Report (98) r t \--A-o c
COMcheck Software Version 4.0.6.0 ad
Interior Lighting compliance Certificate
RECEIVED
Project Information MAY 2 2201
Energy Code: 90.1 (2010)Standard
Project Title: Cycle Bar CITY OF TIGARD
Project Type: Alteration BUILDING DIVISION
Construction Site: Owner/A.: ,1FC1 PR Ores Designer/Contractor:
12284 SW,Scholls Ferry Road ,-`\ ' NCCINCE- s!0 Peter A. Leptuch,P.E.
SUTigard,lTE OR 97223 / `ry 4; 9 '- 1236 Golden Eagle Court
5 gp { Aubrey,TX 76227
(940)735-5127
iriifr Air • t pleptuch@yahoo.com
t
`-'„ OREGON ciN oZ"
Allowed Interior Lighting Power ,c4���1Ry A0 2 .tJ
AgOAM �-� B C D
Area Category f Floor Area Allowed Allowed Watts
EXPIRES /4/3/A9' (ft2) Watts 1 ft2 (B X C)
1-Cycle Studio(Gymnasium/Fitness Center:Fitness Area) 3459 0.72 2490
Total Allowed Watts= 2490
Proposed Interior Lighting Power
A B C D E
Fixture ID:Description/Lamp/Wattage Per Lamp 1 Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Cycle Studio(Gymnasium/Exercise Center:Exercise Area 3459 sq.ft.)
Compact Fluor 1:PEN:Pendant:Twin Tube 13W:Electronic: 3 3 39 117
Compact Fluor 2:D:Downlight:Triple 4-pin 32W:Electronic: 1 48 32 1536
Compact Fluor 3:D2:Downlight w/Damper:Triple 4-pin 32W:Electronic: 1 4 32 128
Linear Fluor 1:ST:Strip Light:24"T8U 32W:Electronic: 2 4 64 256
Linear Fluorescent 3:BW:Brand Wall Lighting:48"T8 25W(Super T8):Electronic: 1 10 25 Exempt
Exemption:Advertising/Directional Signage
Total Proposed Watts= 2037
Interior Lighting PASSES
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans,specifications,and other calculations submitted with this permit application.The proposed interior lighting
I systems have been designed to meet the 90.1 (2010)Standard requirements in COMch , rsion 4.0.6.0 and to comply with
any aappl able mandatory re uiremen listed in the Inspection Che •. ,
6. 4-,:r .0
.,---.. .. .,,J ciri,
Name-Title /-'....__ _C-r a#C2,.
{ Signature Date �''
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\_(P-2017)\_17.007 GHA-CB-Tigard,OR\_17.007 GHA-CB- Page 1 of 12
Tigard, OR-2014 Oregon Comcheck(UNTOUCHED).cck
COMcheck Software Version 4.0.6.0
5 Mechanical Compliance Certificate
Project Information
Energy Code: 90.1 (2010)Standard
Project Title: Cycle Bar
Location: Tigard,Oregon
Climate Zone: 4c
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
12284 SW.Scholls Ferry Road Peter A. Leptuch,P.E.
SUITE A 1236 Golden Eagle Court
Tigard,OR 97223 Aubrey,TX 76227
(940)735-5127
pleptuch@yahoo.com
Mechanical Systems List
Quantity System Type&Description
- 2 RTU-2,3(7.5 TON)
Heating:1 each-Central Furnace,Gas,Capacity=180 kBtuth
Proposed Efficiency=81.00%Et,Required Efficiency=80.00%Et
Cooling:1 each-Single Package DX Unit,Capacity=83 kBtu/h,Air-Cooled Condenser,Air Economizer
Proposed Efficiency=11.10 EER,Required Efficiency: 11.00 EER
Fan System: None
SYSTEM COMPLIANCE REQUIRED.
