Loading...
Permit (14) CITY OF TIGARD BUILDING PERMIT IIII iii '" COMMUNITY DEVELOPMENT ,, 3el. q , i Permit#: BUP2018 00341 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 D Date Issued: 01/07/2019 TIGARD Parcel: 2S112AD00700 Jurisdiction: Tigard Site address: 14830 SW 72ND AVE Project: Pioneer Waterproofing Subdivision: None Lot: None Project Description: Converting portion of existing warehouse into offices and storage,and adding exterior windows on the north and west walls of the existing building. Contractor: MASONRY RESTORATION CO OF OREGON&PIONE Owner: CRAWFISH LLC 14830 SW 72ND AVE 14830 SW 72ND AVE TIGARD, OR 97224 TIGARD,OR 97224 PHONE: 503-232-9020 PHONE: 503-232-9020 FAX: Specifics: FEES Description Date Amount Type of Use: COM Permit Fee-Additions,Alterations, 01/07/2019 $1,045.71 Class of Work: ALT Type of Const: Demolition Occupancy Grp: Occupancy Load: 12 12%State Surcharge-Building 01/07/2019 $125.49 Dwelling Units: 0 Plan Review 12/06/2018 $488.83 Stories: 0 Height: 0 ft Wash Co Trans Dev Tax 01/07/2019 $3,328.00 Bedrooms: 0 Bathrooms: 0 Tigard Trans SDC Improvement 01/07/2019 $1,439.00 Value: $91,342 Tigard Trans SDC Reimbursement 01/07/2019 $83.00 Parks SDC Improvement 01/07/2019 $1,403.00 Parks SDC Reimbursement 01/07/2019 $255.00 Floor Areas: DC Provision Review,COM TI-Ping 01/07/2019 $243.00 Total Area: 697 Plan Review-Fire Life Safety 01/07/2019 $418.28 Accessory Strutt: 0 Info Process/Archiving-Lg$2.00(over 01/07/2019 $34.00 11x17) Basement: 0 Info Process/Archiving-Sm$0.50(up to 01/07/2019 $15.00 Carport: 0 11x17) Covered Porch: 0 Plan Review 01/07/2019 $190.88 Deck: 0 Tig-Tual School CET-Non Residential 01/07/2019 $453.05 Garage: 0 Mezzanine: 0 Total $9,522.24 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: -__Pa to ttee Signature: l I .639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each Inspection. CITY OF TIGARD BUILDING PERMIT Permit#: BUP2018-00341 .� COMMUNITY DEVELOPMENT T(GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/07/2019 Parcel: 2S112AD00700 Jurisdiction: Tigard Site address: 14830 SW 72ND AVE Project: Pioneer Waterproofing Subdivision: None Lot: None Project Description: Converting portion of existing warehouse into offices and storage,and adding exterior windows on the north and west walls of the existing building. Contractor: Owner: CRAWFISH LLC 14830 SW 72ND AVE TIGARD, OR 97224 PHONE: PHONE: 503-232-9020 FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Permit Fee-Additions,Alterations, 01/07/2019 $1,045.71 Demolition Occupancy Grp: Occupancy Load: 12 12%State Surcharge-Building 01/07/2019 $125.49 Dwelling Units: 0 Plan Review 12/06/2018 $488.83 Stories: 0 Height: 0 ft Wash Co Trans Dev Tax 01/07/2019 $3,328.00 Bedrooms: 0 Bathrooms: 0 Tigard Trans SDC Improvement 01/07/2019 $1,439.00 Value: $91,342 Tigard Trans SDC Reimbursement 01/07/2019 $83.00 Parks SDC Improvement 01/07/2019 $1,403.00 Parks SDC Reimbursement 01/07/2019 $255.00 Floor Areas: DC Provision Review,COM TI-Ping 01/07/2019 $243.00 Total Area: 697 Plan Review-Fire Life Safety 01/07/2019 $418.28 Accessory Strutt: 0 Info Process/Archiving-Lg$2.00(over 01/07/2019 $34.00 11x17) Basement: 0 Info Process/Archiving-Sm$0.50(up to 01/07/2019 $15.00 Carport: 0 11x17) Covered Porch: 0 Plan Review 01/07/2019 $190.88 Deck: 0 Tig-Tual School CET-Non Residential 01/07/2019 $453.05 Garage: 0 Mezzanine: 0 Total $9,522.24 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more t days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set fort in O R 952-001-0010 through OAR 952-001-0090. You may obtain rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.731. Issued By: - ' mittee Signature: . .639.4175 by 7:00 a.m.for the next available Inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. BU ilclin2 Permit Application Commercial " ," ' FOR OFFICE USE ONLY City of Tigard ``-fi�r DateBReceivy /A/ cd /i/,1 Per '/ 6l() `003`// . 13125 SW Hall Blvd.,Tigard,OR 9722 E c 2t1 1B Plan Review ■ Phone: 503.718.2439 Fax: 503.598.1960 F Date/By: f Z•.p1 C' /C Other Permit: Inspection Line: 503.639.4175 a y, Date Ready/By: Juris: Ea See Page 2 for I G A R D 3 Notified/Mtthod: , Supplemental Information Internet: www.tigard-or.gov Ul / k Li/_.. a/rr -. // TY GP WORK . 