11-November (5) CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2018-00308
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/07/2018
I r;;ti I=.t: 9 Parcel: 1S135AB00900
Jurisdiction: Tigard
Site address: 10200 SW GREENBURG RD 500
Project: Bridgewell Resources Subdivision: METZGER,TOWN OF Lot: 9
Project Description: Demolition,new walls,and new doors for TI.
Contractor: RUSSELL CONSTRUCTION INC Owner: LINCOLN CENTER LLC
20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC
TUALATIN, OR 97062 555 CALIFORNIA ST 49TH FL
SAN FRANCISCO, CA 94104
PHONE: 503-692-9002 PHONE: 503-412-4800
FAX: 503-692-9008
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Ig DC Provision Review,COM TI-Ping 11/07/2018 $98.00
Occupancy Grp: B Occupancy Load: 173 Permit Fee-Additions,Alterations, 11/07/2018 $195.38
Demolition
Dwelling Units: 0 12%State Surcharge-Building 11/07/2018 $23.45
Stories: 0 Height: 0 ft Plan Review 11/07/2018 $127.00
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 11/07/2018 $78.15
Value: $7,197 Info Process/Archiving-Lg$2.00(over 11/07/2018 $4.00
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $525.98
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by call' g.503,212.1987 or 1.800.332.2344.
OjeIssued By: Permittee Signature: fir
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of thq project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
.,
Commercial FOR OFFICE USE ONLY
: Cityl 3 12 5 S of
THalliTigard,OR 97223
IIIgBahirdd., Received
1\11IV j i /u1 Date/B :
. ' Plan Revie, 1 .,
' 6. Phone: 503.718.2439 Fax: 503.598.1960 ,,--.,, . .. .. Date/By: .1 )"` ‘"') C*
7./, / ?„ Pe„ivity1,020/X ,ce)r-.
Other Permit:
4 P V !!,' f'j 1' 4 p,g
TIGARD Inspection Line: 503.639.4175 ''-'t o. f, k...k .L.,i'`1±1,..e3, Date Ready/By: kris: IZI See Page 2 for
Internet: www.tigard-or.gov r-)Tr?ilF ,Th.,- -, , ,. , _ Notified/Method: Supplemental Information
''.1l,, t:/1A( CYA/74.21 ^;-1
17yls,g,.1;)v,woRKR ;; ,H:92F,:,:!':':;i :':Ilr:: -,, i: i,, , )RX011,111Wpp474,1::1,r.ATNpli;747.4mItyRING:,„,„,,,
0 New construction 0 Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
[E]Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
OF"CATEC;ORY,, ±,CONTSTRTIeTki:14 ::i:.P;, ::::::,',!:':. .. !1. ,:,. :',H:
Valuation: $
0 1-and 2-family dwelling 0 Commercial/industrial
0 Accessory building 0 Multi-family Number of bedrooms:
0 Master builder 0 Other: Number of bathrooms:
JOii:,41,iii44.4.it4iiii6iAiiiiiii6.Aii6i4,,,, : 1,• :'-*'', ,*!, :, Total number of floors:
Job site address:5 Lincoln-10200 SW Greenburg Road New dwelling area: square feet
City/State/ZIP:Portland,OR 97223 Garage/carport area: square feet
Suite/bldg./apt.no.:500 Project name:Bridgewell Resource Covered porch area: square feet
Cross street/directions to job site:Project located north of SW oak street, Deck area: square feet
south of SW Locust Street and east of Greenburg Road Other structure area: square feet
' IRCQVIKT;A:X.O.$0:€0CIAL-1-TJSt. *p.•::40'Ti'i
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel no.:
equipment,materials,labor,overhead,and the profit for the
OESCRIPTION'''Or Wtittkiumii'. :,.1 ', 1m:;i1191. ]::iiiiii: Iiii work indicated on this application.
