Permit 11 CITY OF TIGARD ;"''. MASTER PERMIT
i ,
' �� Permit#: MST2018-00358
COMMUNITY DEVELOPMENT (�, `y
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 WI, 1J1PJ7 Date Issued: 01/02/2019
T I[_ A I:.n gParcel: 2S106DB05900
Jurisdiction: Tigard
Site address: 13258 SW APPLE GROVE TER
Subdivision: RIVER TERRACE NORTHWEST Lot: 59
Project: Xu
Project Description: Solar photovoltaic system. 1/30/19: REPRINT to add(1)circuit for EV car charger.
BUILDING
Floor Areas Required Setbacks Required
Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0
Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke
Dwelling Units: 0 Third: 0 sf Right: 0 Detectors:
Total: 0 sf Value: $15,895.00 Rear: 0
PLUMBING
Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0
Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0
Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Drains: Catch Basins: 0
Bckflw Prevntr: 0
Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0
Other Fixtures: 0
Drywell-Trench Drain: 0
Other Fixture Units:
MECHANICAL
Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0
Heat Pump: N Hoods: 0 Other Units: 0
Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0
Furn>=100K: 0
ELECTRICAL
Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits
1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0
Ea add'I 500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 1
Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0
601-1000 amp: 0 601+amp-1000v: 0
1000+amp/volt: 0
ELECTRICAL-RESTRICTED ENERGY
SF Residential
Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All
Other: Y Other Description: Roof top PV system 6.93 kW Ecompasing: N
BUILDING INFO
Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet:
ALT SF VB R-3 0
Owner: Contractor:
XU,ZHONGNAN A AND R SOLAR CORP Required Items and Reports(Conditions)
PAN,TIFFANY 1887 SW MILPORT RD
13258 SW APPLE GROVE TER MILWAUKIE,OR 97222
SHERWOOD,OR 97140
PHONE: 503-880-3351 PHONE: 503-939-7663
FAX:
Total Fees: $424.11
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-0` -009/ ou may obt a copy of the r les or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. *-
// �y,� 9)/
7/ter
Issued By: . iil� �N� ' Permittee Signature: — C_ G% ���/`�`G � ��
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project
Approved plans are required on the job site at the time of each inspection.
CITY OF TIGARD MASTER PERMIT
I COMMUNITY DEVELOPMENT
Permit#: MST2018-00358
Date Issued: 01/02/2019
T r G, tg D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S106DB05900
Jurisdiction: Tigard
Site address: 13258 SW APPLE GROVE TER
Subdivision: RIVER TERRACE NORTHWEST Lot: 59
Project: Xu
Project Description: Solar photovoltaic system.
BUILDING
Floor Areas Required Setbacks Required
Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0
Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke
Dwelling Units: 0 Third: 0 sf Right: 0 Detectors:
Total: 0 sf Value: $15,895.00 Rear: 0
PLUMBING
Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0
Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF RainStorm Sewer: 0
0
Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Drains: Catch Basins: 0
Bckflw Prevntr: 0
Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0
Other Fixtures: 0
Drywell-Trench Drain: 0
Other Fixture Units:
MECHANICAL
Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0
Heat Pump: N Hoods: 0 Other Units: 0
Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0
Furn>=100K: 0
ELECTRICAL
Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits
1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0
Ea add!500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0
Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0
601-1000 amp: 0 601+amp-1000v: 0
1000+amp/volt: 0
ELECTRICAL-RESTRICTED ENERGY
SF Residential
Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All
Other: Y Other Description: Roof top PV system 6.93 kW Ecompasing: N
BUILDING INFO
Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet:
ALT SF VB R-3 0
Owner: Contractor:
XU,ZHONGNAN A AND R SOLAR CORP Required Items and Reports(Conditions)
PAN,TIFFANY 1887 SW MILPORT RD
13258 SW APPLE GROVE TER MILWAUKIE,OR 97222
SHERWOOD,OR 97140
PHONE: 503-880-3351 PHONE: 503-939-7663
FAX:
Total Fees: $361.19
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You u- •r -in a copy of •- - •'ect questions to OUNC by calling 503.2 . 987er 1.800.3 2.2344.
