Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2018-00329 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/07/2019 Parcel: 151260000300 Jurisdiction: Tigard Site address: 9577 SW WASHINGTON SQUARE RD B07 Project: Morphe Subdivision: None Lot: None Project Description: TI for new tenant. Contractor: TRAINOR COMMERCIAL CONSTRUCTION INC Owner: PPR WASHINGTON SQUARE LLC 1925 FRANCISCO BLVD E STE 21 PO BOX 847 SAN RAFAEL,CA 94901 CARLSBAD, CA 92018 PHONE: 415-259-0200 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Permit Fee-Additions,Alterations, 01/07/2019 $2,162.95 Class of Work: ALT Type of Const: IIB Demolition Occupancy Grp: B Occupancy Load: 49 12%State Surcharge-Building 01/07/2019 $259.55 Dwelling Units: 0 Plan Review 11/23/2018 $1,405.92 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 01/07/2019 $388.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 01/07/2019 $72.00 Value: $275,000 11x17) Info Process/Archiving-Sm$0.50(up to 01/07/2019 $18.50 11x17) Floor Areas: Metro Const.Excise Tax 01/07/2019 $330.00 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $4,636.92 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: 1 Special Inspection(see plans) Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty •d: and all of r a licable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of i •uan e, • if wo is su pended for more the 180 days. ATTENTION: Oregon law requires you to follow t - ieQ1 s a i7• -d by the Oregon Utility Notific. on ent• . T ose rul s are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain- opy of the rules o direct questions to OUNC by calling .03. .2.19. or 1. .332. 44. ii. Issued By: , �/ r ittee Signature: ii. Al 44 em �'�'v C 1503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Branden Taggart From: Branden Taggart Sent: Monday, November 19, 2018 6:28 PM To: 'Timothy K. Schenk' Cc: #Building Permit Technicians Subject: Morphe Building Permit: BUP2018-00329 - 9577 SW Washington Square Rd Attachments: Branden Taggart.vcf Hi Tim, Your permit for Morphe at Washington Square Mall has been created and is ready for payment. The balance due is $1,405.92 and you can pay the plan review fee online through our website: https://aca.accela.com/TIGARD/Default.aspx. Once the fees have been paid, we will route the plans for review. To pay the fees online through our website, click on the Building tab, enter the permit number in the Record Number field (BUP2018-00329), and click Search. Next,you will see the Payments section. Click on the arrow on the right of Payments to select Fees. You will then see a breakdown of the permit fees, and you can click on the Pay Fees link to complete the transaction. Please let us know when the fees have been paid, and we will route your permit for plan review. Thanks, Branden Taggart 11111 he City of Tigard M °fi. Senior Permit Technician Community Development ricARo 13125 SW FGail Blvd Tigard,OR 97223 (503)71.8-2449 bra ndent@tiga rd-or,gat' 1 City of Tigard 111 COMMUNITY DEVELOPMENT DEPARTMENT T1cARD Building Permit Review — Commercial - No Land Use Building Permit #: BOP 2-01g-0032:i Site Address: q571 SW +1\;,,j6,, S ere p Suite/Bldg#: 6O7 Project Name: (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Reviewj ` y Proposal: kitha 1 d� "\\,-4r� �`� i4iiEickcot Sp/4 L &NA it del spite I�1a rO it s-km Existing Business Activity: S 414 01'104 Kt64i Proposed Business Activity: &414 Or & —/erify site address/suite# exists and active in permit systte L1Y 'ver Terrace NeiRuc borhood: El Yes lid No V ning: EV/Permitted Use: ilYes ❑ No ❑ Spec Space [2i Confirm no land use required. LJ Business License: Exists: ❑ Yes Ud No,applicant notified to obtain business license Notes: Approved by Planning: L4Lc/1k, Date: I 2-1-if Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: u�/i 3/f 1, / Site Plans: # , Building Plans: # Building Permit#: I r,building permit#above. / Workflow Routing: lan g rmit Coordinator1�-B�liu ding Workflow Sign-off: ign-o f for Planning(include notes from planning review) Route Application Documents: ding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: �� � ' '/ � o -` ��Cv, �( r✓�L,�ici, idc� By Permit Technician: � .. Date: /7/17/7 I:\Building\Forms\BldgPennitRvw_COM_NoLandUse 060 1 16.