1 RTU-1 (5.0 TON)
Cooling: 1 each-Single Package DX Unit,Capacity=59 kBtu/h,Air-Cooled Condenser,Air Eco ' 'ii510) PR°P
Proposed Efficiency=14.10 SEER,Required Efficiency: 13.00 SEER \.' NGINC 6'6>
Fan System: None t`'+ '� �9 0
SYSTEM COMPLIANCE REQUIRED. t, �p f
1
I Water Heater(GAS) t I _-,�,,. r.� yi
f-
Gas Storage Water Heater,Capacity:98 gallons,Input Rating:76 Btu/h w/Circulation Pumk-0, q OREGON Y
Proposed Efficiency:80.00%Et,Required Efficiency:80.00%Et ,), /1"e/ RY 10 PJC)
SWH COMPLIANCE REQUIRED. 1OA M 1-C'
•
EXPIRES. i 3
Mechanical Compliance Statement A
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 90.1 (2010)Standard requirements in COMch k ersi
4.0. .0 a d to comply with any applicable
at
/ .
mandry requirements II ted in e Ins ection Checklist.
or/17/19_
ep
Name-TMe ` Signature Date
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\ (P-2017)\_17.007 GHA-CB-Tigard,OR\_17.007 GHA-CB- Page 2 of 12
` Tigard,OR-2014 Oregon Comcheck(UNTOUCHED).cck
COMcheck Software Version 4.0.6.0
Inspection Checklist
Energy Code: 90.1 (2010) Standard
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed: Where compliance is itemized in a separate table, a reference to that table is provided.
Section
Plan Review Complies? Comments/Assumptions
& Req.ID'
4,2.2,6.4. Plans, specifications, and/or ❑Complies
14.2.1,6.7. calculations provide all Information ❑Does Not
'2 with which compliance can be
[PR2]1 determined for the mechanical ❑Not Observable
systems and equipment and ❑Not Applicable
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
4.2.2,7.7. Plans, specifications, and/or ❑Complies
11,10.4.2 calculations provide all information EDoes Not
[PR3]i with which compliance can be
determined for the service water ❑Not Observable
heating systems and equipment and ❑Not Applicable
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
4.2.2,9.4. Plans, specifications,and/or ❑Complies
4,9.7 calculations provide all information ODoes Not
[PRO with which compliance can be
determined for the interior lighting ['Not Observable
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed.Information
provided should include interior
lighting power calculations,wattage of
bulbs and ballasts, transformers and
control devices.
!6.7.2.4 Detailed instructions for HVAC ❑Complies
3[PR5]1 systems commissioning Included on ❑Does Not
the plans or specifications for projects ❑Not Observable
>=50,000 ft2,
❑Not Applicable
Additional Comments/Assumptions:
1'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\(P-2017)\_17.007 GHA-CB-Tigard,OR\_17.007 GHA-CB- Page 3 of 12
Tigard,OR-2014 Oregon Comcheck(UNTOUCHED).cck
Section
# Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.8 Freeze protection and snow/ice ❑Complies
[FO9I3 melting system sensors for future ❑Does Not
connection to controls.
ONot Observable
ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\_(P-2017)\_17.007 GHA-CB-Tigard,OR\_17.007 GHA-CB- Page 4 of 12
Tigard,OR-2014 Oregon Comcheck(UNTOUCHED).cck
Section
# Plumbing Rough-In inspection Complies? Comments/Assumptions
&Req.1D
'7.4,4.1 Temperature controls installed on ❑Complies
EPL2j3 service water heating systems ODoes Not
(<=12OsF to maximum temperature --
for intended use). LJNot Observable
❑Not Applicable
7.4,4.2 Automatic time switches installed to ❑Complies
[PL3ji automatically switch off the ❑Does Not
recirculating hot-water system or heat ❑Not Observable
trace.
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\_(P-2017)\_17.007 GHA-CB-Tigard,OR\_17.007 GHA-CB- Page 5 of 12
Tigard,OR-2014 Oregon Comcheck(UNTOUCHED).cck
:: °
..Mechanical Rough-In Plans Verified Field VerifiedCompliesComments/Assumptions
eq.ID
16.4.1.4,6. HVAC equipment efficiency Efficiency:_ Efficiency: OComplies See the Mechanical Systems list
14.15 verified. Non-NAECA HVAC ❑Does Not for values.
[ME1]2 equipment labeled as meeting
90.1. ❑Not Observable
ONot Applicable
:6.4.3.4.1 Stair and elevator shaft vents OComplies
1[ME3]3 have motorized dampers that ❑Does Not
automatically close.
