Permit (14) CITY OF TIGARD BUILDING PERMIT
IIII iii
'" COMMUNITY DEVELOPMENT ,, 3el. q , i Permit#: BUP2018 00341
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 D Date Issued: 01/07/2019
TIGARD Parcel: 2S112AD00700
Jurisdiction: Tigard
Site address: 14830 SW 72ND AVE
Project: Pioneer Waterproofing Subdivision: None Lot: None
Project Description: Converting portion of existing warehouse into offices and storage,and adding exterior windows on the north and
west walls of the existing building.
Contractor: MASONRY RESTORATION CO OF OREGON&PIONE Owner: CRAWFISH LLC
14830 SW 72ND AVE 14830 SW 72ND AVE
TIGARD, OR 97224 TIGARD,OR 97224
PHONE: 503-232-9020
PHONE: 503-232-9020
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM Permit Fee-Additions,Alterations, 01/07/2019 $1,045.71
Class of Work: ALT Type of Const: Demolition
Occupancy Grp: Occupancy Load: 12 12%State Surcharge-Building 01/07/2019 $125.49
Dwelling Units: 0 Plan Review 12/06/2018 $488.83
Stories: 0 Height: 0 ft Wash Co Trans Dev Tax 01/07/2019 $3,328.00
Bedrooms: 0 Bathrooms: 0 Tigard Trans SDC Improvement 01/07/2019 $1,439.00
Value: $91,342 Tigard Trans SDC Reimbursement 01/07/2019 $83.00
Parks SDC Improvement 01/07/2019 $1,403.00
Parks SDC Reimbursement 01/07/2019 $255.00
Floor Areas: DC Provision Review,COM TI-Ping 01/07/2019 $243.00
Total Area: 697 Plan Review-Fire Life Safety 01/07/2019 $418.28
Accessory Strutt: 0 Info Process/Archiving-Lg$2.00(over 01/07/2019 $34.00
11x17)
Basement: 0 Info Process/Archiving-Sm$0.50(up to 01/07/2019 $15.00
Carport: 0 11x17)
Covered Porch: 0 Plan Review 01/07/2019 $190.88
Deck: 0 Tig-Tual School CET-Non Residential 01/07/2019 $453.05
Garage: 0
Mezzanine: 0
Total $9,522.24
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: -__Pa to ttee Signature: l
I .639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each Inspection.
CITY OF TIGARD BUILDING PERMIT
Permit#: BUP2018-00341
.� COMMUNITY DEVELOPMENT
T(GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/07/2019
Parcel: 2S112AD00700
Jurisdiction: Tigard
Site address: 14830 SW 72ND AVE
Project: Pioneer Waterproofing Subdivision: None Lot: None
Project Description: Converting portion of existing warehouse into offices and storage,and adding exterior windows on the north and
west walls of the existing building.
Contractor: Owner: CRAWFISH LLC
14830 SW 72ND AVE
TIGARD, OR 97224
PHONE: PHONE: 503-232-9020
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Permit Fee-Additions,Alterations, 01/07/2019 $1,045.71
Demolition
Occupancy Grp: Occupancy Load: 12 12%State Surcharge-Building 01/07/2019 $125.49
Dwelling Units: 0 Plan Review 12/06/2018 $488.83
Stories: 0 Height: 0 ft Wash Co Trans Dev Tax 01/07/2019 $3,328.00
Bedrooms: 0 Bathrooms: 0 Tigard Trans SDC Improvement 01/07/2019 $1,439.00
Value: $91,342 Tigard Trans SDC Reimbursement 01/07/2019 $83.00
Parks SDC Improvement 01/07/2019 $1,403.00
Parks SDC Reimbursement 01/07/2019 $255.00
Floor Areas: DC Provision Review,COM TI-Ping 01/07/2019 $243.00
Total Area: 697 Plan Review-Fire Life Safety 01/07/2019 $418.28
Accessory Strutt: 0 Info Process/Archiving-Lg$2.00(over 01/07/2019 $34.00
11x17)
Basement: 0 Info Process/Archiving-Sm$0.50(up to 01/07/2019 $15.00
Carport: 0 11x17)
Covered Porch: 0 Plan Review 01/07/2019 $190.88
Deck: 0 Tig-Tual School CET-Non Residential 01/07/2019 $453.05
Garage: 0
Mezzanine: 0
Total $9,522.24
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more t
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set fort in O R
952-001-0010 through OAR 952-001-0090. You may obtain rules
or direct questions to OUNC by calling 503.232.1987 or 1.800.332.731.