Si n re: I ��
Issued By: ..,--,ANC--....- - �— — \
C., 9.4175 by 7:00 a.m.for the next av •able inspection date.
This permit card shall be kept in a conspicuous place on th job site until completion of the project.
Approved plans are required on the job site a the time of each inspection.
Building Permit Application
Residential
V,s' ..c IOROII1( I, t SF,O\I.)
City of Tigard vea
Iliii g 13125 SW Hall Blvd.,Tigard,OR 97223 DateBy: i� a /�/ ,4o!�r-00,5C-,= Plan Review �/ //
Phone: 503.718.2439 Fax: 503.598.1960 DEC 2 0 201F Date/By: I a 7 /' Other my
Other Permit:
I I(;ARD Inspection Line: 503.639.4175 Date Ready/By: /�n , 4 Suns: 1 gl See Page 2 for
Internet: www.tigard-or.gov ethod: , , , 6/ /1 Supplemental Information
CITY'OF T`IGA '.. , ,
TYPE OF;WORBUILD ENG 9l�Si REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
® 1-and 2-family dwelling 0 Commercial/industrial n. Valuation: $15,895
❑Accessory building 0 Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION. Total number of floors:
Job site address:13258 SW Apple Grove Ter New dwelling area: square feet
City/State/ZIP:Sherwood OR 97140 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Zhongnan Covered porch area: square feet
Cross street/directions to job site:Roy Rogers Road Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Installation of 6.930 kW photovoltaic system on roof Valuation: $
Existing building area: square feet
New building area: square feet
® PROPERTY OWNER 0 TENANT Number of stories:
Name:Zhongnan Xu Type of construction:
Address:13258 SW Apple Grove Ter Occupancy groups:
City/State/ZIP:Sherwood OR 97140 Existing:
Phone:(503)880-3351 Fax:( )
New:
El APPLICANT
® CONTACT PERSON BUILDING PERMIT FEES*
Business name:A&R Solar (P/ e+Eft*tofee schedule)
Structural plan review fee(or deposit):
Contact name:Tina Kayser
Address:6800 NE 59'Place FLS plan review fee(if applicable):
City/State/ZIP:Portland OR 97218 Total fees due upon application:
Phone:(503)939-7663 Fax::( ) Amount received:
E-mail:permits@a-rsolar.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
rooftop mounted PhotoVoltaic Solar Panel System.
Business name:A&R Solar Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:6800 NE 59th Place Solar Installation Specialty Code checklist.
City/State/ZIP:Portland OR 97218 Permit Fee(includes plan review $180.00
and administrative fees):
Phone:(503)420-8680 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lic.:207641
Total fee due upon application: $201.60
Authorize$-sit turez-- This permit application expires if a permit is not obtained
// /l within 180 days after it has been accepted as complete.
Print name:Tina Kays Date: 12/20/18 *Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP-RESPermitApp.doe 02/24/2011 440-4613T(11/02/COM/WEB)
Electrical Permit Application 1.0R OFFIc I. 1 SL ONI.l
' 1111 City of Tigard C RE Date/By: ` Permit#:
• 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review
Phone: 503.718.2439 Fax: 503.598.1960 (�js�eBy: Related Permit#:
Inspection Line: 503.639.4175 f E , 2 vRc�dy DateBy. Juris: ® See Page 2 for
T I G A R D Internet: www.tigard-or.govNotified/Method: Supplemental Information
CITY OF Ti t * I '
T"1'PE E)F 1VQ �� PLAN RE1'1E .a
❑N ® �i ,Divi
i ®1� ,
New construction Addition/alteration/re Please check all that apply(submit 2 sets of plans w/items checked):
0 Service or feeder 400 amps or more 0 Building over three stones.
❑Demolition ❑Other: where the available fault current 0 Marinas and boatyards.
CATEGORYCATE:464k OF C0NSIII( CUON exceeds 10,000 amps at 150 volts or 0 Floating buildings.