ONot Observable
ONot Applicable
;6.4.3.4.2, Outdoor air and exhaust systems DComplies
;6.4.3.4.3 have motorized dampers that ❑Does Not
(ME4]3 automatically shut when not in
use and meet maximum leakage Not Observable
rates.Check gravity dampers ❑Not Applicable
where allowed.
16.4.3.4.5 Enclosed parking garage DComplies
1[ME39]3 ventilation has automatic ❑Does Not
1 contaminant detection and
j capacity to stage or modulate ❑Not Observable
fans to 50%or less of design ONot Applicable
i
capacity.
16.4.3.4.4 Ventilation fans>0.75 hp have OComplies
[ME5.i3 automatic controls to shut off fan ❑Does Not
1 when not required.
ONot Observable
ONot Applicable
6.4.3.9 Demand control ventilation ❑Complies
[ME6]1 provided for spaces >500 ft2 and ODoes Not
>40 people/1000 ft2 occupant
density and served by systems ['Not Observable
with air side economizer,auto ONot Applicable
modulating outside air damper
control,or design airflow>3,000
cfm.
6.4.3.10 Single zone HVAC systems with DComplies See the Mechanical Systems list
`[ME40]2 fan motors>=5 hp have variable ❑Does Not for values.
airflow controls.Air conditioning
equipment with a cooling ONot Observable
capacity>=110,000 Btu/h has ONot Applicable
i variable airflow controls.
16.4.3.10 Single zone HVAC systems with DComplies See the Mechanical Systems list
[ME40]2 fan motors>=5 hp have variable ❑Does Not for values.
airflow controls.Air conditioning
equipment with a cooling ['Not Observable
capacity>=110,000 Btu/h has DNot Applicable
variable airflow controls.
- 6.4.4.1.1 Insulation exposed to weather DComplies
1[ME7]3 protected from damage. ❑Does Not
Insulation outside of the
conditioned space and associated ONot Observable
i. with cooling systems is vapor ONot Applicable
retardant.
.6.4.4.1.2 HVAC ducts and plenums R- R-__-_ DComplies
[ME8]2 insulated.Where ducts or ❑Does Not
plenums are installed in or under
a slab,verification may need to ONot Observable
occur during Foundation ONot Applicable
1 Inspection.
16.4.4.1.3 HVAC piping insulation thickness. i in. in. DComplies
i[ME9]2 Where piping is installed in or ❑Does Not
under a slab,verification may
need to occur during Foundation :Not Observable
Inspection. ❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\_(P-2017)\_17.007 GHA-CB-Tigard, OR\_17.007 GHA-CB- Page 6 of 12
Tigard,OR-2014 Oregon Comcheck(UNTOUCHED).cck
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
Req.ID
6.4.4.1.4 Thermally ineffective panel ❑Complies
[ME41]3 surfaces of sensible heating ❑Does Not
panels have insulation >= R-3.5.
ONot Observable
ONot Applicable
6.4.4.2.1 Ducts and plenums sealed based ❑Complies
[ME10]2 on static pressure and location. ODoes Not
❑Not Observable
ONot Applicable
16.4.4.2.2 Ductwork operating >3 in.water ❑Complies
[ME11]3 column requires air leakage ODoes Not
testing.
ONot Observable
❑Not Applicable
'6.4.4.2.2 Ductwork operating >3 in. water ❑Complies
[ME11]3 column requires air leakage ODoes Not
testing.
ONot Observable
❑Not Applicable
16.5.1,6.5. Air economizers provided where ❑Complies
11.1,6.5.1. required, meet the requirements ODoes Not
13 for design capacity,control
[ME12]1 signal,ventilation controls,high-
:Not Observable
limit shut-off, integrated ONot Applicable
economizer control,and provide
a means to relieve excess
outside air during operation.
'6.5.1,6.5. Air economizers provided where ❑Complies
1.1,6.5.1. required, meet the requirements ODoes Not
3 for design capacity,control
[ME12)1 signal,ventilation controls, high- ❑Not Observable
limit shut-off,integrated ONot Applicable
economizer control,and provide
a means to relieve excess
outside air during operation.
6.5.2.3 Dehumidification controls ❑Complies
[ME19]3 provided to prevent reheating, ODoes Not
recooling,mixing of hot and cold
airstreams or concurrent heating ONot Observable
and cooling of the same ONot Applicable
airstream.
