Resolution No. 18-54 CITY OF TIGARD, OREGON
TIGARD CITY COUNCIL
RESOLUTION NO. 18- S 7
A RESOLUTION AMENDING THE MASTER FEES AND CHARGES SCHEDULE TO BE
CONSISTENT WITH RECENT AMENDMENTS TO THE COMMUNITY DEVELOPMENT CODE
OF THE CITY OF TIGARD.
WHEREAS, the Tigard City Council adopted amendments to the Tigard Community Development Code on
December 11,2018 (DCA2018-00004);and
WHEREAS, the proposed amendments to the Master Fees and Charges Schedule are necessary to maintain
consistency between the Tigard Community Development Code and the Master Fees and Charges Schedule;
and
WHEREAS, the proposed amendments are administrative in nature. No new fees or fee increases are
proposed,with the exception of assigning the standard Type II review fee to the new extension application that
was adopted as part of the code amendments described above.
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION 1: The amendments to the Master Fees and Charges Schedule that are attached as Exhibit A.1
are hereby adopted. Exhibit A.2 is a clean version of the amendments and is provided
for reference only.
SECTION 2: This resolution shall be effective on January 31,2019.
PASSED: Thist day of
Mayor ty of Tigard
ATTEST:
�e�' ' AKMAA�-�
City Recorder-City of Tigard
RESOLUTION NO. 18-
Page 1
EXHIBIT A.1
City of Tigard
Master Fees and Charges Schedule FY 18/19
Community Development — Development Services Planning
Amendments are shown as follows:
Text with bold,italics, and underline is new text.
Text with is deleted text.
APPLICATION TYPE . .
ACCESSORY DWELLING UNITIs $ 272
ADJUSTMENT $ 388
ANNEXATION (Quasi-judicial) $ 3,641
APPEAL
Type II to Hearings Officer $ 250
Expedited Review(Deposit) $ 300
Type III $ 3,661
APPROVAL OV\7 L VTEN SION �89
COMPREHENSIVE PLAN MAP AMENDMENT (Quasi-judicial) $ 4,580
(`OM PDL'LrENSIVE PLAN TEXT �, 4
CONDITIONAL USE $ 7.248
New at Nl�or Madifieft6aft $ 7-z48
$ 794
DEVELOPMENT CODE REVIEW
Single-Family Building Plan $ 98
Commercial/Industrial/Institutional—New Development $ 388
Commercial/Industrial/Institutional—Tenant Improvements in Existing Development
Project Valuation up to$4,999 $ -
Project Valuation$5,000 -$74,999 $ 98
Project Valuation$75,000-$149,999 $ 243
Project Valuation$150,000 or more $ 388
DIRECTOWS DETERMINATION�GGD TN�RR4A IGN $ 794
DOWNTOWN DESIGN REVIEW
Track 1 $ 133
Page 1 of 4
EXHIBIT A.1
Track 2
Under$1,000,000 $ 1,855
base*Plus 0.004 x project
valuation
$1,000,000 and Over(Maximum Fee of$25,000) $ 7,152
lease—*Plus 0.002 x project
valuation
Track 3 $ 3,763
lyse+Plus applicable
Track2F fee
EXTENSION
Tvne I $ 388
Tvne II $ 794
cn
New Gonstmetion,Exterior After-i fieft,or Dem OaaeR
HOME OCCUPATION PERMIT
Type 1 $ 134
Type II $ 325
LAND PARTITION
2 Lots $ 4,362
3 Lots $ 5,245
Expedited $ 6,121
Final Plat $ 1,218
LOT LINE ADJUSTMENTZGW LOT CONSOLIDr1TION $ 794
MARIJUANA FACILITY PERMIT $ 774
MISCELLANEOUS LAND USE REVIEW
Adequate Public Facilities Exception(inside River Terrace) $ 794
Historic Resource Designation/Removal ofDesignaaon $ 9,667
Historic Resource Construction/Alteration/Demolition $ 850
Transportation A&I794(inside Tigard T�anele) $ 794
MODIFICATION
Tune I $ 325
Tvne II $ 3.500
NON !`l1hTL'llDT,ING USE BETEPQ11,14TTIGN 4-94
Page 2 of 4
EXHIBIT A.1
PLANNED DEVELOPMENT
Goneurrettt lleftr�tg(Gafteeptual Platt aftd Detailed 9 evelopment Plan Review)
Consolidated Concept and Detailed Plan $ 10,083
-with Land Division(in lieu of Subdivision or Partition fee) if S4&o-isim;Add$93/lot
Conceptual Plan $ 10,083
Detailed Developmeftt Plan $ 3,50040,08.3
-with Land Division Cin lieu of Subditision or Partition fee) T«--tf,Add$93/lot
PRE-APPLICATION CONFERENCE
Type II $ 325
Type III $ 780
PROTECT/PLAT NAME CHANGE $ 444
RENOTIFICATION FOR HEARING POSTPONEMENT $ 441
SENSTIVE LANDS REVIEW
Type I $ 794
Type II $ 3,482
Type III $ 3,761
SIGN PERMIT
New xnid-orModification to as Existing Sign $ 218
Temporary Sign $ 69
SITE DEVELOPMENT REVIEW
Tvne I
Under 13 Dwelling Units $ 388
13 Dwelling Units and Over $ 794
T
ute II
Under$1,000,000 $ 6,150
$1,000 MiUiatt and Over $ 7,989
base+Plus$6/each$10,000 over$1Mfft�hott
SUBDIVISION
Preliminary Plat $ 9,653
Plus$93/lot
P..,.li ffi ftar Plat with Plaii ed De_,.i,.ptne_t 40,083
plus$93 per lot
Page 3 of 4
