Special Inspection
FINAL SUMMARY LETTER \,
December 19,2018
Job#: T1805113
City of Tigard
13125 SW Hall Blvd
Tigard,OR 97223-8199
Attn: Building Division
Re: Project Name: Dirksen Nature Park—Restroom
Address: 11130 SW Tigard Street—Tigard,OR
Permit#: BUP2018-00207
Per Chapter 17,Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following
item(s)per our inspection reports only:
Reinforced Concrete
Structural Masonry
All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of
our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable
workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes,approvals and
verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects,
deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type.
Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractors work may
exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members
of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to
be conclusive representations of fact. Our reports pertain to the material tested/inspected only.
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods,
techniques,sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further
questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
<, (3„,••\ \i-:\e/k."\f'"
Greg Leeper —Pk/
Project Manager
GUks
cc: Columbia Construction Inc—Sherry Dirks
City of Tigard—Jeff Peck
Columbia Construction Inc—Erick Kruse