Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Specifications (33)
Hydraulic Calculations a� S� WaS . for Project Name: Landrover Jaguar Location: 10125 WASHINGTON SQ ROAD, PORTLAND OREGON, Drawing Name: Landrover FP.cad Calculation Date: 9/14/2018 Design Remote Area Number: 1 Remote Area Location: Demo Handover Occupancy Classification: Ordinary Group I O� Commodity Classification: Auto Parking �� §G Density: 0.15gpm/ft2 E: 4z a Area of Application: 1500ft2(Actual 2098ft2) Coverage per Sprinkler: 130ft2 NOV 14 2018 Type of sprinklers calculated: Pendent CITY' No. of sprinklers calculated: 12 In-rack Demand: N/A gpm at Node: N/A Hose Streams: 250.00 at Node: 1 Type: Allowance at Source Total Water Required (including Hose Streams where applicable): From Water Supply at Node 1: 501.86 @ 56.472 Type of System: Dry Volume of Dry or PreAction System: N/A PROfe,,, Via`' 4* 44, 41. 5MOPE rlc-S Name of Contractor: AFP SYSTEMS INC OREA Address: 19435 SW 129th Ave, Tualatin, OR 97062 `Z),13 Phone Number: (503)692-9284 ��qq�) C.• Name of designer: DAVE PARFITT 7/1120 Authority Having Jurisdiction: °' Notes: �2©M.E.P.CAD, Inc. AutoSPRINK 2018 v14.2.12.0 1 9/14/2018 2:26:19PM Page 1 Hydraulic Graph Job Name: Landrover Jaguar N 1 85 Remote Area Number: 1 Date: 9/14/2018 100 = Water Supply Summary Sheet 90 - Node: 1 Static Pressure 85.000 Available Supply 80 591.88'gg 79.020- 70 80 251.88 58.472 • 4 I 1200.00 @ 55.000 501.88 with Hose Allowance at Source E r50 n. co 40 30 System demand curve 20 N 10 0 II ini !i III I I I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5025000 750 1000 1250 1500 1750 2000 22F0 2500 0 Flow-gpm &C)M.E.P.CAD, Inc. AutoSPRINK 2018 v14.2.12.0 9/14/2018 2:26:20PM Page 2 illummary Of Outflowing Devices ` Job Number:Landrover Jaguar Report Description:Ordinary Group I(1) Actual Flow Minimum Flow K-Factor Pressure Device (g pm) (gpm) (K) (psi) Sprinkler 2033 23.29 19.50 5.6 17.303 Sprinkler 2034 22.42 19.50 5.6 16.032 Sprinkler 2035 22.18 19.50 5.6 _15.689 Sprinkler 2043 23.32 19.50 5.6 17.340 Sprinkler 2044 21.01 19.50 5.6 14.078 Sprinkler 2045 20.78 19.50 5.6 13.771 Sprinkler 2061 20.21 19.50 5.613.026 Sprinkler 2062 19.99 19.50 5.6 12.739 Sprinkler 2067 19.83 19.50 5.6 12.536 Sprinkler 2068 19.61 19.50 5.6 12.258 Sprinkler 2070 19.72 19.50 5.6 12.401 E, Sprinkler 2071 19.50 19.50 5.6 12.125 ate Most Demanding Sprinkler Data (ky©M.E.P.CAD,Inc. ;"i=AutoSPRINK 2018 v14.2.12.0 9/14/2018 2:26:26PM Page 3 Job Name: Landrover Jaguar Remote Area Number: 1 Date: 9/14/2018 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings& Total(Pt) Node 1 K-Factor this step Nominal ID (Foot) Fitting/Device(Equivalent (Foot) Devices (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses, E uiv. (Foot) Elev 2 Total Flow q Loss Per Unit - when applicable,are added Node 2 Actual ID Length Total si (Foot) (Q) (Psi) Friction(Pf) directly to(Pf)and shown as (Foot) (Foot) 2071 8'-6 5.6 19.50 1 (See 1'-0 100 12.125 Route 1 Sprinkler Notes) -0.434 