Loading...
Correspondence - LG\ 'l ARCHITECT ' S FIELD ORDER 40E) 4 At N O . 1 3241 ;ANO +� PROJECT: Red Rock Building B CAP:ir DATE: August 1,2016 1 ,. OWNER: Doug Fry •C‘S 908 Deborah Rd Newburg, Oregon 97312 TO: Emmett Phair Construction ARCHITECTS 16650 Fir Ln PROJECT NO: AD 15-154 Lake Oswego, OR 97034 Attn: Scott Emmett The contractor shall issue immediately to the Owner,Owner's Representative and Architect an itemized proposal prior to ordering and/or installing the Work described in this addendum.This itemized proposal will identify if this addendum constitutes a deductive, additive,or no change in contract sum and/or contract time.The Work outlined in this addendum shall be promptly implemented if approved by the Owner. Architectural Drawings FO1.0 A2.0 New Site Plan A)Remove new bike rack and concrete pad at SW corner of building C. FO1.1 A2.3 Site Details A) 3/A2.3 Remove new bike rack and concrete pad. FO1.2 A3.0 Overall Floor Plan—First Floor A) Provide and install new wall-mounted bike racks, (2) in Lobby 100, (1) in Stair 2 and (1) in Stair 3. FO1.3 A3.1 Enlarged Floor Plan—First Floor A)Provide and install new wall-mounted bike racks, (2)in Lobby 100, (1) in Stair 2 and(1) in Stair 3. B) Add note (20) to read "Provide and install new wall-mounted Huntco Staple Bike Racks. Provide backing in wall as required for mounting." ATTACHMENTS: A2.0,A2.3,A3.0,A3.1 ARCHITECT : Anderson Dabrowski Architects, LLC BY: Margaret Wilson RECEIVED CC: All Attendees AUG 2 2016 AD File CITY OF TIGARD ANDERSON DABROWSKI ARCHITECTS, LLC BUILDING DIVISION 1430 SE 3rd Avenue, Suite 200 Portland, Oregon 97214 Tel 503.239.7377 Fax 503.239.7327