Report (117) DEL 14795PORTLANDSW. 72OR"d Avenue97224 � � 3 SlSVC) j+--erri"� �' • ? "* i`
,
PHONE 503-702
620 4020
FIRE, INC. FAX 503-620-1058 2018
CCB# 64174
it td 6t t
LETTER OF TRANSMITTAL
TO: CITY OF TIGARD DATE: 11/30/2018 JOB #: 18-5884
13125 SW HALL BLVD ATTENTION:PERMIT DESK
TIGARD OR 97223 RE: COMPASS ONCOLOGY WESTSIDE
PH: 503-718-2439 CANCER CENTER
VIA: HAND DELIVERY
COPIES NUMBER DESCRIPTION
1 PERMIT APPLICATION
3 DATA SUBMITTAL (ARCHITECT REVIEWED)
3 PLAN SET (ARCHITECT REVIEWED/PE STAMPED)
REMARKS:
REPLY REQUIRED: YES n NO f BY DATE:ASAP
BY: ANGELA CARTALES, PROJECT ADMIN 503-620-4020 X-109/angic@deltafire.com
FIRE PROTECTION CONTRACTORS
C 2018
@y 'F
Seubert Engineering
DESIGNING& CONSULTING FROM CONCEPT TO PRODUCTION.
25125 S. Mt. View Rd. Robert C. Seubert, PE Phone/Fax(503) 824-5030
Colton, OR 97017 Rseubert@aiseubertmachininq.com Cell (503) 805-2920
Delta Fire, Inc. 11/29/18
14975 S.W. 72nd Ave.
Portland, OR 97224
ATT: Angie
Subject: System Review/PE Stamping
Tigard Westside Cancer Center
Delta project#18-5884
Hi Angie,
I've reviewed the two drawings for this project. Scope of work is tenant improvement with head relocations.
Design criteria is per NFPA#13.
I find no concerning issues with the design or layout with respect to the applicable NFPA standards the project is
adhering to.
Given the compliance with the stated and supplied specifications it's my pleasure to approve this packaged with my
PE stamp.
Best Regards,
Robert Seubert, PE
DEC 3 2013
Seubert Engineering
DESIGNING&CONSULTING FROM CONCEPT TO PRODUCTION.
25125 S. Mt. View Rd. Robert C. Seubert, PE Phone/Fax(503) 824-5030
Colton, OR 97017 Rseubert@seubertmachininq.com Cell (503) 805-2920
Delta Fire, Inc. 11/29/18
14975 S.W. 72nd Ave.
Portland, OR 97224
ATT: Angie
Subject: System Review/PE Stamping
Tigard Westside Cancer Center
Delta project #18-5884
Hi Angie,
I've reviewed the two drawings for this project. Scope of work is tenant improvement with head relocations.
Design criteria is per NFPA#13.
I find no concerning issues with the design or layout with respect to the applicable NFPA standards the project is
adhering to.
Given the compliance with the stated and supplied specifications it's my pleasure to approve this packaged with my
PE stamp.
Best Regards,
Robert Seubert, PE
DEL 3 Z013
1
Seubert Engineering
DESIGNING& CONSULTING FROM CONCEPT TO PRODUCTION.
25125 S. Mt. View Rd. Robert C. Seubert, PE Phone/Fax (503) 824-5030
Colton, OR 97017 RseubertOseubertmachininq.com Cell (503) 805-2920
Delta Fire, Inc. 11/29/18
14975 S.W. 72nd Ave.
Portland, OR 97224
ATT: Angie
Subject: System Review/PE Stamping
Tigard Westside Cancer Center
Delta project#18-5884
Hi Angie,
I've reviewed the two drawings for this project. Scope of work is tenant improvement with head relocations.
Design criteria is per NFPA #13.
I find no concerning issues with the design or layout with respect to the applicable NFPA standards the project is
adhering to.
Given the compliance with the stated and supplied specifications it's my pleasure to approve this packaged with my
PE stamp.
Best Regards,
Robert Seubert, PE