0.173991 - 562 9'-6 19.50 1.0490 1'-0 0.174 562 9'-6 1 (See 7'-11'/2 120 11.866 Notes) 9'-0 -2.818 444 16'-0 19.50 1.0490 0.124177 2E(2'-0),P0(5'-0) 16'-11%2 2.105 444 16'-0 1% 12'-6 120 11.153 432 16'-0 19.50 1.6820 0.012458 12'-6 0.156 432 16'-0 19.61 1'/2 12'-6 120 11.309 Flow(q)from Route 2 419 16'-0 39.11 1.6820 - 0.045138 12'-6 0.564 '/2 12'-6 120 11.873 419 16'-0 19.99 1 Flow(q)from Route 5 390 16'-0 x 7:`" 59.09 1.6820 0.096879 �. � 12'-6 1.211 390 16'-0 20.78 11/2 (See 5'-0 120 13.084 Notes) Flow(q)from Route 7 9'-11 377 16'-0 r 79.88 1.6820 PP 0.169177 P0(9'-11) 14'-11 2.521 15'-2'/2 120 15.605 377 16'-0 22.18 21/2 Flow(q)from Route 9 376 16'-0 ;PA 102.06 2.6350 0.029909 15'-2%2 0.455 376 16'-0 80.77+22.42 2% 14'-21/2 120 16.059 Flow(q)from Route 3 and 10 0.108937 375 16'-0 205.25 2.6350 14'-21/2 1.548 375 16'-0 23.29+23.32 21/2 (See 7'-11/2 120 17.608 Flow(q)from Route 11 and 12 Notes) 8'-3 0.159077 E(8'-3) 373 16'-0 aptjtt 251.86 2.6350 15-41/2 2.447 373 16'-0 4 (See 13'-0 120 20.055 Notes) 13'-2 -5.636 374 29'-0 251.86 4.2600 0.015331 - E(13'-2) 26'-2 0.401 '% (See 111'-4 120 14.820 374 29'-0 2 Notes) 16'-5'/2 370 29'-0 251.86 2.6350 0.159077 P0(16'-51/2)t , 127'-10 20.333 ©M.E.P.CAD,Inc. El AutoSPRINK 2018 v14.2.12.0 1 9/14/2018 2:26:27PM Page 4 Job Name: Landrover Jaguar Remote Area Number: 1 Date: 9/14/2018 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings& Total(Pt) Node 1 (Foot) K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses, Equiv. (Foot) Elev 2 > Total Flow Loss Per Unit when applicable,are added Node 2 Actual ID Length Total (Foot) (Q) (Foot) (Foot) (psi) Friction(Pf) directly to(Pf)and shown as a naga+i"o.,a+„o 370 29'-0 4 (See 366'-10'/2 120 35.153 Notes) 136-11'/2 0.434 695 28'-0 251.86 4.2600 0.015331 6E(13'2),EE(5'-3),2T(26'-4) 503'-9 h 7.724 695 28'0 ti 4 (See 26'-11'/2 100 43.310 Notes) 58'-2/2 11.073 0.021482 2E(9'-41/2),DPV(9'4'/2),BV(11'- 574 2'-5/2 251.86 4.2600 85'-2 1.830 3), P0(18:-91/2) 574 2'-5'% 6 (See 3'-7 120 56.213 Notes) 56'-7 -1.036 0.002183 2fE(12'-7),fT(31'-5) 526 4'-1044.,.4. 251.86 6.3570 60'-2 0.131 526 4'-10 6 (See 164'-0 140 55.308 Notes) 44'-1'/2 0.801 0.001741 BFP,2E(22'-1),S 1 3'-0 a 251.86 6.2800 208'-1 0.362 _ /2 250.00 56.472 Hose Allowance At Source - 1 501.86 Total(Pt) Route 1 2068 8'-6 5.6 19.61 1 (See 1'-0 100 12.258 Route 2 Notes) Sprinkler -0.434 549 9'-6 19.61 1.0490 1'-0 - 0.175751 0.176 549 9'-6 1 (See 7'-11'/2 120 12.000 Notes) 9.-0 -2.818 0.125433 2E(2'-0),P0(5-0) 432 16'-0 guy 19.61 1.0490 16'-11'/2 2.126 11.309 Total(Pt) Route 2 1'-0 100 12.401 Route 3 2070 8'-6 5.6 19.72 1 (See Sprinkler Notes) -0.434 560 9'-6 ) "x� 19.72 1.0490 0.177650 1'-0 0.178 560 9'-6 1 (See 8'3 120 12.145 Notes) 9'-0 -2.818 I" 2E(2'-0),P0(5'-0) 438 16'-0 � '� 19.72 1.0490 17:-3 0.126788 2.187 438 16'-0 1% 12'-6 120 11.515 ' - 0.012720 426 16'-0 It 19.72 1.6820 4 ``, 12'-6 0.159 ©M.E.P.CAD,Inc. di AutoSPRINK 2018 v14.2.12.0 1 9/14/2018 2:26:27PM Page 5 Job Name: Landrover Jaguar Remote Area Number. 