6.5.3.3 Multiple zone VAV systems with ❑Complies See the Mechanical Systems list
[ME42]3 DDC of individual zone boxes ODoes Not for values.
have static pressure setpoint
reset controls.
ONot Observable
❑Not Applicable
6.5.3.3 Multiple zone VAV systems with ❑Complies See the Mechanical Systems list
[ME42]3 DDC of individual zone boxes ODoes Not for values.
have static pressure setpoint
reset controls. ONot Observable
ONot Applicable
6.5.4.1 HVAC pumping systems>10 hp ❑Complies
[ME25)3 designed for variable fluid flow. ❑Does Not
ONot Observable
ONot Applicable
6.5.6.1 Exhaust air energy recovery on ❑Complies
[ME56]1 systems meeting Table 6.5.6.1. ODoes Not
❑Not Observable
Dot Applicable
1 High Impact(Tier 1) 2 :Medium Impact(Tier 2) 3 Low Impact(Tier 3) I
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\_(P-2017)\_17.007 GHA-CB-Tigard, OR\_17.007 GHA-CB- Page 7 of 12
Tigard,OR-2014 Oregon Comcheck(UNTOUCHED).cck
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
j& Req.ID ,
6.5.7.1.1 Kitchen hoods>5,000 cfm have DComplies
;[ME3212 make up air>=50%of exhaust ODoes Not
air volume.
❑Not Observable
❑Not Applicable
6.5.7.1.5 Approved field test used to DComplies
1[ME49]3 evaluate design air flow rates ❑Does Not
and demonstrate proper capture
and containment of kitchen ❑Not Observable
exhaust systems. ❑Nat Applicable
16.5.7.2 Fume hoods exhaust systems DComplies
[ME33]' >=15,000 cfm have VAV hood ❑Does Not
exhaust and supply systems,
direct make-up air or heat ❑Net Observable
recovery. DNot Applicable
16.5.8.1 Unenclosed spaces that are DComplies
I[ME34]2 heated use only radiant heat. ❑Does Not
❑Not Observable
❑Not Applicable
6.5.9 Hot gas bypass limited to: <=240 DComplies
[ME35]' kBtu/h-50%>240 kBtu/h-25% ❑Does Not
❑Not Observable
❑Not Applicable
6.5.9 Hot gas bypass limited to: <=240 DComplies
(ME35]' kBtu/h-50% >240 kBtu/h-25% ❑Does Not
❑Not Observable
ONot Applicable
7.4.2 Service water heating equipment DComplies
[ME3612 meets efficiency requirements. ❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\_(P-2017)\_17.007 GHA-CB-Tigard,OR\_17.007 GHA-CB- Page 8 of 12
Tigard,OR-2014 Oregon Comcheck(UNTOUCHED).cck
Section
• # Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
9.4.1.1 Automatic controls to shut off all ❑Complies
[EL1]2 building lighting. ❑Does Not
ONot Observable
ONot Applicable
19.4.1.2 Independent lighting controls installed ❑Complies
[EL2]2 per approved lighting plans and all ❑Does Not
1 manual controls readily accessible and
visible to occupants. ONot Observable
❑Not Applicable
:9.4.1.3 Parkinggarage lighting is equipped g g q pped ❑Complies
1[EL11]2 with required lighting controls and DDoes Not
daylight transition zone lighting.
Pilot Observable
ONot Applicable
9.4.1.4 Primary sidelighted areas>=250 ft2 ❑Complies
[EL12)1 are equipped with required lighting ❑Does Not
controls.
ONot Observable
ONot Applicable
9.4.1.5 Enclosed spaces with daylight area ❑Complies
[EL13]1 under skylights and rooftop monitors Does Not
>900 ft2 are equipped with required
lighting controls, ONot Observable
ONot Applicable
9.4.1.6 Separate lighting control devices for ❑Complies
[EL4)1 specific uses installed per approved ❑Does Not
lighting plans.