1 DAt 1 � 44M L AWI Io ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the (:'FEGORY- �r� S"1rIIttIr work indicated on this applic on. Valuation: 9 i ❑1-and 2-family dwelling ®Commercial/industrial H _ / i CIAccessory building ❑Multi-family Number of bedrooms: ❑Master builder 111 Other: Number of bathrooms: JOB $ 9,CAIXTotal number of floors: Job site address:14830 SW 72nd Avenue New dwelling area: square feet City/State/ZIP:Tigard,Oregon 97224 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Pioneer Waterproofing Remodel Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet ,..., , A i s � .0,;:- CO,,., :'- Subdivision: I Lot no.:700 Permit fees*are based on the value of the work performed. Tax map/parcel no.:2S112AD00700 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the ' � moo* . work•indicated on this application. c Valuation: $52,499 , l 1,,,i t welfiit c� exterior windows on the north&west walls of the existing building. Existing building area: 20600 square feet iCe‘ C:d�f��L-72-T/A/6- €77eA e7,4-- 1- 5 /iv-7e e)- 25,e. r f / New'6ul d ng area: -2A6�9r sq are£eet ! p , 3 ,1 •,S� Number of stories: 1 Name:Mike Crawford Type of construction: IIIB Warehouse Address:14830 SW 72""Avenue Occupancy groups: City/State/ZIP:Tigard,Oregon 97224 Existing: S-2 Warehouse Phone:(503)2329020 Fax:( ) New: S-2 Warehouse II!N'ACIIERSC I � �� Tb 6 AP , £ v Business name:Soderstrom Architects Structural plan review fee(or deposit): $488.83 Contact name:Dan Van Calcar FLS plan review fee(if applicable): Address:1200 NW Naito Parkway,Suite 410 Total fees due upon application: $488.83 City/State/ZIP:Portland,Oregon 97209 Amount received: Phone:(503)2285617 Fax::( ) P orovoLTAI ,SOLaARt.,P 1�L ;1 �* E-mail:danv@sdra.com Commercial and residential prescriptive installation of „.A . ,V 4t W. _ff4 ":fl s7 ,4! .,. � ,tk i `;'4 _„rm,:c;_�., roof-top mounted PhotoVoltaic Solar Panel System. Business name: � �36_ ��� Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: t ti 3d c 7 2," 2 AV Solar Installation Specialty Code checklist. City/State/ZIP -7,�O 2 /J Permit fee(includes plan review $180.00 Phone:(Vq,) Z32- -2.0 Fax:($7S ) 237 f/741 3 and administrative fees): State surcharge(12%of permit fee): $21.60 CCB lic.: 417 .. ///aza, 19 Total fee due upon application: $201.60 Authorized SignaThis permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. �"�, * Fee methodology set by Tri-County Building Industry Print name: , i41Date: �2� r e Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) • 11111 N Building Division e Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 Building Division Plan Submittal Requirements T G A R D Commercial&Multi-Family-New,Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ►/ map&tax lot# ® project name ® site address ❑ suite number ® zoning ® applicant name ® phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. • I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 Building Division Plan Submittal Requirement Matrix T G A R D Commercial&Multi-Family-New,Additions or Alterations Type of Subltxilttai cludes new,additions and alterations) Reuxd at 5ubri�. Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing(building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Perniits\BUP-COM PermitApp.doc 03/03/2011 City of Tigard II " COMMUNITY DEVELOPMENT DEPARTMENT ■ TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: 6ue020cg-- sci/ Site Address: /27l O ,c2a) 21 J e_ Suite/Bldg#: Project Name: P`D 1 --- 1 ,k r4 (Name of commercial business occupKying the spacvacant,enter Spec Space.) Planning Review /11 / / Proposal: Ca �7L ( 7Z /�J�--ee/ZOL/8-e_ �r'-Tf '�1 Od /1/k) -e)f 6>-- A Ai dou)S 14 Verify site address/suite# exists and active in permit system 7Verify taiver Terrace Neighborhood: ❑ Yes ALJ No and Use Case#: M nth.2 0/8 — 6004— Pla atch Approved Land Use: Site Plan Vrdscape Plan CIOther: 11krban Forestry Plan levation Plan Building Height: Maximum Height Actual Height Exkhe ditions Met: ❑ Prior to Submittal CI Prior to Permit Issuanc/ Of Business Licen Exists: iQ Yes ❑ No,applicant notified to obtain business license la\Aciiublic Facilities Improvement(PFI) Permit: Required: ❑ Yes,applicant was notified No pp Applied For: 111Yes ❑ No,stop intake Notes: Approved by Planning: — \, /;, Date: ,/(e //0 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: /.. /ce/ir Site Plans: # Building Plans: # Building Permit#: OF 'nter building permit#above. Workflow Routing: ■V lanning Illingineering Permit Coordinator 'Building Workflow Sign-off: G Sign-off for Pl5nning(include notes from planning review) Route Application Documents: ► Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: I By Permit Technician: �,�, ' •���4�47� /j Date: /A /(.,,-Al— / I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_060116.docx E ineering Review , gz,Slope at building pad: ,7' 0/0 FI Permit#: Ai/4 '/ ,4 E "Met"prior to issuance of building permit ,t/asements (encroachments)per engine ring conditions of approval and plat (not typical on SDR/CUP) , i 1/4- 2'Water Quality/Quantity Facility: A/ A Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: 9,,,,-Approved by Engineering: �v Date: 1.2/12118' Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: DC Fees Entered: Wash Co Trans Dev Tax: LM' Yes ❑ N/A Tigard Trans SDC: I ❑ N/A Parks SDC: YYes ❑ N/A to Issue Permit Approved by Permit Coordinator: Date: / 1 g I:\Building\Forms\BldgPermitRvw_COM_W ithlandUse_070915.docx