1 Date: 9/14/2018 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings& Total(Pt) Node 1 (Foot) K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses, Equiv. (Foot) Elev 2 Total Flow _ Loss Per Unit when applicable,are added Node 2 Actual ID Length Total (Foot) (Q) (Foot) (Foot) (psi) Friction(Pf) directly to(Pf)and shown as '/2 12'-6 120 11.674 426 16'-0 19.83 1 Flow(q)from Route 4 413 16'-0 39.55 1.6820 - 0.046086 12'-6 0.576 413 16'-0 20.21 1'/2 12'-6 120 12.250 Flow(q)from Route 6 384 16'-0 59.76 1.6820 0.098910 12'-6 1.236 384 16'-0 21.01 1'/2 (See 5'-0 120 13.486 Notes) Flow(q)from Route 8 9'-11 376 16'-0 ' 80.77 1.6820 0.172707 P0(9'-11) 'fix 14'-11 2.574 16.059 Total(Pt) Route 3 2067 8'-6 5.6 19.83 1 (See 1'-0 100 12.536 Route 4 Notes) Sprinkler . 0.434 0.179440 - 546 9'-6 19.83 1.0490 1'-0 0.179 546 9'-6 1 (See 8'-3 120 12.282 Notes) 9'-0 -2.818 0.128066 - 2E(2'0),PO(5'-0) 426 16'-0 19.83 1.0490 17'-3 2.209 11.674 Total(Pt) Route 4 1,-0 100 12.739 Route 5 2062 8'-6 5.6 19.99 1 (See Sprinkler Notes) -0.434 534 9'-6 `_'" : 19.99 1.0490 1 0 0.182118 - 0.182 pap 534 9'-6 1 (See 7'-11'/2 120 12.487 Notes) 9'-0 -2.818 419 16'-0 k 19.99 1.0490 16'-11'/2 0.129978 2.203 2E(2'-0),P0(5'-0) 11.873 Total(Pt) Route 5 1,-0 100 13.026 Route 6 2061 8'-6 5.6 20.21 1 (See Sprinkler Notes) -0.434 532 9'-6 20.21 1.0490 0.185916 ' 1'-0 0.186 532 9'-6 1 (See 8'-3 120 12.779 Notes) 9'-0 -2.818 413 16 0 0.132688 2E(2'-0),P0(5'-0) ' 20.21 1.0490 1 T-3 2.289 s 12.250 Total(Pt) Route 6 /k,©M.E.P.CAD,Inc. ds'AutoSPRINK 2018 v14.2.12.0 1 9/14/2018 2.26:27PM Page 6 Job Name: Landrover Jaguar Remote Area Number: 1 Date: 9/14/2018 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings& Total(Pt) Node 1 (Foot) K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses, Elev 2 ''� Total Flow Equiv. (Foot) Loss Per Unit when applicable,are added Node 2 Actual ID Length Total (Foot) (Q) (Foot) (Foot) (Psi) Friction(Pf) directly to(Pf)and shown as a va0a*l.,9.,ai„o 2045 8'-6 5.6 20.78 1 (See 1'-0 100 13.771 Route 7 Notes) Sprinkler -0.434 499 9'-6 ` Z.' 20.78 1.0490 1'-0 - 0.195734 0.196 499 9'-6 1 (See 7'-11'h 120 13.534 Notes) 9,_0 -2.818 0.139695 2E(2'-0),P0(5'-0) 390 16'-0 20.78 1.0490 16'-111/2 2.368 13.084 Total(Pt) Route 7 1,-0 100 14.078 Route 8 2044 8'-6 5.6 21.01 1 (See Sprinkler Notes) -0.434 497 9'-6 € '', 21.01 1.0490 1'-0 0.199765 0.200 497 9'-6 1 (See 8'-3 120 13.845 Notes) 9,_0 -2.818 0.142572 2E(2'-0),P0(5'-0) 384 16'0 21.01 1.0490 17'-3 2.459 , �r 13.486 Total(Pt) Route 8 2035 8'-6 5.6 22.18 1 (See 1'-0 100 15.689 Route 9 Notes) Sprinkler -0.434 470 9'-6 22.18 1.0490 0.220815 1'-0 0.221 470 9'-6 1 (See 7'-11'/2 120 15.476 Notes) 9'-0 -2.818 ' 0.157596 2E(2'-0),P0(5'-0) 364 16'-0 22.18 1.0490 16'-11'/2 2.672 364 16'-0 11/2 (See 7'-6 120 15.330 Notes) 9'_11 ' 0.015811 P0(9'-11) 377 16'-0 22.18 1.6820 17'-5 0.275 15.605 Total(Pt) Route 9 1,-0 100 16.032 Route 10 2034 8'-6 5.6 22.42 1 (See Sprinkler Notes) -0.434 r 47=T-10.225275 