINC.COM T3.I — Interior Elevations: WWW.CIDAINC,COM - Upper cabinet heights modified. - Training room elevation updated for revised plan layout. T3.2— Interior Elevations and Details: - Upper cabinet heights modified. STRUCTURAL SET SO.I —Structural Notes: - No changes - S1.1 — Foundation Plan: - Updates for entry layout modification S I.2—Second Floor Framing Plan: - Entry layout modification to canopy roof. - Upper landing at Stair#2 to include framing callouts. S I.3 —Roof Framing: - Entry layout modification to canopy roof. - Removal of skylight above office. S I.4— Roof Framing: - Entry layout modification to canopy roof. - Removal of skylight above office. S2.I —Panel Elevations: - Sill height adjustment for new window Type E sill elevation of 34" AFF - Entry panel modifications to add panel 9B, update 9A and 9C for new entry layout. S3.I — Foundation Details: - No changes ARCHITECTURE ENtINEERIN S3.2— Foundation Details - New detail 6/S3.2 I PLANNING INTERIOR r pm 54.1 — Panel Details: - New detail 8/S4.I '' S5.I —Mezzanine Framing Details: . - Plate size update on 8/S5.I S5.2— Mezzanine Framing Details: 1111 - Plate size update on I and 5/S5.2 S6.I —Roof Framing Details - Correction to kicker on detail 5/S6.I 15895 SW 72ND AVE - Correction on details 12/S6.I SUITE 200 PORTLAND,OR 97224 S6.2— Roof Framing Details: Details associated with revisions to entry roof framing updated or removed. PHONE:503.226.1285 FAX:503.226.1670 S7.1 —Stair Plans and Details: INFO@CIDAINC.COM - Stair framing updates related to change in materials noted in Architectural set above. WWW.CIDAINC.COM S7.2— Ds: - Stair Stair framPlinansg updatesandetail related to change in materials noted in Architectural set above. End ASI No. I ARCHITECTURE ENGINEERING PLANNING INTERIORS