' "::!!:!!E.:!:::!!E'!! 1':i!:i:igl
Work to include demolition,new walls,and doors Valuation: $$7,197.00
Existing building area: 17286 square feet
New building area: 17286 square feet
..:,,,i,,, ,,,,.!,,..q,,,.,,,;,„;,.,: ,,s0,!,m!,11i!,0,
nli!!!11 ;Qiii ,gr$ilifitorERTrVWiMg*N1HlimiNi,,,,,!::ii? ,Ni!lt.; ],,;,ii ,,TEN-ANT ,„„„„,,,,,,,,„„„„;,,,,, Number of stories: 7
' ' :Y,, ,;,-*,.o, i:,:'. ii ].;:,Ail!ll'HI..wi;
Name:Shorenstein Type of construction: I-B
Address:5800 Meadows Road,Suite 240 Occupancy groups:
City/State/ZIP:Lake Oswego,OR 97035 Existing: B
Phone:(503)412-4800 Fax:(503)412-4903 New: B
ii. ,,,. .„.,,.,.,, .iii0fii-: :!4iDuAEtmL,','DI, rpili!F, . , ,.ii.. .T.„,::milq,111 _ ,,,,,,,„,,,,,,, ,.., _..._,_,...,,,,
ieklAL+',AL'', NTNiiiii,niEfHintfi&ii:: !.].i. ,itmii ,:;:uiiCONTAUT;',.YILRN'ON:1i.m .H .r, ,„,.„,-2„,„„,;.,„„„,,,,,miuEB 1,m,.,j)': 'ThiGTERMIT..ffEs ];imfl!liltil.tillii:niiii
etOffellt.iifriii.Siiii‘iik41;iiqiiiigii.gu.::;,:igE.g.:i]
Business name:Mackenzie
Structural plan review fee(or deposit):
Contact name:Kelly Battaglia
FLS plan review fee(if applicable):
Address:1515 SE Water Ave Suite 100
Total fees due upon application:
City/State/ZIP:Portland,OR 97214
Amount received:
Phone:(503)224-9560 Fax::(503)228-1285
:00070V.014TAit-SOVAI:t*AN't $VSTMFEtSt: 11.4
E-mail:kbattaglia@mcknze.com
.,,,,!,,,,i-4,,,,,..,..ir!'iTI!;1,_„„,...,„......, , ,tNi4. ,.A.pl. , !„„ m,t,,,:,, ,1 Commercial and residential prescriptive installation of
' *7. . .!E !,NnPEP:i;!:!lil'igii[ ;11111ZMiq:ii' 'il! roof-top mounted Photo Voltaic Solar Panel System.
Business name:Russell Construction Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:20915 SW 105th Ave Solar Installation Specialty Code checklist.
City/State/ZIP:Tualatin,OR 97062 Permit fee(includes plan review
$180.00
and administrative fees):
Phone:(503)692-9002 Fax:(503)692-9008
State surcharge(12%of permit fee): $21.60
CCB lie.:58918
Total fee due upon application: $201.60
'- _
4
---- This permit application expires if a permit is not obtained
Authorized signature:
within 180 days after it has been accepted as complete.
Print name:Kelly Battaglia Date:03/15/2018 * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
City of Tigard • BUILDING DIVISION
IOver-The-Counter (OTC) Building & Fire Protection System Permit
TIGARD Appointment Checklist
Permit Record#: Xi(A f3epe 30
Contact Name: kc.//1 /r, /;, Phone #: Av3 2.2,4_qs o
Business Name: /`� tz.z.,vz,le. Appt. Date/Time: N 7//g @. -ea „r,
Site Address: /d Zjo a,. Oe-e#^ Bldg/Suite #: ,SZ77
Project Name: p New Tenant? ❑ Yes "`r No
Project Description: �,) C4/a// ,L,,,1 60/*IAA) ItCW"
Existing Use: New Use: /'
MMD Required: ❑ Yes ISL No Related Record #: ---
y.'„., il :',; Ee, "t::,::_,,'P L QIN SIS > ,2A `RO ( TI5/ ', -,= OVIMP ORIPYt.W
GENERAL INFORMATION
Class of Work: £ )--T. Occupancy Group: p Type of Construction: 1— J
Type of Use: ,Cj Occupancy Load: 173 Oregon Specialty Code: as,I tJ.,
SPECIFICS
Number of Stories: Building Height: Mixed Use:
Number of Dw Units: Number of Bathrooms: Number of Bedrooms:
BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES
Story Square Footage: Accessory Structure: Covered Porch:
Basement: Garage: Deck:
Total Square Footage: Carport: Mezzanine:
SETBACKS
Sideyard Setback—Left Sideyard Setback—Front
Sideyard Setback—Right Sideyard Setback—Back
CONSTRUCTION
Exterior Walls: Openings Protected: Firewall Separation:
N: S: N: S: Occupancy Separation:
E: W: E: W: Access.Parking Spaces:
REQUIRED ITEMS
Fire Sprinklers: \J e� Fire Alarms: Smoke Detectors:
Sprinkler Type: Alarm Type: Protected Corridors:
Standpipe Required: Pull Stations Required: Parapet:
Hazard Group: Battery Calcs Provided:
Density: Cut Sheets Provided:
Design Area:
K Factor:
Total Project Valuation: $ 711q7 ° �iFEES �,, w h ` ;
$ 1
g DC Prov Rvw,COM TI—Ping
$ 1 9��g Permit Fee—Add,Alt,Demo
DC Provision Review Fee for COM TI(effective 7/1/2018) $ )..43, 51 < 12%State Surcharge
Project Valuation $ ,7`]. 0� Plan Review,Structural
Up to$4,999 $0.00 $ g . 1 Plan Review,Fire Life Safety
$5,000-$74,999 $98.00 $ 4 Info Proc/Arch,Lg(over 11x17$2.00)
$75,000-$149,999 $243.00 $ Info Proc/Arch,Sm(up to 11x17$0.50)
$150,000 and over $388.00 $ Metro Construction Excise Tax
$ School Construction Excise Tax
4-5---: ( .-L/ _i_4‹,,.. $ Hourly Rate Fee
�$ Hourly Rate State Surcharge
$ Misc.Admin Fee
$ Other:
Building Staff: $ Other:
Date/Time: $ j a .98 TOTAL FEES DUE
I:\Building\Forms\OTC_BUP_FPS_070118.docx
Front1 DSTS
Subject: Kelly @ McKenzie; 10200 SW Greenburg Rd Suite 500; Bridgewell Resources; (503)
224-9560
Location: CR 3 Permit Center
Start: Wed 11/7/2018 10:00 AM
End: Wed 11/7/2018 11:00 AM
Recurrence: Weekly
Recurrence Pattern: every Tuesday,Wednesday, and Thursday from 10:00 AM to 11:00 AM
Meeting Status: Meeting organizer
Organizer: -Building_OTC
Resources: CR 3 Permit Center
Call Handling Mode 2: 2
TI for existing tenanat: (1) new wall and (1) new door.