ONot Observable
❑Not Applicable
!9.4.2 Exit signs do not exceed 5 watts per ❑Complies
[EL6]1 face. Does Not
ONot Observable
ONot Applicable
19,6.2 Additional interior lighting power ❑Complies
[ELS]' allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and ONot Observable
separated from general lighting. ONot Applicable
10.4.1 Electric motors meet requirements ❑Complies
E[EL9]2 where applicable. ❑Does Not
ONot Observable
ONot Applicable
Additional Comments/Assumptions:
1 high Impact(Tier 1) 2 Medium Impact(Tier 2) 3 ,Low Impact(Tier 3) l
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\_(P-2017)\_17.007 GHA-CB-Tigard,OR\_17.007 GHA-CB- Page 9 of 12
Tigard, OR-2014 Oregon Comcheck(UNTOUCHED).cck
•
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
16.4.3.1,2 Thermostatic controls have a 5 °F ❑Complies
[F13)3 deadband. ❑Does Not
❑Not Observable
{
DNot Applicable
6.4.3.2 Temperature controls have setpoint ❑Complies
[F120]3 overlap restrictions. ❑Does Not
DNot Observable
DNot Applicable
16.4.3:3.1 HVAC systems equipped with at least ❑Complies
[F121]3 one automatic shutdown control. ❑Does Not
1
['Not Observable
DNot Applicable
16.4.3.3.2 Setback controls allow automatic ❑Complies
[F122]3 restart and temporary operation as ❑Does Not
required for maintenance. ❑Not Observable
❑Not Applicable
6.4.3.7 When humidification and ❑Complies
[FI6]3 dehumidification are provided to a ❑Does Not
zone,simultaneous operation is
:Not Observable
prohibited.
❑Not Applicable
6.7.2.1 Furnished HVAC as-built drawings ❑Complies
[FI7]3 submitted within 90 days of system ❑Does Not
acceptance.
DNot Observable
CINot Applicable
6.7.2.2 Furnished O&M manuals for HVAC ❑Complies
(FI8)3 systems within 90 days of system ❑Does Not
acceptance.
DNot Observable
❑Not Applicable
:............
6.7.2.3 An air and/or hydronic system ❑Complies
[F19]' balancing report is provided for HVAC ❑Does Not
systems serving zones>5,000 ft2 of ❑Not Observable
conditioned area.
ONot Applicable
6.7.2.4 HVAC control systems have been ❑Complies
1[FI10]' tested to ensure proper operation, ❑Does Not
calibration and adjustment of controls. ❑Not Observable
❑Not Applicable
7.4.4.3 Public lavatory faucet water ❑Complies
[F111]3 temperature<=110°F. ❑Does Not
DNot Observable
DNot Applicable
7.4.4.4 Controls are installed that limit the ❑Complies
[F112]3 operation of a recirculation pump ❑Does Not
installed to maintain temperature of a
storage tank. :Not Observable
DNot Applicable
8.7.1 Furnished as-built drawings for ❑Complies
[FI16]3 electric power systems within 30 days ❑Does Not
of system acceptance.
:Not Observable
[Not Applicable
8.7.2 Furnished O&M instructions for ❑Complies
I[F117]' systems and equipment to the ❑Does Not
building owner or designated f`
representative.
[Not Observable
❑Not Applicable 1
1 !High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\_(P-2017)\_17.007 GHA-CB-Tigard, OR\_17.007 GHA-CB- Page 10 of 12
Tigard,OR-2014 Oregon Comcheck(UNTOUCHED).cck
Section . ....__.._.,.,,....
r # Final inspection Complies? i Comments/Assumptions
& Req.ID
9.2.2,3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values.
(FliB]' lighting power is consistent with what ❑Does Not
is shown on the approved lighting
plans,demonstrating proposed watts ONot Observable
are less than or equal to allowed ONot Applicable
watts.
110.4.3 Elevators are designed with the ❑Complies
[F124]2 proper lighting,ventilation power,and ❑Does Not
standby mode.
ONot Observable
[Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cycle Bar Report date: 05/17/17
Data filename: C:\Users\Mike Palmer\Dropbox\ (P-2017)\_17.007 GHA-CB-Tigard,OR\_17.007 GHA-CB- Page 11 of 12
Tigard,OR-2014 Oregon Com-Check(UNTOUCHED).cck
Project Title: Cycle Bar Report date: 05/I7117
Data filename: C:\Users\Mike Palmer\Dropbox\ (P-2017)\ 17,007 GHA-CB-Tigard,OR\_17.007 GHA-CB- Page 12 of 12
Tigard,OR-2014 Oregon Comcheck(UNTOUCHED).cck