® 1-and 2-family dwelling ❑Commercial/industrial 0 Accessory building less to ground,or exceeds 14,000 0 Commercial-use agricultural
amps for all other installations. buildings.
❑Multi-family 0 Master builder 0 Other: 0 Fire pump. 0 Installation of 150 KVA or
JOB SITE INFORMATIONAND LOCATION 0 Emergency system. larger separately derived
0 Addition of new motor load of system.
Job#: Job site address: 13258 SW Apple Grove Ter 100HP or more. ❑"A","E","1-2 "1-3
Ci /State/ZIP:Sherwood OR 97140 0 Six or more residential units. occupancy.
0 Health-care facilities. 0 Recreational vehicle parks.
Suite/bldg./apt.#: Project name:Zhongnan 0 Hazardous locations. 0 Supply voltage for more than
0 Service or feeder 600 amps or more. 600 volts nominal.
Cross street/directions to job site:Roy Rogers Road FEE EDVLE
Description I Qty. I Each I Total 1
New residential single-or multi-family dwelling unit.
Subdivision: Lot#: Includes attached garage.
1,000 sq.ft.or less 168.54 4
Tax map/parcel#:
Ea.add'l 500 sq.ft.or portion 33.92 I
,J., DESCRIPTION OF WORK Limited energy,residential
Installation of 6.930 kW photovoltaic system on roof and EV car charger
(with above sq.ft.) 75.00 2
Limited energy,multi-family 75.00 2
residential(with above sq.ft.)
Renewable Energy 0 See Page 2
€) PROPERTY OWNER 0NANT Services or feeders installation,alteration,and/or relocation
Name:Zhongnan Xu 200 amps or less 100.70 2
Address:13258 SW Apple Grove Te 201 amps to 400 amps 133.56 2
401 amps to 600 amps 200.34 2
City/State/ZIP:Sherwood OR 97140 601 amps to 1,000 amps 301.04 2
Phone:(503)880-3351 Fax:( ) Over 1,000 amps or volts 552.26 2
Temporary services or feeders installation,alteration,and/or
Email: relocation
Owner installation:This installation is being made on property that I own which is not 200 amps or less 59.36 1
intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps 125.08 2
Owner signature: Date: 401 amps to 599 amps 168.54 2
we APPLICANT ❑ CONTACT PERSON Branch — w, raion,or extension,per panel
A.Fee for branchcircuits circuitsnewith t
Business name:A&R Solar above service or feeder fee,
7.42 2
each branch circuit
Contact name:Tina Kayser B.Fee for branch circuits without
service or feeder fee,first 1
Address:6800 NE 59th place branch circuit 56.18 2
City/State/ZIP:Portland OR 97218 Each add'l branch circuit 7.42 2
Miscellaneous(service or feeder not included)
Phone:(503)939-7663 Fax: :( ) Each manufactured or modular 67.84 2
dwelling,service and/or feeder
Email:permits@a-rsolar.com Reconnect only 67.84 2
CONTRACTOR Pump or irrigation circle 67.84 2
Business name:A&R Solar Sign or outline lighting 67.84 2
Address:6800 NE 59th Place Signal circuit(s)or limited-energy 0 See Page 2 2
panel,alteration,or extension.
City/State/ZIP:Portland OR 97218 Each additional inspection over allowable in any of the above
Additional inspection(1 hr min) 66.25/hr
Phone:(503)420-8680 Fax:( ) Investigation(1 hr min) _ 90.00/hr
Email:permits@a-rsolar.com Industrial plant(1 hr min) 78.18/hr
Inspections for which no fee is 90.00/hr
CCB Lic.: 207641 Electrical Lie.: C1179 Suprv.Lie.: 54945 specifically listed(Y:hr mm)
ELECTRICAL PERMIT FEES
Suprv.Electrician signature,required: 91,/Vtcyv1,Akl Subtotal:
Print name: Robert Nieman Date: 12/20/18 0 Plan Review Required(25%of permit fee):
State surcharge(12%of permit fee):
Authorized signature:71.44, x--7,4„., TOTAL PERMIT FEE:
This permit application expires if a permit is not obtained within 180
Print name: Tina Kayser Date: 12/20/18 days after it has been accepted as complete.
