Loading...
Report (117) DEL 14795PORTLANDSW. 72OR"d Avenue97224 � � 3 SlSVC) j+--erri"� �' • ? "* i` , PHONE 503-702 620 4020 FIRE, INC. FAX 503-620-1058 2018 CCB# 64174 it td 6t t LETTER OF TRANSMITTAL TO: CITY OF TIGARD DATE: 11/30/2018 JOB #: 18-5884 13125 SW HALL BLVD ATTENTION:PERMIT DESK TIGARD OR 97223 RE: COMPASS ONCOLOGY WESTSIDE PH: 503-718-2439 CANCER CENTER VIA: HAND DELIVERY COPIES NUMBER DESCRIPTION 1 PERMIT APPLICATION 3 DATA SUBMITTAL (ARCHITECT REVIEWED) 3 PLAN SET (ARCHITECT REVIEWED/PE STAMPED) REMARKS: REPLY REQUIRED: YES n NO f BY DATE:ASAP BY: ANGELA CARTALES, PROJECT ADMIN 503-620-4020 X-109/angic@deltafire.com FIRE PROTECTION CONTRACTORS C 2018 @y 'F Seubert Engineering DESIGNING& CONSULTING FROM CONCEPT TO PRODUCTION. 25125 S. Mt. View Rd. Robert C. Seubert, PE Phone/Fax(503) 824-5030 Colton, OR 97017 Rseubert@aiseubertmachininq.com Cell (503) 805-2920 Delta Fire, Inc. 11/29/18 14975 S.W. 72nd Ave. Portland, OR 97224 ATT: Angie Subject: System Review/PE Stamping Tigard Westside Cancer Center Delta project#18-5884 Hi Angie, I've reviewed the two drawings for this project. Scope of work is tenant improvement with head relocations. Design criteria is per NFPA#13. I find no concerning issues with the design or layout with respect to the applicable NFPA standards the project is adhering to. Given the compliance with the stated and supplied specifications it's my pleasure to approve this packaged with my PE stamp. Best Regards, Robert Seubert, PE DEC 3 2013 Seubert Engineering DESIGNING&CONSULTING FROM CONCEPT TO PRODUCTION. 25125 S. Mt. View Rd. Robert C. Seubert, PE Phone/Fax(503) 824-5030 Colton, OR 97017 Rseubert@seubertmachininq.com Cell (503) 805-2920 Delta Fire, Inc. 11/29/18 14975 S.W. 72nd Ave. Portland, OR 97224 ATT: Angie Subject: System Review/PE Stamping Tigard Westside Cancer Center Delta project #18-5884 Hi Angie, I've reviewed the two drawings for this project. Scope of work is tenant improvement with head relocations. Design criteria is per NFPA#13. I find no concerning issues with the design or layout with respect to the applicable NFPA standards the project is adhering to. Given the compliance with the stated and supplied specifications it's my pleasure to approve this packaged with my PE stamp. Best Regards, Robert Seubert, PE DEL 3 Z013 1 Seubert Engineering DESIGNING& CONSULTING FROM CONCEPT TO PRODUCTION. 25125 S. Mt. View Rd. Robert C. Seubert, PE Phone/Fax (503) 824-5030 Colton, OR 97017 RseubertOseubertmachininq.com Cell (503) 805-2920 Delta Fire, Inc. 11/29/18 14975 S.W. 72nd Ave. Portland, OR 97224 ATT: Angie Subject: System Review/PE Stamping Tigard Westside Cancer Center Delta project#18-5884 Hi Angie, I've reviewed the two drawings for this project. Scope of work is tenant improvement with head relocations. Design criteria is per NFPA #13. I find no concerning issues with the design or layout with respect to the applicable NFPA standards the project is adhering to. Given the compliance with the stated and supplied specifications it's my pleasure to approve this packaged with my PE stamp. Best Regards, Robert Seubert, PE