This email is confidential, may be legally privileged, and is intended solely for the addressee. If you are not the intended recipient,
As email can be altered, its integrity access is prohibited. rity is not guaranteed.9
From: Branden Taggart<brandent@tigard-or.gov>
Sent:Tuesday, October 30, 2018 2:23 PM
To: Kelly Battaglia <KBattaglia@mcknze.com>
Cc: Lindsey Carpenter<LCarpenter@mcknze.com>; #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Subject: RE: OTC Appointment Request
Hi Kelly,
I can schedule you for one of the following OTC appointments next week:
Wednesday, November 7 at 10:00 a.m.
Thursday, November 8 at 10:00 a.m.
Which appointment would you like?The balance due will be $521.98 plus the archiving fee.
Thanks,
Branden Taggart
q City of Tigard
Senior Permit Technician
Community Development
!GARD
13125 SW Hall Blvd
Tigard,OR 97223
(503)718-2449'
brandent@tigard-or.gov
From: Kelly Battaglia [mailto:KBattaglia@ mcknze.com]
Sent:Tuesday, October 30, 2018 1:27 PM
To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Cc: Lindsey Carpenter<LCarpenter@mcknze.com>
Subject: RE: OTC Appointment Request
Hello,
We'd like to schedule another OTC appointment starting next week. The project is Bridgewell, 5 Lincoln, 10200 SW
Greenburg Rd, suite 500 . The current use of the space is office and the continued use of space will also be office.The
scope of work includes one new wall and one new door.Valuation is$7,197. Could you please provide us with the
permit fee amount?
Thank you!
Kelly Battaglia
Interiors I LEED Green Associate
Fie Fe.'
2
. .
Architecture Interiors Engineering Planning
P 503.224.9560 W mcknze.com C vcard
RiverEast Center
1515 SE Water Ave, Suite 100
Portland OR 97214
This email is confidential, may be legally privileged, and is intended solely for the addressee. If you are not the intended recipient,
access is prohibited. As email can be altered, its integrity is not guaranteed.
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule."
3
City of Tigard
e COMMUNITY DEVELOPMENT DEPARTMENT
■
TIGARD Building Permit Review — Commercial - No Land Use
Building Permit #: ) UI�r01- 2) o f
Site Address: 102-60 Su C r«, r� P, Suite/Bldg#: COO
Project Name: (/-Af?1,,,A1 Rt 61r(t5
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: IL 6r (!t,,.. to �} ; ( ) (cw SII 0,,,61 0,) rt,,,, S6 J . M it-l{n`rr
Existing Business Activity: Ace
Proposed Business Activity: C i-c-
Verify site address/suite#exists and active in permit syste .
eI9ver Terrace Neighborhood: ❑ Yes ft No
FL�f' oning: VIU ^I
ermitted Use: FE' Yes I=1 No El Spec Space
onfirm no land use required.
Business License:
Exists: ❑ Yes No,applicant notified to obtain business license
Notes:
LApproved by Planning: Date: 11-7 l b
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: /
Site Plans: #
Building Plans: #
Building Permit#: V ter building permit#above.
Workflow Routing: f/.' lanning �x+et `-Building
Workflow Sign-off: Sign-off for Pl nning(include notes from planning review)
Route Application Documents: Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes: j
By Permit Technician: / L,,,/,_,/': / Date: /
IF
I:\Building\Forms\BldgPermitRvw_COM_NoLandUse_060116.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
O Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applic t:
Revision Notice 3: Date Sent to A., cant:
O SDC Fees Entered: Wash Co "rans Dev Tax: 0 Yes 0 N/A
Tig. rans SDC: 0 Yes 0 N/A
arks SDC: 0 Yes 0 N/A
❑ OK to Issue Permi
Approved by ' -rmit Coordinator: Date:
I:\Building\Forms\BldgPermitRvw_COM NoLandUse_070915.docx