* Number of inspections allowed per permit.
I:\Building\Permits\ELC_PermitApp_ELR_ERE.doe Rev 06/17/2015 440-4615T(11/05/COM/WEB
Electrcal Permit Application—City of Tigard
.Page 2—Supplemental Information
Limited Energy Permit Fees: Renewable Energy Permit Fees:
RESIDENTIAL WORK ONLY. soul), j1LIJ r
Description Qty. Each l Total
Fee for all residential systems combined: $75.00 Renewable electrical energy systems:
Check Type of Work Involved: 5 kva or less 100.70 2
5.01 to 15 kva 1 133.56 133.56 2
❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2
Wind generation systems in excess of 25 kva:
❑ Burglar Alarm 25.01 to 50 kva 301.04 2
50.01 to 100 kva 552.26 2
❑ Garage Door Opener* >100 kva(fee in accordance
with OAR 918-309-0040) 552.26 2
❑ Heating,Ventilation and Air Conditioning Solar generation systems in excess of 25 kva:
System*
Each additional kva over 25 7.42 3
111 Vacuum Systems* >100 kva—no additional charge 0.0 3
Each additional inspection over allowable in any of the above:
II Other: Each additional inspection is 66.25/hr
charged at an hourly(1 hr min)
Inspections for which no fee is 90.00/hr
specifically listed(%hr min)
ELECTRIC�L PERMIT FEES
COMMERCIAL WORK ONLY: Subtotal(Enter on Page 1).
Fee for each commercial system: $75.00
(SEE OAR 918-309-0000) * Number of inspections allowed per permit.
Check Type of Work Involved:
❑ Audio and Stereo Systems
❑ Boiler Controls
❑ Clock Systems
❑ Data Telecommunication Installation
❑ Fire Alarm Installation
❑ HVAC
CI Instrumentation
❑ Intercom and Paging Systems
❑ Landscape Irrigation Control*
❑ Medical
❑ Nurse Calls
❑ Outdoor Landscape Lighting*
❑ Protective Signaling
❑ Other:
Total number of commercial systems:
*No licenses are required. Licenses are required for all
other installations
I:\Bwiding\Permits\ELC_PemmitApp_ELR_ERE.doc Rev 06/17/2015
City of Tigard
N . p Building Division ELEIV D) 4-4, E
• 13125 SW Hall Blvd,Tigard,OR 97223
Phone: 503.718.2439 Fax: 503.598.1960 i C 2 2018 OiR
T I G A R D Inspection Line: 503.639.4175
www.tigard-or.gov CITY OF'TIGARD
IILDINNG DIVISION
2010 Oregon Solar Installation Specialty Code
Check List for Prescriptive Installation of Roof-Mounted
PhotoVoltaic Solar Panel System
Property Information
Installation Address: 13258 SW Apple Grove Ter
City: Sherwood OR Zip: 97140
Owner's Name: Zhongnan Xu Date: 12/20/18
Contractor's Name: A&R Solar CCB #: 207641
Design Parameters of the Property/Structure
If"Yes", does not
Flood Hazard Is the installation El Yes qualify for the
Area Located in a flood prescriptive path, follow
plain/flood way? ® No OSSC or ORSC for
design requirements.
Is the wind exposure 1=1 Yes If"Yes", qualifies for
Wind Exposure "C"or less?
® No the prescriptive path.
Installations on detached Is the Ground Snow
single/two-family Load 70 psf or less?
dwelling/single/two- If"Yes", qualifies for
family townhomes ❑ Yes the prescriptive path.
and/or their accessory
Ground structures. ® No
Snow Load Is the Ground Snow
Installations on all Load 50 psf or less?
structures other than If"Yes", qualifies for
❑ Yes the prescriptive path.
above
® No
1
I:/Building/Forms/Photo Voltaic-Checklist.docx
Is the construction
material wood and does ❑ Yes
Type of If"Yes", qualifies for
the construction qualify
Construction as "conventional light ® No the prescriptive path.
frame" construction?
