Permit CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2018-00329
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/07/2019
Parcel: 151260000300
Jurisdiction: Tigard
Site address: 9577 SW WASHINGTON SQUARE RD B07
Project: Morphe Subdivision: None Lot: None
Project Description: TI for new tenant.
Contractor: TRAINOR COMMERCIAL CONSTRUCTION INC Owner: PPR WASHINGTON SQUARE LLC
1925 FRANCISCO BLVD E STE 21 PO BOX 847
SAN RAFAEL,CA 94901 CARLSBAD, CA 92018
PHONE: 415-259-0200 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM Permit Fee-Additions,Alterations, 01/07/2019 $2,162.95
Class of Work: ALT Type of Const: IIB Demolition
Occupancy Grp: B Occupancy Load: 49 12%State Surcharge-Building 01/07/2019 $259.55
Dwelling Units: 0 Plan Review 11/23/2018 $1,405.92
Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 01/07/2019 $388.00
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 01/07/2019 $72.00
Value: $275,000 11x17)
Info Process/Archiving-Sm$0.50(up to 01/07/2019 $18.50
11x17)
Floor Areas: Metro Const.Excise Tax 01/07/2019 $330.00
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $4,636.92
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet: 1 Special Inspection(see plans)
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty •d: and all of r a licable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of i •uan e, • if wo is su pended for more the 180
days. ATTENTION: Oregon law requires you to follow t - ieQ1 s a i7• -d by the Oregon Utility Notific. on ent• . T ose rul s are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain- opy of the rules o direct questions to OUNC by calling .03. .2.19. or 1. .332. 44.
ii.
Issued By: , �/ r ittee Signature: ii. Al 44
em
�'�'v C 1503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Branden Taggart
From: Branden Taggart
Sent: Monday, November 19, 2018 6:28 PM
To: 'Timothy K. Schenk'
Cc: #Building Permit Technicians
Subject: Morphe Building Permit: BUP2018-00329 - 9577 SW Washington Square Rd
Attachments: Branden Taggart.vcf
Hi Tim,
Your permit for Morphe at Washington Square Mall has been created and is ready for payment. The balance due is
$1,405.92 and you can pay the plan review fee online through our website:
https://aca.accela.com/TIGARD/Default.aspx. Once the fees have been paid, we will route the plans for review.
To pay the fees online through our website, click on the Building tab, enter the permit number in the Record Number
field (BUP2018-00329), and click Search. Next,you will see the Payments section. Click on the arrow on the right of
Payments to select Fees. You will then see a breakdown of the permit fees, and you can click on the Pay Fees link to
complete the transaction. Please let us know when the fees have been paid, and we will route your permit for plan
review.
Thanks,
Branden Taggart
11111 he City of Tigard
M °fi. Senior Permit Technician
Community Development
ricARo
13125 SW FGail Blvd
Tigard,OR 97223
(503)71.8-2449
bra ndent@tiga rd-or,gat'
1
City of Tigard
111 COMMUNITY DEVELOPMENT DEPARTMENT
T1cARD Building Permit Review — Commercial - No Land Use
Building Permit #: BOP 2-01g-0032:i
Site Address: q571 SW +1\;,,j6,, S ere p Suite/Bldg#: 6O7
Project Name:
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Reviewj ` y
Proposal: kitha 1 d� "\\,-4r� �`� i4iiEickcot Sp/4 L &NA it del spite
I�1a rO it s-km
Existing Business Activity: S 414 01'104 Kt64i
Proposed Business Activity: &414 Or &
—/erify site address/suite# exists and active in permit systte
L1Y 'ver Terrace NeiRuc
borhood: El Yes lid No
V ning:
EV/Permitted Use: ilYes ❑ No ❑ Spec Space
[2i Confirm no land use required.
