Permit CITY OF TIGARD BUILDING PERMIT
' COMMUNITY DEVELOPMENT Permit#: BUP2018 00050
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/15/2018
T f t"'1 j' ' g Parcel: 2S115AA00100
Jurisdiction: Tigard
Site address: 16114 SW 108TH AVE
Project: Brightwaters at Redhawk Subdivision: WILLOW-BROOK-FARM Lot: 36
Project Description: Targeted siding repairs.
Contractor: JR JOHNSON INC Owner: DHP BRIGHTWATERS LLC
PO BOX 17196 32 MEADOW HILL DR
PORTLAND, OR 97217 TIBURON, CA 94920
PHONE: 503-240-3388 PHONE:
FAX: 503-240-3424
Specifics: FEES
Description Date Amount
Type of Use: SFA
Class of Work: ALT Type of Const: VBPermit Fee-Additions,Alterations, 05/14/2018 $256.22
Occupancy Grp: R-2 Occupancy Load: 49 Demolition
12%State Surcharge-Building 05/14/2018 $30.75
Dwelling Units: 0 Plan Review 03/16/2018 $166.54
Stories: 0 Height: 0 ft Info Process/Archiving-Sm$0.50(up to 05/14/2018 $20.00
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $11,694 Additional Plan Review 05/14/2018 $45.00
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $518.51
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: ;iiit 7% — Permittee Signature: aA/ t9749/04.7 C`
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial „ .. FOR()HA( I I SI ONI.N
•
i • City of Tigard r,
r---) (I CP, `)ri 1 Received3azimami Ar
Date/B : -..":7 Permit NI• 1
4 d 0,4v/e- eea_5-0
114 . 13125 SW Hall Blvd.,Tigard,OR 97223 Lb -' L7 '' Plan Review
Phone: 503.718.2439 Fax: 503.598.1960 - . , m Date/B : .....1 -
. I Other Permit:
T 1 c,,,\R I) Inspection Line: 503.639.4175 , . , . -..,1 Date Ready/By: „,,TO 10 See Page 2 for
Internet: www.tigard-or.gov r--,---,-. ''' ',,- 1.-”•••--"'- ' Notified/Method. 2 /, -my° Supplemental Information
"77g,t-- /-/-
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
0 New construction 0 Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Z Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
CATEGORY OF CONSTRUCTION
Valuation: $
0 1-and 2-family dwelling 0 Commercial/industrial
0 Accessory building El Multi-family Number of bedrooms:
0 Master builder 0 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site Ave address: W 108th 1
?WIG New dwelling area: square feet
City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet
Suite/bldg./apt. .:16114 ' Project name:Brightwaters at Redhawk Covered porch area: square feet
Cross street/directions to job site:SW Durham Rd. Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel no.:
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Valuation: $$11,694.00
Targeted siding repairs.
Existing building area: square feet
New building area: square feet
la PROPERTY OWNER 0 TENANT Number of stories:
Name:Douglas Pringle Type of construction:
Address:32 Meadow Hill Dr. Occupancy groups:
City/State/ZIP:Tiburon,CA 94920 Existing:
Phone:(415)710-8184 Fax:( ) New:
2:1 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule)
Business name:J.R.Johnson Inc.
Structural plan review fee(or deposit):
Contact name:Deborah O'Dell
FLS plan review fee(if applicable):
Address:9425 N Burrage Ave
Total fees due upon application:
City/State/ZIP:Portland,OR 97020
Phone: )) '?,va_„, , I Fax::( ) Amount received:
—.--
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
E-InaThe 0717-Aar4eLe de_2Ansoe7 io& e 0 4->_
1 Commercial and residential prescriptive installation of
NTRACT°R roof-top mounted Photo Voltaic Solar Panel System.
Business name:SAME AS APPLICANT Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: Solar Installation Specially Code checklist.
City/State/ZIP: Permit fee(includes plan review
$180.00
and administrative fees):
Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60
CCB tic.:102676
Total fee due upon application: $201.60
Authorized signature: W0\OMOA., 0 '
_A° $ % This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Date:02/28/2018 * Fee methodology set by Tri-County Building Industry
Print name:DEBORAH O'DELL Service Board.
1:\Building\Pennits BUP-COM PermitApp.doc 02/24/2011 440-4613T(1 I/02/COM/WEB)
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
`1 _ Transmittal Letter
1 ]c,A It n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: D
DEPT: BUILDING DIVISION ytyanD
FROM:
1)16/0DVO 0 , DCJ I APR 3 0 2018
CITY OF TIGARD
COMPANY: j. p_ c)oV1 n soYt 1 N C,• BUILDING DIVISI ,' ,
PHONE: �
� &DW
.0
3. 2 . 330 5 Bir
y
RE: D IkV1-& -1� 0D�
(Site Address) Number) ,
br o Vi-uvs fli 14
(Project nane or subdivision m nd Nun er
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
X Additional set(s) of plans. )c Revisions:
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations 7 � Engineer's calculations.
ill)
X Other(explain):'n11 /� I/n '/ p .fin prot �n,,�..
REMARKS: h t 1 V D, I vL I i VL 1 1/l i ' Y , a2f a
GICC_ Dem iv\ a at bVIda, rramir p €r -r'\t r ' + o
as-kolk atOWNIOL-S.
FOR OFFICE USE ONLY
Routed to Permit T,ec an: Date: (-- - ) c' Initials:
Fees Due: Yes u No Fee Description: Amounte
$ s--Du- : �
$
$
$
Special
Instructions:
Reprint Permit(per P : ❑ Yes I No ❑ Done _
Applicant Notified: Date: �1�i a Initials:
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
16114 SW 108TH AVE, TIGARD, OR, 97224
Record Type: Record ID:
Commercial - Building BUP2018-00050
Inspection Type: Inspector:
299 Final inspection Jeff Grove
Result:
PASS - NoCofO
Comments:
Violation Summary:
Inspector Contractor