Loading...
Permit (15) 1111 ai CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT Permit#: MEC2018-00058 TiGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/02/2019 Parcel: 1 S 135AC04400 Jurisdiction: Tigard Site address: 8920 SW OAK ST Project: Oak Street Apartments Subdivision: ASHBROOK FARM Lot: 14 Project Description: Mechanical for building B-87 unit apartment building. Contractor: RITE WAY HEATING&A/C INC Owner: DBG OAK STREET LLC PO BOX 1815 2164 SW PARK PL HILLSBORO, OR 97123 PORTLAND, OR 97205 PHONE: 503-693-3161 PHONE: FAX: 503-647-9999 FEES Specifics: Description Date Amount Type of Use: MF Permit Fee 01/02/2019 $18,668.71 Class of Work: NEW Type of Const: IIA Plan Review 01/02/2019 $4,667.18 Occupancy Grp: R-2 Occupancy Load: 12%State Surcharge-Mechanical 01/02/2019 $2,240.25 Stories: 5 Project Valuation: $650,000.00 Fuel Air Handlers Fuel Types: Electricity Units<10000 cfm: 51 Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 102 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: 102 Appliances Vent Fans: 114 Vent Systems: Total $25,576.14 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: 102 Other Mech Units: Gas Outlets: Other Desc: Duct Work: 1000 Fire/Smoke Dampers: 15 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in -001-0010 through OAR 952-001-00•:. You m. pbt n a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.8 #.332.2344. Issued By: v •- ,Signature: r '� Call 03.4175 by 7:00 a.m.for the next available inspect •n date. This permit card shall be kept in a conspicuous place on the job site until .•mpletion of the project. Approved plans are required on the job site at the time of eac inspection. Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial& Multi-Family Fee Schedule: Total Valuation:, Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:\Building\Permits\MEC_PennitApp_040113.doc 2 Branden Taggart From: Branden Taggart Sent: Wednesday, December 26, 2018 3:40 PM To: 'Jared Mauch' Cc: #Building Permit Technicians Subject: Oak Street Apartments Mechanical Permits: MEC2018-00056 & MEC2018-00058 Attachments: Branden Taggart.vcf; Oak Street Apartments Mechanical Permit Fees.pdf Hi Jared, The mechanical permits for Oak Street Apartments are ready to issue now. The fees due are as follows: Oak Street Apartments Permit# Fees Due MEC2018-00056 $ 25,701.64 MEC2018-00058 $ 25,576.14 Total: $ 51,277.78 The permit fees can be paid online at https://aca.accela.com/TIGARD/Default.aspx or in person between the hours of 8:00 a.m. and 4:30 p.m., Monday through Thursday. We are closed next Tuesday for the holiday and on Fridays. If you pay online, please notify us at tigardbuildingpermits@tigard-or.gov. Also, we will need your contractor's license information prior to issuing either permit. If you have questions, please let me know. Thank you, Branden Taggart OhNg City of Tigard a Senior Permit Technician Community Development TIGA 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 brandent r tigard-o r.gov 1 Branden Taggart From: Branden Taggart Sent: Wednesday, December 26, 2018 3:40 PM To: 'Jared Mauch' Cc: #Building Permit Technicians Subject: Oak Street Apartments Mechanical Permits: MEC2018-00056 & MEC2018-00058 Attachments: Branden Taggart.vcf; Oak Street Apartments Mechanical Permit Fees.pdf Hi Jared, The mechanical permits for Oak Street Apartments are ready to issue now. The fees due are as follows: Oak Street Apartments Permit# Fees Due MEC2018-00056 $ 25,701.64 MEC2018-00058 $ 25,576.14 Total: $ 51,277.78 The permit fees can be paid online at https://aca.accela.com/TIGARD/Default.aspx or in person between the hours of 8:00 a.m. and 4:30 p.m., Monday through Thursday. We are closed next Tuesday for the holiday and on Fridays. If you pay online, please notify us at tigardbuildingpermits@tigard-or.gov. Also,we will need your contractor's license information prior to issuing either permit. If you have questions, please let me know. Thank you, Branden Taggart PINv City of Tigard II Senior Permit Technician Community Development 7 f i,A RD 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 brandent@tigard-or.gov 1 • FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter r .;A R n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: kS VIA / 5 - DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED , � Li DEC 1 U 2018 FROM: S�t L CITY OF TIGARD COMPANY: vi ©S BUILDING DIVISION PHONE: 97/ -Pet( —/ttS RE: �/Z4 J G.,l � 144 1 °°6 6& (Site Address) ( ermit Number) Project name or sub ivision name end lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: ?pi0 c1�1/vki FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑Yes ❑No Fee Description: Amount Due: Special Instructions: Reprint Permit(per PE): ❑ Yes ❑No ❑ Done Applicant Notified: Date: Initials: 1:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal a smlttal Letter T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: / i - i- DATE RECEIVED: DEPT: BUILDING DIVISION _ DEC 6 2013 FROM: eS5 el9/ave,,�1,1ev' (J l ' or- r 1043. 0 U COMPANY: .4C-i Spvrustf.c•u,es PHONE: 5O - 2:4 2— g 5r 3"3 # RE: *to Si.,) wk 5,/ / i_aC �V� C .1Lt • F=Gro/9-000s—g 1 000"C-$1 V+ (Site Address) (Permit Number) IJC� S�t,n�� �1cr� Gi.rr-uI (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: kl Additional set(s) of plans. Revisions: Cross sections) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. l ,� ( Other(explain): ;i,�ute,yt c c,4 c e- 1.5- �1\' REMARKS: FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑ No Fee Description: Amount Due: A2"."' $ Special Instructions: Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions 0613I6.doc FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT `►� = , Transmittal Letter T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATERESEIETV DEPT: BUILDING DIVISION RE El) teaik,() )LDEC102018 FROM: CJ 1 v� -- an OF TIGAItD COMPANY: ;A 6_ S"12t h BUILDING DIVISION PHONE: -?/ - 2�—6 (8 3S By:? 4. `5� �/� / tt /� �YJ )j6,(Site Ad esss5` RE: ermt Number 4 IL r _ /�iZ c /-ad d s7( Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS:--p/frt. wee-kit-2_8J FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑No Fee Description: Amount Due: Special Instructions: Reprint Permit(per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. 1111 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter TIGARD, 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: -got DAT +i D t ED DEPT: BUILDING DIVISION DEC 11 Z018 FROM: 3r5se CITY OF TIGARD BUILDING DIVISION COMPANY: A61 5, ti .1 s 69,;(41;.e 5 By: PHONE: 6(q-qV' 6032 RE: `lO/i MO 5(A) O .i< 5 f 1,'1L `5-GCi 0-C-6 (Site Address) (Permit Number) r'd S8P' dpi/< VeeT1 A (Project name or subdivisio name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): 4,f/t s s,"4,5 $cc c-4 of /01,,Lis REMARKS: FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑ No Fee Description: Amount Due: Special Instructions: Reprint Permit (per PE): ❑ Yes ❑No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 City of Tigard Tel: 503.718.2439 Location: Inspection Date: 8920 SW OAK ST, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Mechanical MEC2018-00058 Inspection Type: Inspector: 699 Mechanical final Jeff Grove Result: PASS - NoCofO Comments: Violation Summary: Inspector Contractor