Issued By: - ' mittee Signature:
. .639.4175 by 7:00 a.m.for the next available Inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
BU ilclin2 Permit Application
Commercial " ," ' FOR OFFICE USE ONLY
City of Tigard ``-fi�r DateBReceivy /A/ cd /i/,1 Per '/ 6l() `003`// .
13125 SW Hall Blvd.,Tigard,OR 9722 E c 2t1 1B Plan Review
■ Phone: 503.718.2439 Fax: 503.598.1960 F Date/By: f Z•.p1 C' /C Other Permit:
Inspection Line: 503.639.4175 a y, Date Ready/By: Juris: Ea See Page 2 for
I G A R D 3 Notified/Mtthod: , Supplemental Information
Internet: www.tigard-or.gov Ul / k
Li/_.. a/rr -. //
TY GP WORK . 1 DAt 1 � 44M L AWI Io
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
(:'FEGORY- �r� S"1rIIttIr work indicated on this applic on.
Valuation: 9 i
❑1-and 2-family dwelling ®Commercial/industrial H _ / i
CIAccessory building ❑Multi-family Number of bedrooms:
❑Master builder 111 Other: Number of bathrooms:
JOB $ 9,CAIXTotal number of floors:
Job site address:14830 SW 72nd Avenue New dwelling area: square feet
City/State/ZIP:Tigard,Oregon 97224 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Pioneer Waterproofing Remodel Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
,..., , A i s � .0,;:- CO,,., :'-
Subdivision: I Lot no.:700 Permit fees*are based on the value of the work performed.
Tax map/parcel no.:2S112AD00700 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
' � moo* . work•indicated on this application. c
Valuation: $52,499 , l 1,,,i t
welfiit
c�
exterior windows on the north&west walls of the existing building. Existing building area: 20600 square feet
iCe‘
C:d�f��L-72-T/A/6- €77eA e7,4-- 1- 5 /iv-7e e)- 25,e. r f / New'6ul d ng area: -2A6�9r sq are£eet
! p , 3 ,1 •,S� Number of stories: 1
Name:Mike Crawford Type of construction: IIIB Warehouse
Address:14830 SW 72""Avenue Occupancy groups:
City/State/ZIP:Tigard,Oregon 97224 Existing: S-2 Warehouse
Phone:(503)2329020 Fax:( ) New: S-2 Warehouse
II!N'ACIIERSC I � �� Tb 6 AP , £ v
Business name:Soderstrom Architects
Structural plan review fee(or deposit): $488.83
Contact name:Dan Van Calcar
FLS plan review fee(if applicable):
Address:1200 NW Naito Parkway,Suite 410
Total fees due upon application: $488.83
City/State/ZIP:Portland,Oregon 97209
Amount received:
Phone:(503)2285617 Fax::( )
P orovoLTAI ,SOLaARt.,P 1�L ;1 �*
E-mail:danv@sdra.com
Commercial and residential prescriptive installation of
„.A . ,V 4t W. _ff4 ":fl s7 ,4! .,. � ,tk i `;'4 _„rm,:c;_�., roof-top mounted PhotoVoltaic Solar Panel System.
Business name: � �36_ ��� Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon
Address: t ti 3d c 7 2," 2 AV Solar Installation Specialty Code checklist.
