ARCHITECT ' S FIELD ORDER
40E) 4 At
N O . 1 3241
;ANO +�
PROJECT: Red Rock Building B CAP:ir
DATE: August 1,2016 1 ,.
OWNER: Doug Fry •C‘S
908 Deborah Rd
Newburg, Oregon 97312
TO: Emmett Phair Construction ARCHITECTS
16650 Fir Ln PROJECT NO: AD 15-154
Lake Oswego, OR 97034
Attn: Scott Emmett
The contractor shall issue immediately to the Owner,Owner's Representative and Architect an itemized proposal prior to ordering
and/or installing the Work described in this addendum.This itemized proposal will identify if this addendum constitutes a deductive,
additive,or no change in contract sum and/or contract time.The Work outlined in this addendum shall be promptly implemented if
approved by the Owner.
Architectural Drawings
FO1.0 A2.0 New Site Plan
A)Remove new bike rack and concrete pad at SW corner of building C.
FO1.1 A2.3 Site Details
A) 3/A2.3 Remove new bike rack and concrete pad.
FO1.2 A3.0 Overall Floor Plan—First Floor
A) Provide and install new wall-mounted bike racks, (2) in Lobby 100, (1) in Stair 2 and (1)
in Stair 3.
FO1.3 A3.1 Enlarged Floor Plan—First Floor
A)Provide and install new wall-mounted bike racks, (2)in Lobby 100, (1) in Stair 2 and(1) in
Stair 3.
B) Add note (20) to read "Provide and install new wall-mounted Huntco Staple Bike Racks.
Provide backing in wall as required for mounting."
ATTACHMENTS: A2.0,A2.3,A3.0,A3.1
ARCHITECT : Anderson Dabrowski Architects, LLC
BY: Margaret Wilson RECEIVED
CC: All Attendees AUG 2 2016
AD File
CITY OF TIGARD
ANDERSON DABROWSKI ARCHITECTS, LLC BUILDING DIVISION
1430 SE 3rd Avenue, Suite 200
Portland, Oregon 97214
Tel 503.239.7377 Fax 503.239.7327