LJ Business License:
Exists: ❑ Yes Ud No,applicant notified to obtain business license
Notes:
Approved by Planning: L4Lc/1k, Date: I 2-1-if
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved 0 Not Approved
Revision 3: 0 Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: u�/i 3/f 1, /
Site Plans: # ,
Building Plans: #
Building Permit#: I r,building permit#above. /
Workflow Routing: lan g rmit Coordinator1�-B�liu ding
Workflow Sign-off: ign-o f for Planning(include notes from planning review)
Route Application Documents: ding: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes: �� � ' '/ � o -` ��Cv, �( r✓�L,�ici, idc�
By Permit Technician: � .. Date: /7/17/7
I:\Building\Forms\BldgPennitRvw_COM_NoLandUse 060 1 16.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
0 Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
/MC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes VN/A
Tigard Trans SDC: ❑ Yes /�/'�
Parks SDC: 0 Yes 1 N/A
K to Issue Permit
Approved by Permit Coordinator: Date: /Z c/'�—
I:\Building\Fonns\BldgPennitRvw_COM NoLandUse 070915.docx
City of Tigard
COMMUNITY DEVELOPMENT DEPARTMENT
■
Building Permit Review — Commercial - No Land Use
l iciARI)
Building Permit#: B f in-0032.1
Site Address: 9511 SW W4,;,yh, S,/jLre a Suite/Bldg#:1' 607-
Project Name: �kt
(Name of commercial business occupying the space. If vacant,enter Spec Space) I i I f
Planning Review c t, ._.Ai, - i t,a, 1
Q ' r i LA-74-/-7-'
Proposal: R{ J4 dt WI\-c t
Al �a4 iegit t'.‘ +6 MAI 4( !AI° d+lc Spam 4. ntiv _
rphit StOrt ii r
Existing Business Activity: S 44 0 r;r� �L�►i1 + c,L Or(11A1 46
Pro.• ed Business Activity: j,tttd Orie4j Li-kit
erify site address/suite#exists and active in permit syst ..
ver Terrace Neighborhood:
" borhood: ❑ Yes Ii No
U
ermitted Use: CYes ❑ No 0 Spec Space
L]Q Confirm no land use required.
f Business License:
Exists: 0 Yes IiQ No,applicant notified to obtain business license
Notes:
Approved by Planning: 4LDate: 12 I '
Revisions(after B ,i ,ing Submittal only) Revi Date
Revision 1: IU Approved 0 Not Approved — — J41; �
Revision 2: 0 Approved 0 Not Approved
Revision 3: 0 Approved 0 Not Approved
Building Permit Submittal
Original Submittal Date: , , v
Site Plans: # 4 '
Building Plans: #
Building Permit#: 1! nter building permit#above. /
Workflow Routing. [ jug (PeCoordinator iii caring
Workflow Sign-off: ign o f for Planning{'include notes from planning review)
Route Application Documents: adding: original permit application,site plans,building lans engineer and
beam calculations and trust details,if applicable,etc.
Notes: !,t.L�; _ ai! moi. v GG._.a., . , .c A ' .,, ! : - —
111111.
By Permit Technician: , , /, Date: f/y3-j4
L1Building\Fonns\RldgPermitRvw_COM_NoLandUse 060116.docx
Permit Coordinator Review
❑ Conditions"Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions(after Building Submittal only)
Revision Notice 1: Date Sent to Applicant
Revision Notice 2: Date Sent to Applicant
�/R
Revision Notice 3: Date Sent to Applicant
1 II SDC Fees Entered Wash Co Trans Dev Tax: 0 Yes p/NJA
v Tigard Trans SDC: 0 Yes
Parks SDC: 0 Yes t27AN/A
S to Issue Permit T
Approved by Permit Coordinator. Date I Z c/!�
1/frgd ,Jw/! I,
1:1Building\Forms\BldgPamitRvw__COM NolandUse 07091 5.docx
Elder-Jones
PERMIT SERVICE
1120 East 80th Street,#211
Bloomington,MN 55420-1498
" E: " ED Phone:(952)854-2854•Fax:(952)854-4909
TRANSMITTAL A ''9
clr';.3U11,DING IDIVLSION
1/14/2019
To: TOM HOCHSTATTER/BUILDING DIVISION 503-718-2432 MORPHE
CITY OF TIGARD WASHINGTON SQUARE
13125 SW HALL BLVD TIGARD, OR
TIGARD, OR 97223 BUP2018-00329
218-617
TOM HOCHSTATTER/BUILDING DIVISION,
I HAVE ENCLOSED THE FOLLOWING FOR THE ABOVE REFERENCED PROJECT AND WOULD
LIKE TO RESUBMIT FOR RE-REVIEW AND APPROVAL.
-THREE COMPLETE SETS OF PLAN CHANGES
-TWO SETS OF STRUCTURAL CALCS
-COMPLETED TRANSMITTAL FORM
-TWO COPIES OF THE REVISION BULLETIN FROM THE ARCHITECT
PLEASE DIRECT ANY COMMENTS OR QUESTIONS TO MY ATTENTION.
THANK YOU
TIM SCHENK
ELDER-JONES
952-345-6040
tims(ilelderiones.corn
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
9577 SW WASHINGTON SQUARE RD B07,
TIGARD, OR, 97223
Record Type: Record ID:
Commercial - Building BUP2018-00329
Inspection Type: Inspector:
299 Final inspection Jeff Grove
Result:
PASS - CofO
Comments:
Violation Summary:
Inspector Contractor