City/State/ZIP -7,�O 2 /J Permit fee(includes plan review $180.00
Phone:(Vq,) Z32- -2.0 Fax:($7S ) 237 f/741 3 and administrative fees):
State surcharge(12%of permit fee): $21.60
CCB lic.: 417 .. ///aza, 19 Total fee due upon application: $201.60
Authorized SignaThis permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
�"�, * Fee methodology set by Tri-County Building Industry
Print name: , i41Date: �2� r e Service Board.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
•
11111 N Building Division
e
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
Building Division
Plan Submittal Requirements
T G A R D Commercial&Multi-Family-New,Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. ►/ map&tax lot# ® project name ® site address ❑ suite number
® zoning ® applicant name ® phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
•
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
Building Division
Plan Submittal Requirement Matrix
T G A R D Commercial&Multi-Family-New,Additions or Alterations
Type of Subltxilttai
cludes new,additions and alterations) Reuxd at
5ubri�.
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing(building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Perniits\BUP-COM PermitApp.doc 03/03/2011
City of Tigard
II " COMMUNITY DEVELOPMENT DEPARTMENT
■
TIGARD Building Permit Review — Commercial - With Land Use
Building Permit #: 6ue020cg-- sci/
Site Address: /27l O ,c2a) 21 J e_ Suite/Bldg#:
Project Name: P`D 1 --- 1 ,k r4
(Name of commercial business occupKying the spacvacant,enter Spec Space.)
Planning Review /11
/ /
Proposal: Ca �7L ( 7Z /�J�--ee/ZOL/8-e_ �r'-Tf '�1
Od /1/k) -e)f 6>-- A Ai dou)S
14 Verify site address/suite# exists and active in permit system
7Verify
taiver Terrace Neighborhood: ❑ Yes ALJ No
and Use Case#: M nth.2 0/8 — 6004—
Pla atch Approved Land Use:
Site Plan Vrdscape Plan CIOther:
11krban Forestry Plan levation Plan
Building Height: Maximum Height Actual Height Exkhe
ditions Met: ❑ Prior to Submittal CI Prior to Permit Issuanc/
Of Business Licen
Exists: iQ Yes ❑ No,applicant notified to obtain business license
la\Aciiublic Facilities Improvement(PFI) Permit:
Required: ❑ Yes,applicant was notified No
pp Applied For: 111Yes ❑ No,stop intake
Notes:
Approved by Planning: — \, /;, Date: ,/(e //0
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: /.. /ce/ir
Site Plans: #
Building Plans: #
Building Permit#: OF 'nter building permit#above.
Workflow Routing: ■V lanning Illingineering Permit Coordinator 'Building
Workflow Sign-off: G Sign-off for Pl5nning(include notes from planning review)
Route Application Documents: ► Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
I
By Permit Technician: �,�, ' •���4�47� /j Date: /A /(.,,-Al—
/
I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_060116.docx
E ineering Review ,
gz,Slope at building pad: ,7' 0/0
FI Permit#: Ai/4
'/ ,4
E
"Met"prior to issuance of building permit ,t/asements (encroachments)per engine ring conditions of approval and plat (not typical on SDR/CUP) , i 1/4-
2'Water Quality/Quantity Facility: A/ A
Assess Water Quality Fee in-lieu: ❑ Yes ❑ No
Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No
LIDA Facility on lot: ❑ Yes ❑ No
❑ NOT Approved by Engineering: Date
Notes:
9,,,,-Approved by Engineering: �v Date: 1.2/12118'
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
DC Fees Entered: Wash Co Trans Dev Tax: LM' Yes ❑ N/A
Tigard Trans SDC: I ❑ N/A
Parks SDC: YYes ❑ N/A
to Issue Permit
Approved by Permit Coordinator: Date: / 1 g
I:\Building\Forms\BldgPermitRvw_COM_W ithlandUse_070915.docx