468 9'-6 22.42 1.0490 1'40 0.225 468 9'-6 1 (See 8'-3 120 15.823 Notes) 9'-0 -2.818 358 16'-0 6 22.42 1.0490 0.160779 2E(2'-0),P0(5'-0) t 17'-3 2.773 (See 7'-6 120 15.779 358 16'-0 11/2 Notes) 9'-11 376 16'-0 22.42 1.6820 0.016130 PO(9' 11) .i.: 17'-5 0.281 o-Y ,,©M.E.P.CAD,Inc. AutoSPRINK 2018 v14.2.12.0 1 9/14/2018 2:26.27PM Page 7 Job Name: Landrover Jaguar Remote Area Number: 1 Date: 9/14/2018 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings& Total(Pt) Node 1 (Foot) K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses, ,h;< Equiv. (Foot) Elev 2 Total Flow — Loss Per Unit when applicable,are added Node 2 Actual ID Length Total (Foot) ' (Q) (Foot) (Foot) (Psi) Friction(Pf) directly to(Pf)and shown as ,;s`s a ne3mfi..a value 16.059 I Total(Pt) Route 10 2033 8'-6 5.6 23.29 1 (See 1'-0 100 17.303 Route 11 Notes) Sprinkler -0.434 464 9'-6 23.29 1.0490 1 0 0.241755 0.242 464 9'-6 1 (See 8'-5'/2 120 17.111 Notes) 9'-0 -2.818 354 16'-0 23.29 1.0490 0.172540 — 2E(2'-0), P0(5'-0) 17'-5 h 3.013 '/2 (See 7'-6 120 17.307 354 16'-0 1 Notes) 9'-11 375 16'-0 23.29 1.6820 1T-5 0.017310 0.301 P0(9'-11) 17.608 Total(Pt) Route 11 2043 8'-6 5.6 23.32 1 (See 1'-0 100 17.340 Route 12 Notes) Sprinkler -0.434 493 9'-6 ' 23.32 1.0490 744 r 0.242226 1'-0 0.242 493 9'6 1 (See 8'-5'/2 120 17.148 Notes) 9'-0 -2.818 380 16'0 i 3 23.32 1.0490 0.172876 2E(2'-0),P0(5'-0) 17'-5%2 3.019 380 16'-0 1'/2 (See 5'0 120 17.350 Notes) 9'-11 375 16.-0 23.32 1.6820 0.017344 P0(9'-11) 14'-11 0.258 17.608 Total(Pt) Route 12 h{,©M.E.P.CAD,Inc eivj AutoSPRINK 2018 v14.2.12.0 1 9/14/2018 2:26:27PM Page 8 Job Name: Landrover Jaguar Remote Area Number: 1 Date: 9/14/2018 Equivalent Pipe Lengths of Valves and Fittings(C=120 only) I [C Value Multiplier Actual Inside Diameter 4.87 Value Of C 100 130 140 150 =Factor ( Schedule 40 Steel Pipe Inside Diameter Multiplying Factor 0.713 1.16 1.33 1.51 Fittings Legend ALV Alarm Valve AngV Angle Valve b Bushing BaIV Ball Valve BFP Backflow Preventer BV Butterfly Valve C Cross Flow Turn 90° cplg Coupling Cr Cross Run CV Check Valve DeIV Deluge Valve DPV Dry Pipe Valve E 90°Elbow EE 45°Elbow Eel 113/44 Elbow Ee2 22W Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90°FireLock(TM)Elbow fEE 45°FireLock(TM)Elbow flg Flange FN Floating Node fT FireLock(TM)Tee g Gauge GIoV Globe Valve GV Gate Valve Ho Hose Hose Hose HV Hose Valve Hyd Hydrant LtE Long Turn Elbow mecT Mechanical Tee Noz Nozzle P1 Pump In P2 Pump Out PIV Post Indicating Valve PO Pipe Outlet PrV Pressure Relief Valve PRV Pressure Reducing Valve red Reducer/Adapter S Supply sCV Swing Check Valve SFx Seismic Flex Spr Sprinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Cap / ©M.E.P.CAD,Inc. AutoSPRINK 2018 v14.2.12.0 1 9/14/2018 2:26:27PM Page 9 Flow Diagram (Current View) Job Number:Landrover Jaguar 't ti Report Description:Ordinary Group I(1) ra.ypmil;.:i:t,. /-,1".11S,11r.: 1:01*)''I 4i 11 de 4 k,©M.E.P.CAD,Inc. '..1 AutoSPRINK 2018 v14.2.12.0 9/14/2018 2:26:28PM Page 10