Is the spacing 24 inches
or less?
Pre-engineered trusses. ❑ Yes If"Yes", qualifies for
the prescriptive path.
® No
Roof framing
members Is the spacing 24 inches
or less?
Nominal lumber. If"Yes", qualifies for
❑ Yes the prescriptive path.
® No
Is the combined weight ❑ Yes
of the PV modules and If"Yes", qualifies for
racking less than or ® No the prescriptive path.
Solar equal to 4.5 psf?
installation Is the solar installation
layout in accordance ❑ Yes
with Section 305.4(3) of If"Yes", qualifies for
®
the 2010 Oregon Solar No the prescriptive path.
Code?
❑ Metal
Single layer If roofing material is
RoofingCheck the type of ® of wood
shin le/shake one of the three types
material roofing material g checked, qualifies for
Max. two layers the prescriptive path.
® of composition
shingle.
Is the roof mounted ❑ Yes
Connections of solar assembly
the solar assembly connected to roof If"Yes", qualifies for
® No the prescriptive path.
to the roof framing or blocking
directly?
2
I:/Building/Forms/Photo Voltaic-Checklist.docx
E
Yes If"Yes", qualifies for
Is the gauge 26 or less?
® No the prescriptive path.
115 lbs for 60 inch
spacing or less?
If"Yes", qualifies for
El
Yes the prescriptive path.
® No
Minimum Uplift rating
of Clamps? 75 lbs for 48 inches
spacing or less?
If"Yes", qualifies for
❑ Yes the prescriptive path.
® No
Attachment of
roof mountedMinimum 24 inches If the spacing falls
solar systems Spacing of clamps? within 24 inches and 60
directly to inches Maximum 60 inches inches, qualifies for the
standing seam prescriptive path.
metalanels If the width of the panel
P Width of roofing is less than 18 inches,
panels? 18 inches or less qualifies for the
inches prescriptive path.
Minimum#10 at 24
inches o/c?
Size and spacing of If"Yes", qualifies for
fastener? El Yes the prescriptive path.
® No
Is the roof decking of
WSP min. %2"thickness, ❑ Yes
decking connected to If"Yes", qualifies for
framing members ® No the prescriptive path.
w/min. 8d nails @
6"/12"o/c?
Is the height less than or
Maximum 18 inches equal to 18 inches?
Height of the from the top of the If"Yes", qualifies for
solar modules module to the roof El Yes the prescriptive path.
surface. ® No
3
I:/Building/Forms/PhotoVoltaic-Checklist.docx
Submittal Documents required for Prescriptive Installations
Show the location of the PV system in relation to buildings, structures,
property lines, and, as applicable, flood hazard areas.
Site Plan Details must be clear and easy to read.
Minimum size of the plan is 8.5 x 11 inches.
Attach a simple structural plan showing the roof framing(rafter size, type, and
spacing) and PV module system racking attachment.
System must be shown in sufficient detail and clarity to assess whether it
Structural Plan meets the prescriptive construction requirements as listed earlier above in the
matrix.
Minimum size of the plan is 8.5 x 11 inches.
PV Modules
Manufacturer: Hanwha
Model Number: Qpeak DUO 385
Listing Agency: 1703
4
I:/Building/Fonns/PhotoVoltaic-Checklist.docx
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
13258 SW APPLE GROVE TER, SHERWOOD, February 1 , 2019 at
OR, 97140 10:31 :02 AM
Record Type: Record ID:
Residential - Master Permit MST2018-00358
Inspection Type: Inspector:
299 Final inspection David Young
Result:
PASS - NoCofO
Comments:
Final ok per approved plans.
Violation Summary:
Inspector Contractor
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
13258 SW APPLE GROVE TER, SHERWOOD, February 1 , 2019 at
OR, 97140 10:29:37 AM
Record Type: Record ID:
Residential - Master Permit MST2018-00358
Inspection Type: Inspector:
199 Electrical final David Young
Result:
PASS
Comments:
Violation Summary:
Inspector Contractor