EXHIBIT A.1
Expedited Preliminary Plat $ 8,140
Plus$93/lot
Final Plat $ 2,455
Plat Name C=haftge 444
TEMPORARY USE PERMIT
Type I $ 388
Special Exemption/Non-Profit Organization $ -
Special Mixed Use-Central Business District Zone Rate
1st Temporary Use in a Calendar Year $ 388
2nd Through 5th Temporary Use With Substantially the Same Site Plan Within $ 69
A Calendar Year
URBAN FORESTRY
Plan Modification $ 764
Discretionary Plan Review(with concurrent Type III review) $ 478
Discretionary Plan Review(without concurrent Type III review) $ 2,945
SpeeialAdjust
rte'`'4 �eH�9 Q[
mg
Tjpe4l 81-54
ZONING MAP AMENDMENT(Quasi-judicial) $ 4,580
ZONING ANALYSIS LETTER(DETAILED) $ 794
ZONING INQUIRY LETTER(SIMPLE) $ 116
Community Development — Miscellaneous Development
Type H(Major)Modification Project Valuation Threshold* $50.000
Public Works — Development Engineering
Tigard Triangle Mixed Use Zone—Fees and Charges
Plan CheckMeetinE neer-:~o Pre Ser-e.._ Gori fereti e
Page 4 of 4
EXHIBIT A.2
City of Tigard
Master Fees and Charges Schedule FY 18/19
Community Development — Development Services Planning
APPLICATION TYPE s
ACCESSORY DWELLING UNIT $ 272
ADJUSTMENT $ 388
ANNEXATION (Quasi-judicial) $ 3,641
APPEAL
Type II to Hearings Officer $ 250
Expedited Review(Deposit) $ 300
Type III $ 3,661
COMPREHENSIVE PLAN MAP AMENDMENT (Quasi-judicial) $ 4,580
CONDITIONAL USE $ 7,248
DEVELOPMENT CODE REVIEW
Single-Family Building Plan $ 98
Commercial/Industrial/Institutional—New Development $ 388
Commercial/Industrial/Institutional—Tenant Improvements in Existing Development
Project Valuation up to$4,999 $ -
Project Valuation$5,000 -$74,999 $ 98
Project Valuation$75,000-$149,999 $ 243
Project Valuation$150,000 or more $ 388
DIRECTOR DETERMINATION $ 794
DOWN'T'OWN DESIGN REVIEW
Track 1 $ 133
Track 2
Under$1,000,000 $ 1,855
Plus 0.004 x project valuation
$1,000,000 and Over(Maximum Fee of$25,000) $ 7,152
Plus 0.002 x project valuation
Track 3 $ 3,763
Plus applicable Track 2 fee
Page 1 of 4
EXHIBIT A.2
EXTENSION
Type I $ 388
Type II $ 794
HOME OCCUPATION PERMIT
Type I $ 134
Type II $ 325
LAND PARTITION
2 Lots $ 4,362
3 Lots $ 5,245
Expedited $ 6,121
Final Plat $ 1,218
LOT LINE ADJUSTMENT/LOT CONSOLIDATION $ 794
MARIJUANA FACILITY PERMIT $ 774
MISCELLANEOUS LAND USE REVIEW
Adequate Public Facilities Exception (inside River Terrace) $ 794
Historic Resource Designation/Removal of Designation $ 5,667
Historic Resource Construction/Alteration/Demolition $ 850
Transportation Mitigation (inside Tigard Triangle) $ 794
MODIFICATION
Type I $ 325
Type II $ 3,500
PLANNED DEVELOPMENT
Consolidated Concept and Detailed Plan $ 10,083
-with Land Division (in lieu of Subdivision or Partition fee) Add$93/lot
Concept Plan $ 10,083
Detailed Plan $ 3,500
-with Land Division (in lieu of Subdivision or Partition fee) Add$93/lot
PRE-APPLICATION CONFERENCE
Type II $ 325
Type III $ 780
PROJECT/PLAT NAME CHANGE $ 444
RENOTIFICATION FOR HEARING POSTPONEMENT $ 441
SENSTIVE LANDS REVIEW
Type I $ 794
Page 2 of 4
EXHIBIT A.2
Type II $ 3,482
Type III $ 3,761
SIGN PERMIT
New or Modification to Existing Sign $ 218
Temporary Sign $ 69
SITE DEVELOPMENT REVIEW
Type I
Under 13 Dwelling Units $ 388
13 Dwelling Units and Over $ 794
Type 11
Under$1,000,000 $ 6,150
$1,000,000 and Over $ 7,989
Plus$6/each$10,000 over$1M
SUBDIVISION
Preliminary Plat $ 9,653
Plus$93/lot
Expedited Preliminary Plat $ 8,140
Plus$93/lot
Final Plat $ 2,455
TEMPORARY USE PERMIT
Type I $ 388
Special Exemption/Non-Profit Organization $ -
Special Mixed Use-Central Business District Zone Rate
1st Temporary Use in a Calendar Year $ 388
2nd Through 5th Temporary Use with Substantially the Same Site Plan within $ 69
a Calendar Year
URBAN FORESTRY
Plan Modification $ 764
Discretionary Plan Review(with concurrent Type III review) $ 478
Discretionary Plan Review(without concurrent Type III review) $ 2,945
ZONING MAP AMENDMENT(Quasi-judicial) $ 4,580
ZONING ANALYSIS LETTER(DETAILED) $ 794
ZONING INQUIRY LETTER(SIMPLE) $ 116
Page 3 of 4
EXHIBIT A.2
Community Development — Miscellaneous Development
Type II (Major) Modification Project Valuation Threshold* $50,000
Public Works — Development Engineering
Tigard Triangle Mixed Use Zone—Fees and Charges
Plan Check Nfeeting
Page 4 of 4