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit 0 Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: /MC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes VN/A Tigard Trans SDC: ❑ Yes /�/'� Parks SDC: 0 Yes 1 N/A K to Issue Permit Approved by Permit Coordinator: Date: /Z c/'�— I:\Building\Fonns\BldgPennitRvw_COM NoLandUse 070915.docx City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT ■ Building Permit Review — Commercial - No Land Use l iciARI) Building Permit#: B f in-0032.1 Site Address: 9511 SW W4,;,yh, S,/jLre a Suite/Bldg#:1' 607- Project Name: �kt (Name of commercial business occupying the space. If vacant,enter Spec Space) I i I f Planning Review c t, ._.Ai, - i t,a, 1 Q ' r i LA-74-/-7-' Proposal: R{ J4 dt WI\-c t Al �a4 iegit t'.‘ +6 MAI 4( !AI° d+lc Spam 4. ntiv _ rphit StOrt ii r Existing Business Activity: S 44 0 r;r� �L�►i1 + c,L Or(11A1 46 Pro.• ed Business Activity: j,tttd Orie4j Li-kit erify site address/suite#exists and active in permit syst .. ver Terrace Neighborhood: " borhood: ❑ Yes Ii No U ermitted Use: CYes ❑ No 0 Spec Space L]Q Confirm no land use required. f Business License: Exists: 0 Yes IiQ No,applicant notified to obtain business license Notes: Approved by Planning: 4LDate: 12 I ' Revisions(after B ,i ,ing Submittal only) Revi Date Revision 1: IU Approved 0 Not Approved — — J41; � Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: , , v Site Plans: # 4 ' Building Plans: # Building Permit#: 1! nter building permit#above. / Workflow Routing. [ jug (PeCoordinator iii caring Workflow Sign-off: ign o f for Planning{'include notes from planning review) Route Application Documents: adding: original permit application,site plans,building lans engineer and beam calculations and trust details,if applicable,etc. Notes: !,t.L�; _ ai! moi. v GG._.a., . , .c A ' .,, ! : - — 111111. By Permit Technician: , , /, Date: f/y3-j4 L1Building\Fonns\RldgPermitRvw_COM_NoLandUse 060116.docx Permit Coordinator Review ❑ Conditions"Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions(after Building Submittal only) Revision Notice 1: Date Sent to Applicant Revision Notice 2: Date Sent to Applicant �/R Revision Notice 3: Date Sent to Applicant 1 II SDC Fees Entered Wash Co Trans Dev Tax: 0 Yes p/NJA v Tigard Trans SDC: 0 Yes Parks SDC: 0 Yes t27AN/A S to Issue Permit T Approved by Permit Coordinator. Date I Z c/!� 1/frgd ,Jw/! I, 1:1Building\Forms\BldgPamitRvw__COM NolandUse 07091 5.docx Elder-Jones PERMIT SERVICE 1120 East 80th Street,#211 Bloomington,MN 55420-1498 " E: " ED Phone:(952)854-2854•Fax:(952)854-4909 TRANSMITTAL A ''9 clr';.3U11,DING IDIVLSION 1/14/2019 To: TOM HOCHSTATTER/BUILDING DIVISION 503-718-2432 MORPHE CITY OF TIGARD WASHINGTON SQUARE 13125 SW HALL BLVD TIGARD, OR TIGARD, OR 97223 BUP2018-00329 218-617 TOM HOCHSTATTER/BUILDING DIVISION, I HAVE ENCLOSED THE FOLLOWING FOR THE ABOVE REFERENCED PROJECT AND WOULD LIKE TO RESUBMIT FOR RE-REVIEW AND APPROVAL. -THREE COMPLETE SETS OF PLAN CHANGES -TWO SETS OF STRUCTURAL CALCS -COMPLETED TRANSMITTAL FORM -TWO COPIES OF THE REVISION BULLETIN FROM THE ARCHITECT PLEASE DIRECT ANY COMMENTS OR QUESTIONS TO MY ATTENTION. THANK YOU TIM SCHENK ELDER-JONES 952-345-6040 tims(ilelderiones.corn City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 9577 SW WASHINGTON SQUARE RD B07, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Building BUP2018-00329 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - CofO Comments: Violation Summary: Inspector Contractor